Attachment 4 (6) M-602 Amendment .pdf

PDF 161 KB Posted

Attached to
Cyber Operations Facility
Solicitation number
W9123621B2013
Issued by

About this file

This document contains a mechanical schedule and specifications for a Cyber Operations Facility project. Key details include mechanical equipment to be provided such as water source heat pumps, air handlers, fans, pumps, cooling towers, and electric boilers. It also includes specifications for air distribution devices including diffusers, grilles, and registers. The project is solicited under solicitation number W91236-21-B-2013 issued by the Department of the Army Corps of Engineers Engineering District Norfolk for an Invitation for Bid. The schedule provides requirements for equipment capacity, electrical characteristics, and installation notes.

View the file

Other files

File Type Posted
B.01.02_IFB Abstract of Offerors (1).pdf PDF
W91236-21-B-2013 Abstract of Bids.pdf PDF
W91236-21-B-2013 Amendment 0003_official.pdf PDF
Attachment 17_188820-09_ A-401-drawings revised 25 NOV 2020_ENLARGED PLANS bathroom.pdf PDF
Attachment 12_08 14 00_revised 25 NOV 2020_wood doors.pdf PDF
Attachment 13_08 71 00_revised 25 NOV 2020_Door Hardware.pdf PDF
Attachment 15_10 26 00_revised 25 NOV 2020_wall and door protection.pdf PDF
Attachment 14_10 21 13_revised 25 NOV 2020_toilet compartment.pdf PDF
Attachment 16_22 00 00_revised 25 NOV 2020_plumbing.pdf PDF
Attachment 11_Cyber Ops_A-401 walls with tile.pdf PDF
W91236-21-B-2013 Amendment 02_official.pdf PDF
Attachment 10_Section 23 09 00 DDC Controls Update.pdf PDF
Attachment 9_Chemical Termite Control.pdf PDF
W91236-21-B-2013 Amendment 01_official.pdf PDF
Cyber Operations Site visit list of attendees.pdf PDF
Attachment 6 (8) Spec 10 51 1301 (new spec) Amendment.pdf PDF
Attachment 8 (10) FFE .pdf PDF
Attachment 3 (4) Specs (vol2).pdf PDF
Attachment 2 (3) Specs (vol1).pdf PDF
Attachment 7 (9) Spec 23 81 47 Amendment.pdf PDF
Attachment 5 (7) 01 11 00 Amendment.pdf PDF
Attachment 1 (2) Drawings .pdf PDF
W91236-21-B-2013 Solicitation.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A I

N I

G

RI

VFOHTLAE

W

N O

M M

O C

P R

O F

E

SS I ONAL ENG

I N E

E R

BRANDON E. WOOD

Lic. No. 35155

08/15/2019

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

W -1

-D

-0

W S

P

B

E N

D

IX

R O

A D

S U

IT

E

V

IR

G

IN

IA

B

E A

C H

V

A

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

N O

R F

O L K

D

IS

T R

IC

T

N O

R F

O L K

V

A

DATE & TIME STAMP:

G

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

H E

L M

S A

V E

J B

L E

C Y

B E

R O

P S

F A

C

IL

IT

Y

RTA SUBMITTAL9/12/2019 10:27:24 AM

M-602

S C

H E

D U

L E

S

D e s ig n e r

A u th o r

C h e c k e r

/1

/2

M U

H J

C M

T

2. PROVIDE VERTICAL DIAPHRAGM TYPE EXPANSION TANK WITH FLOOR SKIRT, PRE-CHARGE TO 12 PSIG.

1. PROVIDE CENTRIFUGAL TYPE AIR SEPARATOR WITH HIGH CAPACITY AIR VENT.

NOTES:

CONDENSER WATER AS-1 228 5 4 ET-1 8.0 2.4 12" 20" SEE NOTES

SYSTEM TAG G.P.M. P.D. FT. SIZE TAG (GAL.) CAPACITY (GAL.) DIAMETER HEIGHT REMARKS

MAX. CAPACITY ACCEPTED APPROX. APPROX.

