DLA Ops Center CLIN Schedule Rev1.pdf
PDF 556 KB Posted
- Solicitation number
- W9123620R2005
About this file
This document is an attachment to a federal solicitation providing pricing details for the construction of a Defense Logistics Agency Aviation Operations Center in Richmond, Virginia. The solicitation seeks a firm-fixed-price contract to construct a 281,075 square foot, multi-story office building to accommodate 1,622 employees. Pricing is provided through unit cost and lump sum contract line item numbers (CLINs) for the building construction, site work, demolition, geothermal wells in soil and rock, special foundations, parking lot paving, and optional items like additional canopies and generator relocation. The total evaluated price will be the sum of CLINs 0001 through 0014. The base bid and optional MILCON funded CLINs 0001 through 0009 are subject to a statutory cost limitation of $89,013,000. The completion date for the base scope of work is 1,020 calendar days after notice to proceed.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 7
PART I - THE PRICE SCHEDULE - DLA OPS CENTER (PH-2)
REVISION 1 Dated 15 July 2020
SECTION 00010 - SUPPLIES OR SERVICES AND PRICES
SCHEDULE I - BASE BID
CLIN # DESCRIPTION QUANTITY
UNIT
MEASURE
UNIT
PRICE AMOUNT
BASE
BID
CLIN DEMO BLDG 33 - All costs in connection with 1 JOB $0 0001 demolition of warehouse Building 33, including removal and disposal of Hazardous Materials, all related site demolition, site improvements and site utilities complete as shown on the drawings and specified excluding the work described in CLIN 0002- 0014. Source of funds is MILCON.
CLIN CONSTRUCT OPS CTR PH2 - All costs in 1 JOB $0 0002 connection with construction of new DLA Ops Center, building construction only, excluding all "special costs" as identified in CLIN 0006, complete as shown on the drawings and specified excluding the work described in CLIN 0001 & 0003-0014. Source of funds is MILCON.
CLIN SITE WORK - All costs in connection with 1 JOB $0 0003 construction of new DLA Ops Center Site Work, including all related site preparation, site improvements and site utilities complete as shown on the drawings and specified excluding the work described in CLIN 0001-0002 & 0004-0014. Source of funds is MILCON.
WELLS IN SOIL - UNIT COST for installation of
16,280
LF
$/LF
$0
CLIN
geothermal wells through SOIL (installation is as described in SPEC SECTION 23 81 47); include drilling, steel encasement, grouting and associated vertical piping. The cost of the rest of the items in SPEC SECTION 23 21 47 (including permits, heat pumps, system equipment, piping pumps, electrical equipment, controls, ground heat exchanger) shall be included in CLIN 0003. Assume total bid quantity for well installation through SOIL is 16,280 LF; in accordance with FAR 52.211-18, the UNIT PRICE in this CLIN 0004 is intended to provide for field adjustment in the case where the actual field amount drilled through SOIL varies. Complete work as shown on the drawings and specified excluding the work described in CLIN 001-0003 & 0005-0014. Source of funds is MILCON.
UNIT UNIT
CLIN # DESCRIPTION QUANTITY MEASURE PRICE AMOUNT
WELLS IN ROCK - UNIT COST for installation of geothermal wells through ROCK (installation is as described in SPEC SECTION 23 81 47); include drilling, grouting and associated vertical piping. The cost of the rest of the items in SPEC SECTION 23 81 47 (including permits, heat pumps, system equipment, piping pumps, electrical equipment, controls, ground heat exchanger) shall be included in CLIN 0003. Assume total bid quantity for well installation through ROCK is 93,720 LF; in accordance with FAR 52.211-18, the UNIT PRICE in this CLIN 0005 is intended to provide for field adjustment in the case where the actual field amount drilled through ROCK varies. Complete work as shown on the drawings and specified excluding the work described in CLIN 0001-0004 & 0006-0014.
Source of funds is MILCON.
SPECIAL FOUNDATIONS (PILES AND PILE CAPS) -
Unit Cost for installation of new DLA Ops Center special foundations (piles and pile caps), complete as shown on the drawings and specified excluding the work described in CLIN 0001-0005 & 0007-0014.
