This document includes plans and specifications for the construction of a Defense Logistics Agency Aviation Operations Center, Phase II project. The project will construct a 281,075 square foot, multi-story office building to accommodate 1,622 employees in Richmond, Virginia. The facility will include administrative offices, conference rooms, kitchen and break areas, restrooms, storage and supply rooms, elevators, lighting protection, fire suppression, security, and energy management systems. The construction is valued between $25-100 million and will be awarded as a firm-fixed-price contract through full and open competition under FAR Part 15. The U.S. Army Corps of Engineers will issue the solicitation on May 27, 2020 on beta.sam.gov and intends to award within 1020 calendar days of notice to proceed. Evaluation criteria will include past performance, project approach, small business participation plan, and price.

View the file

Other files

File Type Posted
W91236-20-R-2005 Amendment 4 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 73_DLA_OPS_PH II_A-119 - FOURTH FLOOR PLAN - AREA A4.pdf PDF
Attachment 66 _DLA_OPS_PH II_A-106 - FIRST FLOOR PLAN - AREA A1.pdf PDF
Attachment85_DLA_OPS_PH II_A-421 - ENLARGED METROLOGY LAB AND MYLAR ROOM PLAN.pdf PDF
Attachment91_DLA_OPS_PH II_A-602 - DOOR SCHEDULE.pdf PDF
Attachment95_DLA_OPS_PH II_A-703 - FINISH SCHEDULE.pdf PDF
Attachment 74_DLA_OPS_PH II_A-120 - FOURTH FLOOR PLAN - AREA D4.pdf PDF
Attachment 122 Spec-Drawing List 07-08-20.xlsx XLSX spreadsheet
Attachment129_DLA_OPS_PH II_321216 SPECIFICATIONS VOL2-Asphalt.pdf PDF
Attachment116_DLA_OPS_PH II_S-603 - COLUMN SCHEDULE.pdf PDF
Attachment80_DLA_OPS_PH II_A-206 - ENLARGED ELEVATIONS.pdf PDF
Attachment 71_DLA_OPS_PH II_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Attachment 69_DLA_OPS_PH II_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Attachment 127_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Page1.pdf PDF
Attachment105_DLA_OPS_PH II_S-118 - SECOND FLOOR FRAMING PLAN - AREA F.pdf PDF
Attachment 62_DLA OPS_PH II_V-101.pdf PDF
Attachment108_DLA_OPS_PH II_S-132 - STAIRWELL FRAMING PLANS - AREA D.pdf PDF
Attachment122_OpsCtrPhaseII_final_GeotechRpt_Sept2019.pdf PDF
Attachment94_DLA_OPS_PH II_A-702 - FINISH SCHEDULE.pdf PDF
Attachment 65_DLA_OPS_PH II_A-103 - OVERALL THIRD FLOOR PLAN.pdf PDF
Attachment89_DLA_OPS_PH II_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Attachment 58_DLA OPS_CU101-CU102.pdf PDF
Attachment102_DLA_OPS_PH II_S-104 - DRILLED PIER AND PIER CAP PLAN - AREA G.pdf PDF
Attachment124_DLA_OPS_PH II_087100 SPECIFICATIONS VOL1-Door Hardware.pdf PDF
Attachment109_DLA_OPS_PH II_S-133 - STAIRWELL AND ELEVATOR ROOF FRAMING PLANS - AREA D.pdf PDF
Attachment77_DLA_OPS_PH II_A-145 - PARTIAL LOW LEVEL ROOF PLAN.pdf PDF
Attachment82_DLA_OPS_PH II_A-208 - ENLARGED ELEVATIONS.pdf PDF
Final W91236-20-R-2005 Amendment 3 DLA Ops Center.pdf PDF
Attachment93_DLA_OPS_PH II_A-701 - FINISH SCHEDULE.pdf PDF
Attachment 59_DLA OPS_PH II_C-512.pdf PDF
Attachment90_DLA_OPS_PH II_A-601 - DOOR SCHEDULE.pdf PDF
Attachment117_DLA_OPS_PH II_S-604 - COLUMN SCHEDULE.pdf PDF
Attachment125_DLA_OPS_PH II_089100 SPECIFICATIONS VOL1-OMIT Metal Wall Louvers.pdf PDF
Attachment 61_DLA OPS_PH II_CS101.pdf PDF
Attachment81_DLA_OPS_PH II_A-207 - ENLARGED ELEVATIONS.pdf PDF
Attachment 72_DLA_OPS_PH II_A-118 - THIRD FLOOR PLAN - AREA D3.pdf PDF
Attachment123_DLA_OPS_PH II_084400 SPECIFICATIONS VOL1-Para1.5.6.pdf PDF
Attachment75_DLA_OPS_PH II_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Attachment113_DLA_OPS_PH II_S-312 - FRAMING SECTIONS.pdf PDF
Attachment120_DLA_OPS_PH II_T-704 - VOICE AND DATA BACKBONE DIAGRAM.pdf PDF
Attachment115_DLA_OPS_PH II_S-503 - TYPICAL DETAILS.pdf PDF
Attachment107_DLA_OPS_PH II_S-131 - STAIRWELL FRAMING PLANS - AREA A AND AREA G.pdf PDF
Attachment92_DLA_OPS_PH II_A-603 - DOOR SCHEDULE AND DETAILS.pdf PDF
Attachment101_DLA_OPS_PH II_S-101 - DRILLED PIER AND PIER CAP PLAN - AREA A.pdf PDF
Attachment79_DLA_OPS_PH II_A-205 - ENLARGED ELEVATIONS.pdf PDF
Attachment128_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Part 2.3.2.pdf PDF
Attachment104_DLA_OPS_PH II_S-115 - ROOF FRAMING PLAN - AREA C.pdf PDF
Attachment 64_DLA OPS_PH II_V-103.pdf PDF
Attachment112_DLA_OPS_PH II_S-304 - FOUNDATION SECTIONS.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMPBPS

