About this file

This document is an attachment to a federal solicitation providing pricing details for the construction of a Defense Logistics Agency Aviation Operations Center in Richmond, Virginia. The solicitation seeks a firm-fixed-price contract to construct a 281,075 square foot, multi-story office building to accommodate 1,622 employees. Pricing is provided through unit cost and lump sum contract line item numbers (CLINs) for the building construction, site work, demolition, geothermal wells in soil and rock, special foundations, parking lot paving, and optional items like additional canopies and generator relocation. The total evaluated price will be the sum of CLINs 0001 through 0014. The base bid and optional MILCON funded CLINs 0001 through 0009 are subject to a statutory cost limitation of $89,013,000. The completion date for the base scope of work is 1,020 calendar days after notice to proceed.

View the file

Other files

File Type Posted
W91236-20-R-2005 Amendment 4 DLA Ops Center.pdf PDF
Attachment 73_DLA_OPS_PH II_A-119 - FOURTH FLOOR PLAN - AREA A4.pdf PDF
Attachment 66 _DLA_OPS_PH II_A-106 - FIRST FLOOR PLAN - AREA A1.pdf PDF
Attachment85_DLA_OPS_PH II_A-421 - ENLARGED METROLOGY LAB AND MYLAR ROOM PLAN.pdf PDF
Attachment91_DLA_OPS_PH II_A-602 - DOOR SCHEDULE.pdf PDF
Attachment95_DLA_OPS_PH II_A-703 - FINISH SCHEDULE.pdf PDF
Attachment 74_DLA_OPS_PH II_A-120 - FOURTH FLOOR PLAN - AREA D4.pdf PDF
Attachment 122 Spec-Drawing List 07-08-20.xlsx XLSX spreadsheet
Attachment129_DLA_OPS_PH II_321216 SPECIFICATIONS VOL2-Asphalt.pdf PDF
Attachment116_DLA_OPS_PH II_S-603 - COLUMN SCHEDULE.pdf PDF
Attachment80_DLA_OPS_PH II_A-206 - ENLARGED ELEVATIONS.pdf PDF
Attachment 71_DLA_OPS_PH II_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Attachment 69_DLA_OPS_PH II_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Attachment 127_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Page1.pdf PDF
Attachment105_DLA_OPS_PH II_S-118 - SECOND FLOOR FRAMING PLAN - AREA F.pdf PDF
Attachment 62_DLA OPS_PH II_V-101.pdf PDF
Attachment108_DLA_OPS_PH II_S-132 - STAIRWELL FRAMING PLANS - AREA D.pdf PDF
Attachment122_OpsCtrPhaseII_final_GeotechRpt_Sept2019.pdf PDF
Attachment94_DLA_OPS_PH II_A-702 - FINISH SCHEDULE.pdf PDF
Attachment 65_DLA_OPS_PH II_A-103 - OVERALL THIRD FLOOR PLAN.pdf PDF
Attachment89_DLA_OPS_PH II_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Attachment 58_DLA OPS_CU101-CU102.pdf PDF
Attachment102_DLA_OPS_PH II_S-104 - DRILLED PIER AND PIER CAP PLAN - AREA G.pdf PDF
Attachment124_DLA_OPS_PH II_087100 SPECIFICATIONS VOL1-Door Hardware.pdf PDF
Attachment109_DLA_OPS_PH II_S-133 - STAIRWELL AND ELEVATOR ROOF FRAMING PLANS - AREA D.pdf PDF
Attachment77_DLA_OPS_PH II_A-145 - PARTIAL LOW LEVEL ROOF PLAN.pdf PDF
Attachment82_DLA_OPS_PH II_A-208 - ENLARGED ELEVATIONS.pdf PDF
Final W91236-20-R-2005 Amendment 3 DLA Ops Center.pdf PDF
Attachment93_DLA_OPS_PH II_A-701 - FINISH SCHEDULE.pdf PDF
Attachment 59_DLA OPS_PH II_C-512.pdf PDF
Attachment90_DLA_OPS_PH II_A-601 - DOOR SCHEDULE.pdf PDF
Attachment117_DLA_OPS_PH II_S-604 - COLUMN SCHEDULE.pdf PDF
Attachment125_DLA_OPS_PH II_089100 SPECIFICATIONS VOL1-OMIT Metal Wall Louvers.pdf PDF
Attachment 61_DLA OPS_PH II_CS101.pdf PDF
Attachment81_DLA_OPS_PH II_A-207 - ENLARGED ELEVATIONS.pdf PDF
Attachment 68_DLA_OPS_PH II_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Attachment 72_DLA_OPS_PH II_A-118 - THIRD FLOOR PLAN - AREA D3.pdf PDF
Attachment123_DLA_OPS_PH II_084400 SPECIFICATIONS VOL1-Para1.5.6.pdf PDF
Attachment75_DLA_OPS_PH II_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Attachment113_DLA_OPS_PH II_S-312 - FRAMING SECTIONS.pdf PDF
Attachment120_DLA_OPS_PH II_T-704 - VOICE AND DATA BACKBONE DIAGRAM.pdf PDF
Attachment115_DLA_OPS_PH II_S-503 - TYPICAL DETAILS.pdf PDF
Attachment107_DLA_OPS_PH II_S-131 - STAIRWELL FRAMING PLANS - AREA A AND AREA G.pdf PDF
Attachment92_DLA_OPS_PH II_A-603 - DOOR SCHEDULE AND DETAILS.pdf PDF
Attachment101_DLA_OPS_PH II_S-101 - DRILLED PIER AND PIER CAP PLAN - AREA A.pdf PDF
Attachment79_DLA_OPS_PH II_A-205 - ENLARGED ELEVATIONS.pdf PDF
Attachment128_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Part 2.3.2.pdf PDF
Attachment104_DLA_OPS_PH II_S-115 - ROOF FRAMING PLAN - AREA C.pdf PDF
Attachment 64_DLA OPS_PH II_V-103.pdf PDF
Attachment112_DLA_OPS_PH II_S-304 - FOUNDATION SECTIONS.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 7

