About this file

This document provides details for a federal construction contract opportunity for the Defense Logistics Agency Aviation Operations Center, Phase II project. The U.S. Army Corps of Engineers-Norfolk District will issue a Request for Proposal for construction of a multi-story, 281,075 square foot office building to accommodate 1,622 employees in Richmond, Virginia. The facility is for administrative operations and includes office space, conference rooms, and support areas. The contract value is estimated between $25-100 million. The contract completion date is 1020 calendar days after notice to proceed. The solicitation will be posted to beta.sam.gov on or about May 27, 2020 and utilize full and open competition. Evaluation criteria include past performance, project approach, small business participation plan, and price. Registration in SAM is required to respond. Inquiries should be directed to the point of contact provided.

View the file

Other files

File Type Posted
W91236-20-R-2005 Amendment 4 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 73_DLA_OPS_PH II_A-119 - FOURTH FLOOR PLAN - AREA A4.pdf PDF
Attachment 66 _DLA_OPS_PH II_A-106 - FIRST FLOOR PLAN - AREA A1.pdf PDF
Attachment85_DLA_OPS_PH II_A-421 - ENLARGED METROLOGY LAB AND MYLAR ROOM PLAN.pdf PDF
Attachment91_DLA_OPS_PH II_A-602 - DOOR SCHEDULE.pdf PDF
Attachment95_DLA_OPS_PH II_A-703 - FINISH SCHEDULE.pdf PDF
Attachment 74_DLA_OPS_PH II_A-120 - FOURTH FLOOR PLAN - AREA D4.pdf PDF
Attachment 122 Spec-Drawing List 07-08-20.xlsx XLSX spreadsheet
Attachment129_DLA_OPS_PH II_321216 SPECIFICATIONS VOL2-Asphalt.pdf PDF
Attachment116_DLA_OPS_PH II_S-603 - COLUMN SCHEDULE.pdf PDF
Attachment80_DLA_OPS_PH II_A-206 - ENLARGED ELEVATIONS.pdf PDF
Attachment 71_DLA_OPS_PH II_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Attachment 69_DLA_OPS_PH II_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Attachment 127_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Page1.pdf PDF
Attachment105_DLA_OPS_PH II_S-118 - SECOND FLOOR FRAMING PLAN - AREA F.pdf PDF
Attachment 62_DLA OPS_PH II_V-101.pdf PDF
Attachment108_DLA_OPS_PH II_S-132 - STAIRWELL FRAMING PLANS - AREA D.pdf PDF
Attachment122_OpsCtrPhaseII_final_GeotechRpt_Sept2019.pdf PDF
Attachment94_DLA_OPS_PH II_A-702 - FINISH SCHEDULE.pdf PDF
Attachment 65_DLA_OPS_PH II_A-103 - OVERALL THIRD FLOOR PLAN.pdf PDF
Attachment89_DLA_OPS_PH II_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Attachment 58_DLA OPS_CU101-CU102.pdf PDF
Attachment102_DLA_OPS_PH II_S-104 - DRILLED PIER AND PIER CAP PLAN - AREA G.pdf PDF
Attachment124_DLA_OPS_PH II_087100 SPECIFICATIONS VOL1-Door Hardware.pdf PDF
Attachment109_DLA_OPS_PH II_S-133 - STAIRWELL AND ELEVATOR ROOF FRAMING PLANS - AREA D.pdf PDF
Attachment77_DLA_OPS_PH II_A-145 - PARTIAL LOW LEVEL ROOF PLAN.pdf PDF
Attachment82_DLA_OPS_PH II_A-208 - ENLARGED ELEVATIONS.pdf PDF
Final W91236-20-R-2005 Amendment 3 DLA Ops Center.pdf PDF
Attachment93_DLA_OPS_PH II_A-701 - FINISH SCHEDULE.pdf PDF
Attachment 59_DLA OPS_PH II_C-512.pdf PDF
Attachment90_DLA_OPS_PH II_A-601 - DOOR SCHEDULE.pdf PDF
Attachment117_DLA_OPS_PH II_S-604 - COLUMN SCHEDULE.pdf PDF
Attachment125_DLA_OPS_PH II_089100 SPECIFICATIONS VOL1-OMIT Metal Wall Louvers.pdf PDF
Attachment 61_DLA OPS_PH II_CS101.pdf PDF
Attachment81_DLA_OPS_PH II_A-207 - ENLARGED ELEVATIONS.pdf PDF
Attachment 68_DLA_OPS_PH II_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Attachment 72_DLA_OPS_PH II_A-118 - THIRD FLOOR PLAN - AREA D3.pdf PDF
Attachment75_DLA_OPS_PH II_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Attachment113_DLA_OPS_PH II_S-312 - FRAMING SECTIONS.pdf PDF
Attachment120_DLA_OPS_PH II_T-704 - VOICE AND DATA BACKBONE DIAGRAM.pdf PDF
Attachment115_DLA_OPS_PH II_S-503 - TYPICAL DETAILS.pdf PDF
Attachment107_DLA_OPS_PH II_S-131 - STAIRWELL FRAMING PLANS - AREA A AND AREA G.pdf PDF
Attachment92_DLA_OPS_PH II_A-603 - DOOR SCHEDULE AND DETAILS.pdf PDF
Attachment101_DLA_OPS_PH II_S-101 - DRILLED PIER AND PIER CAP PLAN - AREA A.pdf PDF
Attachment79_DLA_OPS_PH II_A-205 - ENLARGED ELEVATIONS.pdf PDF
Attachment128_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Part 2.3.2.pdf PDF
Attachment104_DLA_OPS_PH II_S-115 - ROOF FRAMING PLAN - AREA C.pdf PDF
Attachment 64_DLA OPS_PH II_V-103.pdf PDF
Attachment112_DLA_OPS_PH II_S-304 - FOUNDATION SECTIONS.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DLA OPS CENTER PHASE 2 W91236-17-D-002