Source of funds is MILCON.
93,720 LF $/LF $0
5,740 LF $/LF $0
TOTAL BASE BID $0
SCHEDULE II - OPTIONAL BID ITEMS MILCON FUNDED COSTS
PARKING LOT PAVEMENT - All costs in connection with provision of asphalt to final grade in lieu of gravel
1 JOB $0
OPTION in employee parking lot (COST DIFFERENCE - Cost to provide gravel parking should remain in CLIN 0003 Site Work), as indicated on CP103 and CP104 and specified excluding the work described in CLIN 0001- 0006 & 0008 -0014. Source of funds is MILCON.
Option to be exercise within 180 days of Contract Notice To Proceed in accordance with FAR 52.217-7.
CLIN ADDITIONAL CANOPY - All costs in connection with 1 JOB $0
OPTION
construction of a canopy that stretches from the entrance vestibule of the two-story portion of the building to the east and west, stopping at the five-story portion and at the finished face of Building 32 complete as shown on drawings and specified excluding the work described in CLIN 0001-0007 & 0009-0014. Source of funds is MILCON. Option to be exercised within 180 days of Contract Notice To Proceed in accordance with FAR 52.217-7.
UNIT UNIT
CLIN # DESCRIPTION QUANTITY MEASURE PRICE AMOUNT
OPTION
GENERATOR RELOCATION - All costs in connection with relocation of existing emergency generators, site demolition, site repair, and site preparation complete as shown on drawings and specified excluding the work described in CLIN 0001-0008 & 0010-0014. Source of funds is MILCON. Option to be exercised within 180 days of Contract Notice To Proceed in accordance with FAR 52. 217-7.
1 JOB $0
TOTAL SCHEDULE II - OPTIONAL BID ITEMS MILCON FUNDED COSTS $0
Sum of Statutory Lines $0
SCHEDULE III - OPTIONAL BID ITEMS NON-MILCON FUNDED COSTS
OPTION
FF&E - All costs in connection with providing Furniture, Fixtures & Equipment (FF&E) complete as shown on the drawings and specified excluding the work described in CLIN 0001-0009 & 0011-0014.
Sources of funds is Non-MILCON. Option to be exercised within 365 days of Contract Notice To
OPTION
NEW GENERATOR - All costs to procure and install all 150 KW Standby Diesel Generator per specifications SECTION 26 32 15.00 10 for the DLA Operations Center – PH-2, complete, including all work incidental therto as shown on the drawings and as specified exclusive of CLIN 0001-0010 & 0012- 0014. Source of funds is Non-MILCON. Option to be exercised within 365 days of Contract Notice To
OPTION
PROCURE & INSTALL TVs - All costs to Procure and install all Audio-Visual Equipment (Televisions) for the DLA Operations Center – PH-2, complete, including all work incidental thereto as shown on the drawings and specified exclusive of CLIN 0001-0011. Sources of funds is Non-MILCON. Option to be exercised within 365 days of Contract Notice To Proceed in accordance with FAR 52.217.7.
TOTAL SCHEDULE III - OPTIONAL BID ITEMS NON-MILCON FUNDED COSTS $0
TOTAL SCHEDULE I, II, & III- BASE BID, OPTIONAL NON-MILCON AND OPTIONAL ITEMS $0
STATUTORY COST LIMITATION IN THIS SOLICITATION:
Per FAR 36.205 CLINS 0001 ‐ 0009 are subject to STATUTORY COST LIMITATION OF $89,013,000.
1 JOB $0
JOB
1 JOB
1. For purposes of source selection as referenced in Section 00 22 16 of the Solicitation, and in particular Subsection 6.1, "Price" shall mean the Total Evaluated Price which will be the sum of the pricing submitted for CLINs 0001 through 0014, inclusive. Failure to provide a price for each CLIN may be deemed a deficiency because it may prevent the Government from conducting a meaningful evaluation of price, which could result in the proposal being ineligible for award.
2. Contract Completion Date: Unless indicated otherwise, the completion date for the scope of the
CLIN is 1,020 days after notice to proceed.
| Draft CLIN Revision 07162020 ko changes |
| last page |