AIR SEPARATOR EXPANSION TANK

AIR CONTROL SCHEDULE

1. PROVIDE WITH INTEGRAL TAMPER RESISTANT THERMOSTAT, INTEGRAL ELECTRICAL DISCONNECT AND BLOWER.

NOTES:

EUH-1 400 3300 12 277 1 SEE NOTES

TAG CFM WATTS MBH VOLTS PHASE REMARKS

NOMINAL

ELECTRIC UNIT HEATER SCHEDULE

2. PROVIDE EF-1 WITH ELECTRONIC SPEED CONTROLLER. RF-1 SHALL BE CONTROLLED BY VFD.

1. PROVIDE INLINE FANS WITH CHATTERPROOF BDD, INTEGRAL ELECTRIC DISCONNECT, DUCT FLANGES, AND 4 POINT VIBRATION HANGER SYSTEM.

NOTES:

RF-1 127 - MECH INLINE 1715 1.50 DIRECT 1 208 3 SQ SEE NOTES

EF-1 127 - MECH INLINE 575 0.50 DIRECT 1/6 208 1 SQ SEE NOTES

TAG LOCATION FAN TYPE C.F.M. (IN. WG.) DRIVE H.P. VOLTS PHASE NO. REMARKS

E.S.P. ELECTRICAL DATA MODEL

FAN SCHEDULE

2. PROVIDE UNITS WITH HOSE KIT, 4-POINT SUSPENSION MOUNTING KIT WITH VIBRATION ISOLATION (HORIZONTAL DUCTED UNIT ONLY), AND MANUFACTURER'S PUMPING PACKAGE SIZED TO MATCH FLOW AND PRESSURE DROP REQUIREMENTS OF EACH HEAT PUMP (INCLUDING HOSE/VALVE KIT).

1. UNIT TYPE: HD = HORIZONTAL DUCTED, VC=VERTICAL CONSOLE.

NOTES:

WAHP-11 VC 390 - 0.3 3.0 9.3 9.2 74.2 61.8 13.6 13.5 85 94.1 12.6 69.7 9.5 55 48.7 0.08 7.0 15 277 1 11.0 SEE NOTES

WAHP-10B HD 2160 460 0.3 15.0 47.5 41.8 70.5 60.4 72.5 13.0 85 94.7 65.0 66.8 49.7 55 48.4 1 12.5 20 480 3 16.0 SEE NOTES

WAHP-10A HD 2160 460 0.3 15.0 47.5 41.8 70.5 60.4 72.5 13.0 85 94.7 65.0 66.8 49.7 55 48.4 1 12.5 20 480 3 16.0 SEE NOTES