DEFENSE SUPPLY CENTER RICHMOND (DSCR), RICHMOND, VA

other detrimental effects. For design purposes, base provisions for thermal movement on assumed ambient temperature range of from 0 degrees F to 180 degrees F.

1.5.4 Building Movement

Design curtain wall and its connections to allow building movement including live load, creep, column shortening, and thermal movement of the wall system.

1.5.5 Tolerances

Design and erect wall system to accommodate tolerances in building frame and other contiguous work as indicated or specified. Provide with the following tolerances:

a. Maximum variation from plane or location shown on approved shop drawings: 1/8 inch per 12 feet of length up to not more than 1/2 inch in any total length.

b. Maximum offset from true alignment between two identical members abutting end to end in line: 1/16 inch.

1.5.6 Structural Requirements

No member shall deflect in a direction parallel to the plane of the wall, when carrying its full design load, more than an amount which will reduce the edge cover or glass bite below 75 percent of the design dimension. No member after deflection under full design load, shall have a clearance between itself and the top of the panel, glass, sash, or other part immediately below it less than 1/8 inch; the clearance between the member and an operable window or door shall be minimum 1/16 inch. Design entire system to withstand the indicated wind and concentrated loads, and the following wind loads acting normal to the plane of the wall per ASCE 7.

Wind loads are at LRFD level.

a. On the first three stories above grade 40.1 psf acting inward, and the same load acting outward.

b. On the next two stories above grade 40.9 psf acting inward, and the same load acting outward.

c. On corner areas, extending 11 feet from the building corners on the first three stories, on all facades, the outward-acting (negative) design load shall be increased to 49.1 pounds per square foot.

d. On corner areas, extending 11 feet from the building corners on the top two stories, on all facades, the outward-acting (negative) design load shall be increased to 75.0 pounds per square foot.

1.5.7 Minimum Antiterrorism Performance

Design all systems to resist a 3-second duration equivalent ASD design load of 52 psf.

1.6 QUALIFICATION OF WELDERS

Welding shall be performed by certified welders qualified in accordance with AWS D1.1/D1.1M using procedures, materials, and equipment of the type

SECTION 08 44 00 Page 9 richter Highlight

1.5.6 Structural Requirements

File details come from the government source that posted it. Updated .