Attachment86_DLA_OPS_PH II_A-422 - EXTERIOR SIGNAGE PLAN ELEVATIONS SECTIONS AND DETAILS.pdf

PDF 462 KB Posted

Attached to
DLA Aviation Operations Center, Phase II, Defense Supply Center Richmond (DSCR) (Amendment 3 & 5) SEE RELATED NOTICE ID: W91235620R2005 FOR THE ORIGINAL SOLICITATION & OTHER SUBSEQUENT AMENDMENTS
Solicitation number
W9123620R2005
Issued by

About this file

This document provides plans, elevations, sections and details for exterior signage for a federal construction project. The project involves constructing a 281,075 square foot multi-story office building to accommodate 1,622 employees as an administrative operations center for the Defense Logistics Agency Aviation at the Defense Supply Center Richmond site in Richmond, Virginia. The exterior signage drawings show location plans, lettering details, and planting details for site signage. Construction is to utilize conventional methods and comply with Unified Facilities Criteria for minimum antiterrorism standards and sustainable building requirements. The pre-solicitation notice provides information for an upcoming Request for Proposal for construction of the DLA Aviation Operations Center Phase II project, with an estimated value between $25-100 million. The RFP will be issued on or about May 27, 2020 and awarded as a firm fixed-price contract through a best value evaluation of past performance, project approach, small business participation, and price factors.