PART I - THE PRICE SCHEDULE - DLA OPS CENTER (PH-2)

REVISION 1 Dated 15 July 2020

SECTION 00010 - SUPPLIES OR SERVICES AND PRICES

SCHEDULE I - BASE BID

CLIN # DESCRIPTION QUANTITY

UNIT

MEASURE

UNIT

PRICE AMOUNT

BASE

BID

CLIN DEMO BLDG 33 - All costs in connection with 1 JOB $0 0001 demolition of warehouse Building 33, including removal and disposal of Hazardous Materials, all related site demolition, site improvements and site utilities complete as shown on the drawings and specified excluding the work described in CLIN 0002- 0014. Source of funds is MILCON.

CLIN CONSTRUCT OPS CTR PH2 - All costs in 1 JOB $0 0002 connection with construction of new DLA Ops Center, building construction only, excluding all "special costs" as identified in CLIN 0006, complete as shown on the drawings and specified excluding the work described in CLIN 0001 & 0003-0014. Source of funds is MILCON.

CLIN SITE WORK - All costs in connection with 1 JOB $0 0003 construction of new DLA Ops Center Site Work, including all related site preparation, site improvements and site utilities complete as shown on the drawings and specified excluding the work described in CLIN 0001-0002 & 0004-0014. Source of funds is MILCON.

WELLS IN SOIL - UNIT COST for installation of

16,280

LF

$/LF

$0

CLIN

geothermal wells through SOIL (installation is as described in SPEC SECTION 23 81 47); include drilling, steel encasement, grouting and associated vertical piping. The cost of the rest of the items in SPEC SECTION 23 21 47 (including permits, heat pumps, system equipment, piping pumps, electrical equipment, controls, ground heat exchanger) shall be included in CLIN 0003. Assume total bid quantity for well installation through SOIL is 16,280 LF; in accordance with FAR 52.211-18, the UNIT PRICE in this CLIN 0004 is intended to provide for field adjustment in the case where the actual field amount drilled through SOIL varies. Complete work as shown on the drawings and specified excluding the work described in CLIN 001-0003 & 0005-0014. Source of funds is MILCON.

UNIT UNIT

CLIN # DESCRIPTION QUANTITY MEASURE PRICE AMOUNT

WELLS IN ROCK - UNIT COST for installation of geothermal wells through ROCK (installation is as described in SPEC SECTION 23 81 47); include drilling, grouting and associated vertical piping. The cost of the rest of the items in SPEC SECTION 23 81 47 (including permits, heat pumps, system equipment, piping pumps, electrical equipment, controls, ground heat exchanger) shall be included in CLIN 0003. Assume total bid quantity for well installation through ROCK is 93,720 LF; in accordance with FAR 52.211-18, the UNIT PRICE in this CLIN 0005 is intended to provide for field adjustment in the case where the actual field amount drilled through ROCK varies. Complete work as shown on the drawings and specified excluding the work described in CLIN 0001-0004 & 0006-0014.