LOC

GENERAL NOTES

A. SEE SHEET A-001 FOR GENERAL NOTES

B. SEE SHEET A-103 FOR PARTITION SCHEDULE

C. SEE SHEETS A-606 THROUGH A-613 FOR ALL WINDOW, CURTAIN WALL AND

STOREFRONT ELEVATIONS

D. SEE SHEETS A-701 THROUGH A-706 FOR FINISH SCHEDULES

9 10 116

E

H

L

R

P

N

G

F

K

I

A1

A-301

A1

A-305

STAIR

2A

STORAGE

CLOSET

STORAGE

CLOSET

PANTRY

COPY ROOM

CONFERENCE

ROOM

CONFERENCE

ROOM

TEAMING

ROOM

OFFICE

CORRIDOR

WOMENS

MENS

JANITORS

CLOSET

CORRIDOR

TELECOM

ELEC ROOM

SECURITY

TEAMING

ROOM

FILE ROOM

OFFICE

OFFICE

CONFERENCE

ROOM

CONFERENCE

ROOM

STORAGE

ROOM

OFFICE

CUBICLES

OFFICE

CUBICLES

OFFICE

6 21

S 2A

A-402

D4

A-417

C1

CW8

CW10

W10

W11

W11

W11

W11

CW13 CW14 W11 W10

A1 A-312

A1 A-311

A1 A-313

A1 A-314

A1 A-315

CW9

A-420

A2

C4

A4

C2

A-519

F1

SIM

12A

12A 12A

4C

4B1

4B1

4B1

4B

6A

4C

4C

4C

4C

4C

4C

4B1

4B1

4C

4B1

4C

4C 4C

4C

4C

4B1 4B1

4C

4C

4S

4S4S

4S

4C1

A-518

C6

SF2

A-518

A6

SIM

A-518

A6 A-518

C8

A-519

F1

A-519

F4 A-507

G4

SIM

A-519

F6

A-519

C1

A-506

D2

SIM

A-519

A1

A-520

D8

A-519

C1

SIM

A-521

F3

A-521

F5

A-511

A3

SIM

4B

4B

4S

4C

4C 4C

4C

14'-11 1/2" 5'-0" 23'-8" 9'-5" 9'-6"

'-6

/8

'-6

/4

11'-2" 10'-8" 7'-10" 9'-0" 9'-1 1/2"

8' -0

/2

6'

-8

8' -0

6'

-8

8' -7

/2

8'

-0

/2

6' -8

8'

-0

6' -8

8'

-7

/2

57'-0" 16'-8" 32'-0" 6'-0" 6'-8" 6'-0" 23'-4" 6'-0"

32'-0" 51'-0" 6'-8" 23'-4" 6'-8" 23'-4" 6'-8"

28'-9" 60'-0" 30'-0" 30'-0"

FEC

FEC FEC

FEC

1' -1

1'

-1

1'-1"1'-1"

A-522

E6 A-508

E9

A-516

D9

A-511

A5

A1

A-004

1 1

A-603

A-506

A2

SIM

4' TB1

8' MB

6' MB

6' MB

8' MB

6' MB

6' MB 8' MB

2 2

A-419

A1

A-419

A5

A7

A3

A-201 E1

3'-8"

A-206 B1

T V

T V

36" TV

72" TV

42" TV

42" TV

42" TV

DAVID P. ISBELL A

I

N I

G

RI

V

FOHTLAE

W

N O

M M

O C

No.