View the file

Other files

File Type Posted
W91236-20-R-2005 Amendment 4 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 73_DLA_OPS_PH II_A-119 - FOURTH FLOOR PLAN - AREA A4.pdf PDF
Attachment 66 _DLA_OPS_PH II_A-106 - FIRST FLOOR PLAN - AREA A1.pdf PDF
Attachment85_DLA_OPS_PH II_A-421 - ENLARGED METROLOGY LAB AND MYLAR ROOM PLAN.pdf PDF
Attachment91_DLA_OPS_PH II_A-602 - DOOR SCHEDULE.pdf PDF
Attachment95_DLA_OPS_PH II_A-703 - FINISH SCHEDULE.pdf PDF
Attachment 74_DLA_OPS_PH II_A-120 - FOURTH FLOOR PLAN - AREA D4.pdf PDF
Attachment 122 Spec-Drawing List 07-08-20.xlsx XLSX spreadsheet
Attachment129_DLA_OPS_PH II_321216 SPECIFICATIONS VOL2-Asphalt.pdf PDF
Attachment116_DLA_OPS_PH II_S-603 - COLUMN SCHEDULE.pdf PDF
Attachment80_DLA_OPS_PH II_A-206 - ENLARGED ELEVATIONS.pdf PDF
Attachment 71_DLA_OPS_PH II_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Attachment 69_DLA_OPS_PH II_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Attachment 127_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Page1.pdf PDF
Attachment105_DLA_OPS_PH II_S-118 - SECOND FLOOR FRAMING PLAN - AREA F.pdf PDF
Attachment 62_DLA OPS_PH II_V-101.pdf PDF
Attachment108_DLA_OPS_PH II_S-132 - STAIRWELL FRAMING PLANS - AREA D.pdf PDF
Attachment122_OpsCtrPhaseII_final_GeotechRpt_Sept2019.pdf PDF
Attachment94_DLA_OPS_PH II_A-702 - FINISH SCHEDULE.pdf PDF
Attachment 65_DLA_OPS_PH II_A-103 - OVERALL THIRD FLOOR PLAN.pdf PDF
Attachment89_DLA_OPS_PH II_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Attachment 58_DLA OPS_CU101-CU102.pdf PDF
Attachment102_DLA_OPS_PH II_S-104 - DRILLED PIER AND PIER CAP PLAN - AREA G.pdf PDF
Attachment124_DLA_OPS_PH II_087100 SPECIFICATIONS VOL1-Door Hardware.pdf PDF
Attachment109_DLA_OPS_PH II_S-133 - STAIRWELL AND ELEVATOR ROOF FRAMING PLANS - AREA D.pdf PDF
Attachment77_DLA_OPS_PH II_A-145 - PARTIAL LOW LEVEL ROOF PLAN.pdf PDF
Attachment82_DLA_OPS_PH II_A-208 - ENLARGED ELEVATIONS.pdf PDF
Final W91236-20-R-2005 Amendment 3 DLA Ops Center.pdf PDF
Attachment93_DLA_OPS_PH II_A-701 - FINISH SCHEDULE.pdf PDF
Attachment 59_DLA OPS_PH II_C-512.pdf PDF
Attachment90_DLA_OPS_PH II_A-601 - DOOR SCHEDULE.pdf PDF
Attachment117_DLA_OPS_PH II_S-604 - COLUMN SCHEDULE.pdf PDF
Attachment125_DLA_OPS_PH II_089100 SPECIFICATIONS VOL1-OMIT Metal Wall Louvers.pdf PDF
Attachment 61_DLA OPS_PH II_CS101.pdf PDF
Attachment81_DLA_OPS_PH II_A-207 - ENLARGED ELEVATIONS.pdf PDF
Attachment 68_DLA_OPS_PH II_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Attachment 72_DLA_OPS_PH II_A-118 - THIRD FLOOR PLAN - AREA D3.pdf PDF
Attachment123_DLA_OPS_PH II_084400 SPECIFICATIONS VOL1-Para1.5.6.pdf PDF
Attachment75_DLA_OPS_PH II_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Attachment113_DLA_OPS_PH II_S-312 - FRAMING SECTIONS.pdf PDF
Attachment120_DLA_OPS_PH II_T-704 - VOICE AND DATA BACKBONE DIAGRAM.pdf PDF
Attachment115_DLA_OPS_PH II_S-503 - TYPICAL DETAILS.pdf PDF
Attachment107_DLA_OPS_PH II_S-131 - STAIRWELL FRAMING PLANS - AREA A AND AREA G.pdf PDF
Attachment92_DLA_OPS_PH II_A-603 - DOOR SCHEDULE AND DETAILS.pdf PDF
Attachment101_DLA_OPS_PH II_S-101 - DRILLED PIER AND PIER CAP PLAN - AREA A.pdf PDF
Attachment79_DLA_OPS_PH II_A-205 - ENLARGED ELEVATIONS.pdf PDF
Attachment128_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Part 2.3.2.pdf PDF
Attachment104_DLA_OPS_PH II_S-115 - ROOF FRAMING PLAN - AREA C.pdf PDF
Attachment 64_DLA OPS_PH II_V-103.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D5 A-422

2' -0

P

LA

N

T E

R

D8 A-422

A-428

A5

A-428

C1

4' -0

40'-0" 40'-0" 40'-0"

2' -0

P

LA

N

T E

R

PLANTER PLANTERSIGNAGE

2' -0

A-422

F1

5'-4"

1' -0

8"

2' -0

3'

-4

6"

1'-0" 2'-0" 1'-0"

AT

APPROX

GRADE

-2'-9"

1/

2" 1'

-0

3" 1'

-0

1/

2"

3" CLEAR TYP.

3" C

LE

A

R T

Y P

3" CLEAR TYP.

40'-0"40'-0"40'-0"

4' -0

2'

-0

AT APPROX

GRADE

-2'-9"

PLANTER SIGNAGE PLANTER

AT APPROX

GRADE

-2'-9"

104' -0

2'

-0

1'-0"2'-0"1'-0"

1' -0

8"

2' -0

AT

APPROX

GRADE

-2'-9"

5'-4"

1'-0"

2'-0" PLANTER WELL

1'-0"

P

LA

N T

W E

LL

1' -4

3" CLEAR TYP.

3" C

LE

A

R T

Y P

3" CLEAR TYP.