Source of funds is MILCON.

SPECIAL FOUNDATIONS (PILES AND PILE CAPS) -

Unit Cost for installation of new DLA Ops Center special foundations (piles and pile caps), complete as shown on the drawings and specified excluding the work described in CLIN 0001-0005 & 0007-0014.

Source of funds is MILCON.

93,720 LF $/LF $0

5,740 LF $/LF $0

TOTAL BASE BID $0

SCHEDULE II - OPTIONAL BID ITEMS MILCON FUNDED COSTS

PARKING LOT PAVEMENT - All costs in connection with provision of asphalt to final grade in lieu of gravel

1 JOB $0

OPTION in employee parking lot (COST DIFFERENCE - Cost to provide gravel parking should remain in CLIN 0003 Site Work), as indicated on CP103 and CP104 and specified excluding the work described in CLIN 0001- 0006 & 0008 -0014. Source of funds is MILCON.

Option to be exercise within 180 days of Contract Notice To Proceed in accordance with FAR 52.217-7.

CLIN ADDITIONAL CANOPY - All costs in connection with 1 JOB $0

OPTION

construction of a canopy that stretches from the entrance vestibule of the two-story portion of the building to the east and west, stopping at the five-story portion and at the finished face of Building 32 complete as shown on drawings and specified excluding the work described in CLIN 0001-0007 & 0009-0014. Source of funds is MILCON. Option to be exercised within 180 days of Contract Notice To Proceed in accordance with FAR 52.217-7.

UNIT UNIT

CLIN # DESCRIPTION QUANTITY MEASURE PRICE AMOUNT

OPTION

GENERATOR RELOCATION - All costs in connection with relocation of existing emergency generators, site demolition, site repair, and site preparation complete as shown on drawings and specified excluding the work described in CLIN 0001-0008 & 0010-0014. Source of funds is MILCON. Option to be exercised within 180 days of Contract Notice To Proceed in accordance with FAR 52. 217-7.

1 JOB $0

TOTAL SCHEDULE II - OPTIONAL BID ITEMS MILCON FUNDED COSTS $0

Sum of Statutory Lines $0

SCHEDULE III - OPTIONAL BID ITEMS NON-MILCON FUNDED COSTS

OPTION

FF&E - All costs in connection with providing Furniture, Fixtures & Equipment (FF&E) complete as shown on the drawings and specified excluding the work described in CLIN 0001-0009 & 0011-0014.

Sources of funds is Non-MILCON. Option to be exercised within 365 days of Contract Notice To

OPTION

NEW GENERATOR - All costs to procure and install all 150 KW Standby Diesel Generator per specifications SECTION 26 32 15.00 10 for the DLA Operations Center – PH-2, complete, including all work incidental therto as shown on the drawings and as specified exclusive of CLIN 0001-0010 & 0012- 0014. Source of funds is Non-MILCON. Option to be exercised within 365 days of Contract Notice To

OPTION

PROCURE & INSTALL TVs - All costs to Procure and install all Audio-Visual Equipment (Televisions) for the DLA Operations Center – PH-2, complete, including all work incidental thereto as shown on the drawings and specified exclusive of CLIN 0001-0011. Sources of funds is Non-MILCON. Option to be exercised within 365 days of Contract Notice To Proceed in accordance with FAR 52.217.7.

TOTAL SCHEDULE III - OPTIONAL BID ITEMS NON-MILCON FUNDED COSTS $0

TOTAL SCHEDULE I, II, & III- BASE BID, OPTIONAL NON-MILCON AND OPTIONAL ITEMS $0

STATUTORY COST LIMITATION IN THIS SOLICITATION:

Per FAR 36.205 CLINS 0001 ‐ 0009 are subject to STATUTORY COST LIMITATION OF $89,013,000.

1 JOB $0

JOB

1 JOB

1. For purposes of source selection as referenced in Section 00 22 16 of the Solicitation, and in particular Subsection 6.1, "Price" shall mean the Total Evaluated Price which will be the sum of the pricing submitted for CLINs 0001 through 0014, inclusive. Failure to provide a price for each CLIN may be deemed a deficiency because it may prevent the Government from conducting a meaningful evaluation of price, which could result in the proposal being ineligible for award.

2. Contract Completion Date: Unless indicated otherwise, the completion date for the scope of the

CLIN is 1,020 days after notice to proceed.

Draft CLIN Revision 07162020 ko changes