WAHP-9 HD 430 110 0.3 3.0 10.3 8.1 69.7 60.1 14.2 13.2 85 94.5 13.3 66.2 10.2 55 48.2 0.13 7.0 15 277 1 5.0 SEE NOTES

WAHP-8 HD 460 150 0.3 3.8 10.6 8.0 68.4 59.6 17.1 12.9 85 94.1 16.4 65.2 12.5 55 48.4 0.13 8.7 15 277 1 6.0 SEE NOTES

WAHP-7 HD 1140 230 0.3 9.0 27.5 22.6 70.7 60.5 40.2 13.7 85 93.9 40.6 67.0 31.6 55 48.0 0.5 8.7 15 480 3 6.0 SEE NOTES

WAHP-6 HD 1020 170 0.3 9.0 24.1 20.8 71.4 60.7 39.5 13.7 85 93.8 40.4 67.5 30.9 55 48.1 0.5 8.7 15 480 3 6.0 SEE NOTES

WAHP-5 HD 745 135 0.3 6.0 18.8 15.1 71.1 60.6 28.0 13.6 85 94.3 27.0 67.3 20.5 55 48.2 0.33 13.5 20 277 1 12.0 SEE NOTES

WAHP-4 HD 390 - 0.3 3.0 9.3 9.2 74.2 61.8 14.2 13.2 85 94.5 13.3 66.2 10.2 55 48.2 0.13 7.0 15 277 1 5.0 SEE NOTES

WAHP-3 HD 590 135 0.3 4.5 15.5 11.4 70.2 60.3 21.4 13.0 85 94.5 19.9 66.6 15.3 55 48.2 0.33 11.2 15 277 1 8.0 SEE NOTES

WAHP-2 HD 280 30 0.3 2.3 6.6 6.0 72.5 61.1 10.8 12.4 85 94.6 10.0 68.4 7.7 55 48.2 0.08 4.0 15 277 1 5.0 SEE NOTES

WAHP-1 HD 740 70 0.3 6.0 18.5 16.2 72.7 61.2 28.2 13.6 85 94.4 27.0 68.5 20.3 55 48.2 0.33 5.5 15 480 3 12.0 SEE NOTES

TAG TYPE (NOTE 1) CFM CFM (IN. W.G.) GPM M.B.H. M.B.H. DB WB REJECTION EER (°F) (°F) M.B.H. DB ABSORPTION (°F) (°F) HP MCA MOCP VOLTS PHASE FT. HD. REMARKS

TOTAL AIR E.S.P. TOTAL SENS. EAT OF EWT LWT TOTAL EAT OF EWT LWT FAN EXCHANGER,

OUTSIDE HEAT HEAT DROP THROUGH

FAN DATA COOLING DATA HEATING DATA ELECTRICAL DATA MAX. PRESSURE

WATER SOURCE HEAT PUMP SCHEDULE - WATER TO AIR

3. PROVIDE 4-WAY PATTERN CEILING DIFFUSERS, U.O.N. ON PLANS OR SCHEDULE.

(INCLUDING HEAD OF SCREWS), MAXIMUM NC=25 AT HIGHEST CFM AND PROVIDE SQUARE TO ROUND TRANSITION AS REQUIRED.

2. PROVIDE ALUMINUM DIFFUSERS AND REGISTERS WITH OPPOSED BLADE VOLUME DAMPERS, BAKED STANDARD WHITE ENAMEL FINISH

1. MAXIMUM PRESSURE DROP SHALL INCLUDE VOLUME DAMPER WHERE DAMPER IS PROVIDED.

THE FOLLOWING NOTES ARE TYPICAL UNLESS OTHERWISE NOTED:

Z GRILLE RETURN/EXHAUST 605-1900 22x22 0.02 2'x2' LAY IN, 35° DEFLECTION, 3/4" SPACING

Y GRILLE RETURN/EXHAUST 125-600 12x12 0.02 2'x2' LAY IN, 35° DEFLECTION, 3/4" SPACING

W GRILLE RETURN/EXHAUST 50-120 6x6 0.02 2'x2' LAY IN, 35° DEFLECTION, 3/4" SPACING

V GRILLE RETURN/EXHAUST 380 12x12 0.02 SURFACE MOUNT, 35° DEFLECTION, 3/4" SPACING

U GRILLE RETURN 200 8x8 0.02 18 x 18 MODULE, SURFACE MOUNT, 35° DEFLECTION, 3/4" SPACING

T GRILLE RETURN/EXHAUST 380 12x12 0.02 SURFACE MOUNT, 35° DEFLECTION, 3/4" SPACING

H GRILLE SUPPLY 390 10x10 0.1 SURFACE MOUNT, DOUBLE DEFLECTION, 3/4" BLADE SPACING

G DIFFUSER SUPPLY 825 16"Ø 0.1 2'x2' LAY IN, SQUARE PERFORATED FACE, ADJUSTABLE DISCHARGE

F DIFFUSER SUPPLY 185 8"Ø 0.1 18 x 18 MODULE, SURFACE MOUNT, SQUARE LOUVERED FACE, ADJUSTABLE DISCHARGE

E DIFFUSER SUPPLY 530-725 14"Ø 0.1 2'x2' LAY IN, SQUARE LOUVERED FACE, ADJUSTABLE DISCHARGE

D DIFFUSER SUPPLY 385-525 12"Ø 0.1 2'x2' LAY IN, SQUARE LOUVERED FACE, ADJUSTABLE DISCHARGE

C DIFFUSER SUPPLY 230-380 10"Ø 0.1 2'x2' LAY IN, SQUARE LOUVERED FACE, ADJUSTABLE DISCHARGE

B DIFFUSER SUPPLY 125-225 8"Ø 0.1 2'x2' LAY IN, SQUARE LOUVERED FACE, ADJUSTABLE DISCHARGE

A DIFFUSER SUPPLY 50-120 6"Ø 0.1 2'x2' LAY IN, SQUARE LOUVERED FACE, ADJUSTABLE DISCHARGE

TAG TYPE SERVICE RANGE SIZE A.P.D. REMARKS

C.F.M. NECK MAX.

