This is a submittal register form for the Craney Island Eastward Expansion Dredging Phase 1C project, detailing required contractor submissions across multiple specification sections.
The register outlines key submittals including: weight certificates, view location maps, progress schedules, accident prevention plans, dive operations plans, monthly exposure reports, crane operator certifications, lift plans, quality control plans, environmental protection plans, endangered species work plans, dredging plant layouts, and dredging notifications to the U.S. Coast Guard and Virginia DEQ. Many items require government approval as indicated by "G" designations, particularly safety-related submissions like the Accident Prevention Plan, Dive Operations Plan, and Critical Lift Plan. The form includes submittal tracking columns for contractor schedule dates, approving authority actions, and submission status but these fields are blank in this template version.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
Craney Island Eastward Expansion Dredging Phase 1C
01 20 00 SD-03 Product Data
Weight Certificates
01 30 00 SD-01 Preconstruction Submittals
View Location Map
Progress and Completion
Pictures
01 32 01.00 10 SD-01 Preconstruction Submittals
3.2 GProgress Schedule
01 33 00 SD-01 Preconstruction Submittals
1.6 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7.1 GAPP - Construction
1.15 GDive Operations Plan
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.5Crane Operators/Riggers
1.7.3.2 GStandard Lift Plan
1.7.3.3 GCritical Lift Plan
1.7.3.4 GNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
01 35 26 1.9.1Hot Work Permit
1.12.4Certificate of Compliance
License Certificates
GRadiography Operation Planning
Work Sheet
GPortable Gauge Operations
Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
SD-11 Closeout Submittals
3.9.1Daily Quality Control Reports
01 57 19 SD-01 Preconstruction Submittals
GEnvironmental Protection Plan
SD-06 Test Reports
Water Quality Monitoring
01 57 50 SD-01 Preconstruction Submittals
1.4 GEndangered Species Work Plan
SD-06 Test Reports
1.4 GEndangered Species Work Plan
35 20 23 SD-01 Preconstruction Submittals
3.3.1 GDredge And Auxiliary Floating
Plant Layout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES
35 20 23 1.12.1Dredging Intent Notification To
The U.S. Coast Guard
1.12.2Dredging Intent Notification To
The Virginia DEQ
1.18.1 GList Of Floating Plant
1.5.1 GDesignated Acceptance Section
Plan
1.5.1 GDesignated Acceptance Section
Plan
1.5.2Request For Before Dredging
Survey
3.11.3 GTide Gauge Plan
SD-11 Closeout Submittals
1.5.3After Dredging Survey Request
35 20 23.13 SD-07 Certificates
1.4 GNational Dredging Quality
Management Program Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR