About this file

This pre-solicitation notice provides information about an upcoming Request for Proposal for construction services related to the DLA Aviation Operations Center, Phase II project at Defense Supply Center Richmond in Richmond, Virginia. The U.S. Army Corps of Engineers-Norfolk District intends to issue an RFP to construct a 281,075 square foot, multi-story office building to accommodate 1,622 employees in an administrative operations center. The facility will include open and private offices, support spaces, conference rooms, kitchens, restrooms, elevators, fire suppression, alarms, security systems, and energy management controls. The contract will utilize conventional design and construction methods and adhere to DoD, DLA, and Defense Supply Center standards. The contract completion date will be 1020 calendar days after notice to proceed, and the magnitude of construction costs is estimated between $25-100 million. The RFP is expected to be issued on May 27, 2020 on beta.sam.gov and will utilize full and open competition, with evaluation considering past performance, project approach, small business participation, and price.

View the file

Other files

File Type Posted
W91236-20-R-2005 Amendment 4 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 73_DLA_OPS_PH II_A-119 - FOURTH FLOOR PLAN - AREA A4.pdf PDF
Attachment 66 _DLA_OPS_PH II_A-106 - FIRST FLOOR PLAN - AREA A1.pdf PDF
Attachment85_DLA_OPS_PH II_A-421 - ENLARGED METROLOGY LAB AND MYLAR ROOM PLAN.pdf PDF
Attachment91_DLA_OPS_PH II_A-602 - DOOR SCHEDULE.pdf PDF
Attachment95_DLA_OPS_PH II_A-703 - FINISH SCHEDULE.pdf PDF
Attachment 74_DLA_OPS_PH II_A-120 - FOURTH FLOOR PLAN - AREA D4.pdf PDF
Attachment 122 Spec-Drawing List 07-08-20.xlsx XLSX spreadsheet
Attachment129_DLA_OPS_PH II_321216 SPECIFICATIONS VOL2-Asphalt.pdf PDF
Attachment116_DLA_OPS_PH II_S-603 - COLUMN SCHEDULE.pdf PDF
Attachment80_DLA_OPS_PH II_A-206 - ENLARGED ELEVATIONS.pdf PDF
Attachment 71_DLA_OPS_PH II_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Attachment 69_DLA_OPS_PH II_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Attachment 127_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Page1.pdf PDF
Attachment 62_DLA OPS_PH II_V-101.pdf PDF
Attachment108_DLA_OPS_PH II_S-132 - STAIRWELL FRAMING PLANS - AREA D.pdf PDF
Attachment122_OpsCtrPhaseII_final_GeotechRpt_Sept2019.pdf PDF
Attachment94_DLA_OPS_PH II_A-702 - FINISH SCHEDULE.pdf PDF
Attachment 65_DLA_OPS_PH II_A-103 - OVERALL THIRD FLOOR PLAN.pdf PDF
Attachment89_DLA_OPS_PH II_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Attachment 58_DLA OPS_CU101-CU102.pdf PDF
Attachment102_DLA_OPS_PH II_S-104 - DRILLED PIER AND PIER CAP PLAN - AREA G.pdf PDF
Attachment124_DLA_OPS_PH II_087100 SPECIFICATIONS VOL1-Door Hardware.pdf PDF
Attachment109_DLA_OPS_PH II_S-133 - STAIRWELL AND ELEVATOR ROOF FRAMING PLANS - AREA D.pdf PDF
Attachment77_DLA_OPS_PH II_A-145 - PARTIAL LOW LEVEL ROOF PLAN.pdf PDF
Attachment82_DLA_OPS_PH II_A-208 - ENLARGED ELEVATIONS.pdf PDF
Final W91236-20-R-2005 Amendment 3 DLA Ops Center.pdf PDF
Attachment93_DLA_OPS_PH II_A-701 - FINISH SCHEDULE.pdf PDF
Attachment 59_DLA OPS_PH II_C-512.pdf PDF
Attachment90_DLA_OPS_PH II_A-601 - DOOR SCHEDULE.pdf PDF
Attachment117_DLA_OPS_PH II_S-604 - COLUMN SCHEDULE.pdf PDF
Attachment125_DLA_OPS_PH II_089100 SPECIFICATIONS VOL1-OMIT Metal Wall Louvers.pdf PDF
Attachment 61_DLA OPS_PH II_CS101.pdf PDF
Attachment81_DLA_OPS_PH II_A-207 - ENLARGED ELEVATIONS.pdf PDF
Attachment 68_DLA_OPS_PH II_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Attachment 72_DLA_OPS_PH II_A-118 - THIRD FLOOR PLAN - AREA D3.pdf PDF
Attachment123_DLA_OPS_PH II_084400 SPECIFICATIONS VOL1-Para1.5.6.pdf PDF
Attachment75_DLA_OPS_PH II_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Attachment113_DLA_OPS_PH II_S-312 - FRAMING SECTIONS.pdf PDF
Attachment120_DLA_OPS_PH II_T-704 - VOICE AND DATA BACKBONE DIAGRAM.pdf PDF
Attachment115_DLA_OPS_PH II_S-503 - TYPICAL DETAILS.pdf PDF
Attachment107_DLA_OPS_PH II_S-131 - STAIRWELL FRAMING PLANS - AREA A AND AREA G.pdf PDF
Attachment92_DLA_OPS_PH II_A-603 - DOOR SCHEDULE AND DETAILS.pdf PDF
Attachment101_DLA_OPS_PH II_S-101 - DRILLED PIER AND PIER CAP PLAN - AREA A.pdf PDF
Attachment79_DLA_OPS_PH II_A-205 - ENLARGED ELEVATIONS.pdf PDF
Attachment128_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Part 2.3.2.pdf PDF
Attachment104_DLA_OPS_PH II_S-115 - ROOF FRAMING PLAN - AREA C.pdf PDF
Attachment 64_DLA OPS_PH II_V-103.pdf PDF
Attachment112_DLA_OPS_PH II_S-304 - FOUNDATION SECTIONS.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X10X8X6 X7 X12 X15