PROVIDE WEEPS ABOVE FLASHING

THROUGH CMU @ 24" O.C. FOR DRAINAGE

35'-0" 120'-0" 35'-0"

4' -0

7'

-6

PARKING

190'-0"

1"1"

6" 1/

2" 1/2" / 1'-0" 1/2" / 1'-0"

2'-0"

DAVID P. ISBELL A

I

N I

G

RI

V

FOHTLAE

W

N O

M M

O C

No.

ARCH TI ECT

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

1909 CYPRESS AVENUE

VIRGINIA BEACH, VA

23451

(757) 417 - 0140

C O

N T

R A

C T

N O

W

-1

-D

-0

10 JANUARY 2020

737297

A-422

E X

T E

R

IO

R S

IG

N

A G

E P

L A

N

E L E

V A

T

IO

N S

S

E C

T

IO

N S

A N

D D

E T

A

IL

S

D E

F E

N S

E

S

U P

P L Y

C E

N T

E R

R

IC

H M

O N

D

D S

C R

R

IC

H

M O

N D

V

IR

G

IN

IA

N O

R F

O L K

D

IS

T R

IC

T

F

R O

N T

S T

N

O R

F O

L K

V

A

W A

L L E

R T

O D

D

S A

D L E

R

A W

O O

L P

E R

T C

O M

P A

N Y

C

Y P

R E

S S

A V

E N

U E

V

IR

G

IN

IA

B

E A

C H

V

A

D e s ig n e r

A u th o r

C h e c k e r

J

A N

U A

R Y

D L A

O P

E R

A T

IO

N

S C

E N

T E

R

P H

-2

D E

F E

N S

E L

O G

IS

T

IC

S

A G

E N

C Y

A

V

IA

T

IO

N D

S C

R

1/4" = 1'-0"

EXTERIOR SIGNAGE PLAN

3/4" = 1'-0"A-422

D5 SIGNAGE SECTION

1/4" = 1'-0"A-422

C1 ELEVATION

1/4" = 1'-0"A-422

A5 ELEVATION

SHEET KEYNOTES

1 PRECAST CONCRETE COPING

2 3/8" X 8" L DOWEL PIN AT 16" OC MAX, SET ENDS IN EPOXY

3 DRIP EDGE

4 SALVAGED BRICK FROM PREVIOUSLY DEMOLISHED CONSTRUCTION

5 4" CMU

6 8" CMU, GROUT SOLID

7 12" BRUSHED ALUMINUM LETTERS

8 REINFORCED CONCRETE FOOTING, SEE STRUCTURAL DRAWINGS

9 LIGHT FIXTURES, TYPICAL OF 9, SEE ELECTRICAL DRAWINGS

10 SALVAGED BRICK ROWLOCK

11 CONCRETE WALK, SEE CIVIL DRAWINGS

12 TURF, SEE CIVIL DRAWINGS

13 SIGNAGE

14 MEMBRANE FLASHING

15 THRU WALL FLASHING WITH WEEPS AT 24" OC

16 VERTICAL WALL REINFORCING. #5 AT 32" OC

17 FOOTING BOTTOM REINFORCING: 6 - #5 CONTINUOUS (LONG WAYS) #5 AT

14" OC (SHORT WAYS)

3/4" = 1'-0"A-422

D8 SIGNAGE SECTION

1/32" = 1'-0"

OVERALL SIGNAGE PLAN

1 1/2" = 1'-0"A-422

F1 DETAIL

A

M E

N D

M E

N T

N O

-2 -2

A

M E

N D

M E

N T

N O

-0 -2

PLANTING BED:

(6) BLUE PACIFIC JUNIPERS, CENTERED IN BED.

(20) LIRIOPE AT 24" O.C. ON EACH SIDE.

PLANTING BED:

(6) BLUE PACIFIC JUNIPERS, CENTERED IN BED.

(20) LIRIOPE AT 24" O.C. ON EACH SIDE.

3 3

Sheets
A-422 - EXTERIOR SIGNAGE PLAN, ELEVATIONS, SECTIONS AND DETAILS

File details come from the government source that posted it. Updated .