ARCH TI ECT

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

1909 CYPRESS AVENUE

VIRGINIA BEACH, VA

23451

(757) 417 - 0140

C O

N T

R A

C T

N O

W

-1

-D

-0

10 JANUARY 2020

737214

A-113

S E

C O

N D

F L O

O R

P L A

N

A R

E A

A

D E

F E

N S

E

S

U P

P L Y

C E

N T

E R

R

IC

H M

O N

D

D S

C R

R

IC

H

M O

N D

V

IR

G

IN

IA

N O

R F

O L K

D

IS

T R

IC

T

F

R O

N T

S T

N

O R

F O

L K

V

A

W A

L L E

R T

O D

D

S A

D L E

R

A W

O O

L P

E R

T C

O M

P A

N Y

C

Y P

R E

S S

A V

E N

U E

V

IR

G

IN

IA

B

E A

C H

V

A

D S

R

M O

H

D S

R

D P

I

J

A N

U A

R Y

D L A

O P

E R

A T

IO

N

S C

E N

T E

R

P H

-2

D E

F E

N S

E L

O G

IS

T

IC

S

A G

E N

C Y

A

V

IA

T

IO

N D

S C

R

24'16'8'4'0 1/8"=1'-0"

GRAPHIC SCALE

KEY PLAN

NOT TO SCALE

A2 D2

F2

G2

SHEET KEYNOTES

1 FIRE EXTINGUISHER CABINET, FULLY RECESSED

2 MARKERBOARD (MB). SEE FLOOR PLANS FOR LOCATIONS AND

WIDTHS

3 STANDPIPE RISER AND FIRE DEPARTMENT CONNECTION, SEE FIRE

PROTECTION DRAWINGS

4 PAPER TOWEL DISPENSER. SEE SHEET A-419 FOR MOUNTING

HEIGHT SCHEDULE

5 ROD & SHELF. MOUNT 3/4" PLYWOOD SHELF @ 6'-6" A.F.F. REFER

TO DETAIL A9/A-419

6 TACKBOARD (TB). SEE FLOOR PLANS FOR LOCATIONS AND

WIDTHS

1/8" = 1'-0"A-201

A1 SECOND FLOOR PLAN - AREA A2

A

M E

N D

M E

N T

N O

-2 -2

A

M E

N D

M E

N T

N O

-0 -2

Sheets
A-103 - OVERALL THIRD FLOOR PLAN
A-106 - FIRST FLOOR PLAN - AREA A1
A-111 - FIRST FLOOR PLAN - AREA F1
A-113 - SECOND FLOOR PLAN - AREA A2
A-114 - SECOND FLOOR PLAN - AREA D2
A-115 - SECOND FLOOR PLAN - AREA F2
A-117 - THIRD FLOOR PLAN - AREA A3
A-118 - THIRD FLOOR PLAN - AREA D3
A-119 - FOURTH FLOOR PLAN - AREA A4
A-120 - FOURTH FLOOR PLAN - AREA D4
A-121 - FIFTH FLOOR PLAN - AREA A5
A-122 - FIFTH FLOOR PLAN - AREA D5
A-145 - PARTIAL LOW LEVEL ROOF PLAN
A-204 - ENLARGED ELEVATIONS
A-205 - ENLARGED ELEVATIONS
A-206 - ENLARGED ELEVATIONS
A-207 - ENLARGED ELEVATIONS
A-208 - ENLARGED ELEVATIONS
A-209 - ENLARGED ELEVATIONS
A-410 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS - AREA D
A-422 - EXTERIOR SIGNAGE PLAN, ELEVATIONS, SECTIONS AND DETAILS
A-512 - COLUMN DETAILS
A-526 - MISCELLANEOUS DETAILS
A-601 - DOOR SCHEDULE
A-602 - DOOR SCHEDULE
A-603 - DOOR SCHEDULE AND DETAILS

File details come from the government source that posted it. Updated .