XC

XE

XB

XG

X9 X11

XA

X14

W18X35 (16)

W X

(8

W X

(8

W16X26 (14)

W X

(3

W27X84 (24)W27X84 (30)W27X84 (34) W30X90 (24)

2' - 3" 34' - 11" 18' - 0"

1' - 4"

15' - 8" 15' - 8"

1' - 4"

18' - 0" 22' - 3"

2' - 4"

10' - 9"

W X

(2

W27X84 (36)

W X

(2

W16X31 (22) W16X31 (22)

W X

(2

W X

(1

W30X90 (24)

W X

(2

W X

(2

W X

(2

W X

(1

W27X84 (36) W27X84 (38) W27X84 (38) W27X84 (36)

W X

(2

W X

(2

W X

(2

W X

(2

W X

(1

W X

(1

W X

(1

W X

(1

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

W X

(1

W X

(1

W X

(1

W X

(1

W X

(2

W X

(2

/1

XF

XD

W21X50 (22)

W24X55 (24)

W X

(1

W X

(1

W X

(6

W X

(1

W X

(1

W X

(6

W X

(6

W X

(6

W X

(6

W X

(6

W X

(8

W X

(8

W X

(8

W X

(8

W X

(1

W X

(1

W X

(1

W X

(1

XA.1

D1

S-312

C4

S-320

M

A T

C H

L

IN

E R

E F

E R

T O

A

S -1

M

A T

C H

L

IN

E R

E F

E R

T O

A

S -1

55' - 3"

3' - 4 1/2"

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

XB.5A

X8.8 X11.2 X14.2

XA.8

W X

W X

(6

W21X44 (18)

W24X68 (18)

W21X44 (18)

W27X84 (20)

W X

(1

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

W X

(4

W X

(8

W X

(1

W X

(1

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

W X

(2

. 3

(6

W21X50 (24)

143' - 9 5/8"

XA.7

W X

(1

W X

(1

W X

W X

(6

(6

H S

S X

X

/4

/MATCHLINE REFER TO A1 S-119

S-136

E1

W X

A1

S-317

A5

S-317

W21X50 (24)

/2

/8

/8

/1

R A

D

IU

S

TYP

C4

S-321

XB.5B

S-137

A1

S-137

D1

S-138

A1

S-138

D1

W X

(2

10 C4

S-321

E8

S-313

A7

S-311

A7

S-311

E6

S-313

D1

S-312

BP4

BP4

REFER TO ARCHITECTURAL DRAWINGS

FOR REFLECTED CEILING PLANS AND

EXTENT OF OPEN CEILING. STEEL

EXPOSED TO VIEW IN ROOMS 1100A

SHALL BE AESS.

