This abstract of offers document summarizes bids received in response to Solicitation Number W91236-21-B-2013 issued by the Department of the Army Corps of Engineers Engineering District Norfolk. The solicitation sought bids for the construction of a Cyber Operations Facility at Joint Base Langley Eustis.
Nine contractors submitted bids for the project, which includes constructing the cyber operations facility building, site work outside the five foot line, and optional items such as generators, HVAC equipment, landscaping, and furniture. Bid amounts ranged from $5,008,352 to $10,279,800. The government estimate for the project was $4,964,219. Required bid security was 20% and all bidders acknowledged amendments to the solicitation. Award is anticipated to be made to the responsible bidder offering the lowest price.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
USACE NAO-CT
803 Front Street Norfolk, VA 23510
5. PROJECT TITLE
CAS 1500 Cyber Operations Facility JB Langley Eustis
Construct Cyber Ops Facility
Construct Site Work Outside the 5 Foot Line
Option - 300 kw Generator Transfer Switch
Job
Job
5,546,000.00
2,861,000.00
155,000.00
5,546,000.00
2,861,000.00
155,000.00
4,964,219.00
1,539,056.00
128,167.00
4,964,219.00
1,539,056.00
128,167.00
1. SOLICITATION NUMBER
W91236-21-B-2013 1 3 2
A. OFFEROR
Tazewell Contracting
20%
Y
012/04/2020
119,781.00
Syncon
20%
Y
5,287,769.00 5,287,769.00
1,615,993.00 1,615,993.00
122,663.00
99,096.00
Job
2. DATE ISSUED
11/04/2020
Dianne K. Grimes
04 Dec 2020
0004 Option - 25-Ton CRAC Unit 1 Job 195,000.00 195,000.00 119,781.00
122,663.00
99,096.00
0005 Option - 100% Landscaping 1 Job
Total Evaluated Price 8,974,000.00 7,079,665.00 7,328,287.00
0006 Option - Furniture, Fixtures, and Equipment 1 Job
26,000.00
191,000.00
26,000.00
191,000.00
17,223.00 17,223.00
311,219.00 311,219.00
10,279.00 10,279.00
192,487.00 192,487.00
CONTINUATION SHEET
PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
NO.: NO.: NO.: NO.:
A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
1. SOLICITATION NUMBER
W91236-21-B-2013
2. PROJECT TITLE
CAS 1500 Cyber Operations Facility JB Langley Eustis
20%
Y Y
Job10003
Job0002
1 Job 4,918,322.00
2 3
A. OFFEROR A. OFFEROR
Doyon Government Group
4,918,322.00
1,600,616.00 1,600,616.00
119,252.00 119,252.00
TOTAL 6,998,900.00
20%
6,183,625.70 6,183,625.70
2,057,894.61 2,057,894.61
104,188.09 104,188.09
8,659,822.09
6,894,535.00
2,462,424.00
6,894,535.00
2,462,424.00
139,458.00
9,930,800.00
5,008,352.00
1,822,993.00
5,008,352.00
1,822,993.00
7,266,226
IAP Design-Build LLC
A. OFFEROR
Asford Leebcor Enterprises
20%
Y
20%
Y
0004 1 Job
3 4 5 6
Ocean Construction Services
99,888.00 99,888.00 106,979.86 106,979.86 141,809.00 141,809.00
106,872.00 106,872.00
104,844.00 104,844.00
1 Job
1 Job
10,289.00 10,289.00
250,533.00 250,533.00
10,452.78 10,452.78
196,681.05 196,681.05
139,458.00
51,153.00 51,153.00
241,421.00 241,421.00
42,020.00 42,020.00
181,145.00 181,145.00
CONTINUATION SHEET
PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
NO.: NO.: NO.: NO.:
A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
1. SOLICITATION NUMBER
W91236-21-B-2013
2. PROJECT TITLE
CAS 1500 Cyber Operations Facility JB Langley Eustis
20%
Y Y
Job10003
Job0002
1 Job
3 33
A. OFFEROR A. OFFEROR
1,990,000.00
99,000.00 99,000.00
TOTAL 8,312,000.00
20%
5,255,591.01 5,255,591.01
1,589,841.65 1,589,841.65
98,667.22 98,667.22
7,205,022.88
5,100,000.00
1,600,000.00
120,000.00
5,100,000.00
1,600,000.00
120,000.00
7,155,500.00
ITST Tactical Defense Solutions
A. OFFEROR
20%
Y
0004 1 Job
7 8 9
Benaka Inc.
99,000.00 99,000.00 107,453.71 107,453.71 115,000.00 115,000.00
1 Job
1 Job
Centennial Contractors Enterprises
5,925,000.00 5,925,000.00
1,990,000.00
30,000.00 30,000.00
169,000.00 169,000.00
50,347.90 50,347.90
103,121.39 103,121.39
15,000.00 15,000.00
205,000.00 205,000.00
| ABSTRACT OF OFFERORS - DLA WH4 Dock and Slabs |
| ABSTRACT OF OFFERORS.pg1 |
| ABSTRACT OF OFFERORS pg2 |
| ABSTRACT OF OFFERORS - additional sheet |
| Blank Page |
| 2020-12-07T17:21:55-0500 | |
| GRIMES.DIANNE.K.1041397027 |
File details come from the government source that posted it. Updated .