GRILLE, REGISTER & DIFFUSER SCHEDULE

3. FOR CHP-1/2, PROVIDE INVERTER DUTY RATED MOTOR.

2. PROVIDE NON OVERLOADING PUMP SELECTIONS.

1. PROVIDE NEMA PREMIUM EFFICIENCY MOTORS.

NOTES:

BP-1/2 HEATING HOT WATER INLINE 9 20 1/4 208 1 SEE NOTES

CHP-4 CONDENSER WATER INLINE 100 60 3 460 3 SEE NOTES

CHP-3 CONDENSER WATER INLINE 100 60 3 460 3 SEE NOTES

CHP-2 CONDENSER WATER BASE MOUNTED 228 60 7.5 480 3 SEE NOTES

CHP-1 CONDENSER WATER BASE MOUNTED 228 60 7.5 480 3 SEE NOTES

TAG SERVICE TYPE G.P.M. (FT.) H.P. VOLTS PHASE REMARKS

HEAD ELECTRICAL DATA

PUMP SCHEDULE

7. PROVIDE ALL STAINLESS STEEL CONSTRUCTION AND ELECTRONIC WATER LEVEL CONTROL. PROVIDE EXTERNAL SOLENOID VALVE WHICH SHALL BE INSULATED AND HEAT TRACED.

6. MAX INSTALLED HEIGHT = 12'-0".

5. PROVIDE ALUMINUM LADDER, VIBRATION SWITCH AND ALL STAINLES STEEL CONSTRUCTION.

4. PROVIDE CONTACTOR IN NEMA 4 ENCLOSURE FOR SUMP HEATER.

3. PROVIDE COMBINATION STARTER/DISCONNECT SWITCH IN NEMA 4 ENCLOSURE FOR SPRAY PUMP. PROVIDE OVERSIZED CONTROL TRANSFORMER TO SERVE POSITIVE CLOSURE DAMPER(S) MOTOR.

2. PROVIDE NEMA PREMIUM EFFICIENCY, INVERTER DUTY FAN MOTORS. PROVIDE VFD (WITH INTEGRAL BYPASS) IN NEMA 4 ENCLOSURE FOR FAN MOTOR.

1. PROVIDE WITH SUMP THERMOSTAT AND SUMP HEATER CONTACTOR.

NOTES:

CCC-1 FORCED DRAFT 228 10.0 78 95 85 37,600 30 460 3 345 2 460 3 1 6 460 3 SEE NOTES

(FT. WATER) (°F W.B.) (°F) (°F) C.F.M. H.P. VOLTS PHASE G.P.M. H.P. VOLTS PHASE NO. (EACH) VOLTS PHASE

TAG TYPE G.P.M. MAX. P.D. E.A.T. E.W.T. L.W.T. KW REMARKS

TOWER FAN SPRAY PUMP SUMP HEATER

LOW PROFILE CLOSED CIRCUIT COOLING TOWER SCHEDULE

3. PROVIDE ALL TRIM AND APPURTENANCES RECOMMENDED BY THE MANUFACTURER FOR INDICATED APPLICATION.

2. PROVIDE CONTROL PANEL WITH CONTACTS TO INTERFACE WITH BUILDING DDC CONTROL SYSTEM. PROVIDE BACNET INTERFACE.

1. PROVIDE PACKAGED, SKID MOUNTED, ELECTRIC HOT WATER BOILER COMPLETE WITH VERTICAL 16 GALLON STORAGE VESSEL.

NOTES:

B-1 108 3 369 9.2 5 135 55 131.0 480 3 SEE NOTES

TAG (KW) STAGES (M.B.H.) G.P.M. (FT H20) (ºF) (ºF) F.L.A. VOLTS PHASE REMARKS

INPUT OUTPUT W.P.D. L.W.T. E.W.T. ELECTRICAL DATA

ELECTRIC HOT WATER BOILER SCHEDULE

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

C

C C

-1 S

C H

E D

U L

E R

E V

IS

IO

N

/1

/2

Sheets
M-602 - SCHEDULES

File details come from the government source that posted it. Updated .