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

1909 CYPRESS AVENUE

VIRGINIA BEACH, VA

23451

(757) 417 - 0140

C O

N T

R A

C T

N O

W

-1

-D

-0

01/10/2020

737123

S-118

S E

C O

N D

F L O

O R

F R

A M

IN

G

P L A

N

A R

E A

F

D E

F E

N S

E

S

U P

P L Y

C E

N T

E R

R

IC

H M

O N

D

D S

C R

R

IC

H

M O

N D

V

IR

G

IN

IA

N O

R F

O L K

D

IS

T R

IC

T

F

R O

N T

S T

N

O R

F O

L K

V

A

W A

L L E

R T

O D

D

S A

D L E

R

A W

O O

L P

E R

T C

O M

P A

N Y

C

Y P

R E

S S

A V

E N

U E

V

IR

G

IN

IA

B

E A

C H

V

A

K B

F

J S

S

D S

R

M L M

J A

N U

A R

Y

D L A

O P

E R

A T

IO

N

S C

E N

T E

R

P H

-2

D E

F E

N S

E L

O G

IS

T

IC

S

A G

E N

C Y

A

V

IA

T

IO

N D

S C

R

KEY PLAN

NOT TO SCALE

A

B

C

D

E F

G

24'16'8'4'0 1/8"=1'-0"

GRAPHIC SCALE

PLAN NORTH

SCALE: 1/8" = 1'-0"A1

SECOND FLOOR FRAMING PLAN - AREA F

SHEET KEYNOTES

NUMBER NOTE

1 FACE OF BRICK

2 ELEVATOR SHAFT SLAB OPENING

3 2 1/2" BUILDING EXPANSION JOINT

4 FIRE PORTAL, REFER TO TYPICAL FIRE PORTAL

DETAILS ON SHEET S-508

5 EXISTING BUILDING 32 ROOF FRAMING

6 EXISTING BUILDING 32 COLUMN

7 EXISTING BUILDING 32 EXTERIOR MASONRY WALL.

FOR REQUIRED MODIFICATIONS TO EXPOSED

EXISTING STEEL ALONG EXISTING WALL REFER TO

ELEVATION D1/S-201 AND RELEVANT SECTIONS.

8 2" BUILDING EXPANSION JOINT

9 FOR STEEL BEAM TO MASONRY WALL CONNECTION

REFER TO TYPICAL DETAIL E8/S-505.

10 BID OPTION 1, AREA F CANOPY ALONG CURVED

EXTERIOR WALL ON EITHER SIDE OF ENTRANCE

CANOPY: CONSTRUCTED OF 1 1/2" GALVANIZED 20

GAGE METAL ROOF DECK ON CANTILEVERED HSS8X6

BEAMS. HSS8X6 BEAMS SHALL BE SPACED AT 5'-0"

MAX AND ARRAYED ALONG CURVE OF EXTERIOR

WALL. AT WINDOWS, HSS8X6 CANOPY BEAMS SHALL

ALIGN WITH HANGING HSS8X8 TUBES AND BRACES

(TUBES AND BRACES AT WINDOWS ARE PART OF BASE

BID). AT WALLS (NOT WINDOWS), HSS8X6 CANOPY

BEAMS SHALL BE FASTENED TO HSS8X8 COLUMNS

LOCATED WITHIN STUD CAVITY. REFER TO SHEETS

S-137 AND S-138 FOR CANOPY FRAMING PLANS.

PLAN NOTES:

1. FOR PLAN NOTES REFER TO SHEET S-004.

A

M E

N D

M E

N T

N O

J U

L Y

File details come from the government source that posted it. Updated .