This document package includes plans for a federal construction project and a related pre-solicitation notice. The plans show a second floor layout for a Defense Logistics Agency facility in Richmond, Virginia, including various office, support and amenity spaces.

The pre-solicitation notice is for construction of a 281,075 square foot, multi-story office building as Phase II of the DLA Aviation Operations Center at the Defense Supply Center Richmond. The Army Corps of Engineers intends to issue a request for proposal with the requirement solicited unrestricted and full and open competition. The project is valued between $25-100 million and will be awarded on a firm-fixed price basis under FAR Part 15. Evaluation criteria include past performance, project approach, small business participation and price. The solicitation is expected to be posted to beta.sam.gov on May 27, 2020. Interested parties should monitor the site for the RFP and any amendments.

View the file

Other files

File Type Posted
W91236-20-R-2005 Amendment 4 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 73_DLA_OPS_PH II_A-119 - FOURTH FLOOR PLAN - AREA A4.pdf PDF
Attachment 66 _DLA_OPS_PH II_A-106 - FIRST FLOOR PLAN - AREA A1.pdf PDF
Attachment85_DLA_OPS_PH II_A-421 - ENLARGED METROLOGY LAB AND MYLAR ROOM PLAN.pdf PDF
Attachment91_DLA_OPS_PH II_A-602 - DOOR SCHEDULE.pdf PDF
Attachment95_DLA_OPS_PH II_A-703 - FINISH SCHEDULE.pdf PDF
Attachment 74_DLA_OPS_PH II_A-120 - FOURTH FLOOR PLAN - AREA D4.pdf PDF
Attachment 122 Spec-Drawing List 07-08-20.xlsx XLSX spreadsheet
Attachment129_DLA_OPS_PH II_321216 SPECIFICATIONS VOL2-Asphalt.pdf PDF
Attachment116_DLA_OPS_PH II_S-603 - COLUMN SCHEDULE.pdf PDF
Attachment80_DLA_OPS_PH II_A-206 - ENLARGED ELEVATIONS.pdf PDF
Attachment 71_DLA_OPS_PH II_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Attachment 127_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Page1.pdf PDF
Attachment105_DLA_OPS_PH II_S-118 - SECOND FLOOR FRAMING PLAN - AREA F.pdf PDF
Attachment 62_DLA OPS_PH II_V-101.pdf PDF
Attachment108_DLA_OPS_PH II_S-132 - STAIRWELL FRAMING PLANS - AREA D.pdf PDF
Attachment122_OpsCtrPhaseII_final_GeotechRpt_Sept2019.pdf PDF
Attachment94_DLA_OPS_PH II_A-702 - FINISH SCHEDULE.pdf PDF
Attachment 65_DLA_OPS_PH II_A-103 - OVERALL THIRD FLOOR PLAN.pdf PDF
Attachment89_DLA_OPS_PH II_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Attachment 58_DLA OPS_CU101-CU102.pdf PDF
Attachment102_DLA_OPS_PH II_S-104 - DRILLED PIER AND PIER CAP PLAN - AREA G.pdf PDF
Attachment124_DLA_OPS_PH II_087100 SPECIFICATIONS VOL1-Door Hardware.pdf PDF
Attachment109_DLA_OPS_PH II_S-133 - STAIRWELL AND ELEVATOR ROOF FRAMING PLANS - AREA D.pdf PDF
Attachment77_DLA_OPS_PH II_A-145 - PARTIAL LOW LEVEL ROOF PLAN.pdf PDF
Attachment82_DLA_OPS_PH II_A-208 - ENLARGED ELEVATIONS.pdf PDF
Final W91236-20-R-2005 Amendment 3 DLA Ops Center.pdf PDF
Attachment93_DLA_OPS_PH II_A-701 - FINISH SCHEDULE.pdf PDF
Attachment 59_DLA OPS_PH II_C-512.pdf PDF
Attachment90_DLA_OPS_PH II_A-601 - DOOR SCHEDULE.pdf PDF
Attachment117_DLA_OPS_PH II_S-604 - COLUMN SCHEDULE.pdf PDF
Attachment125_DLA_OPS_PH II_089100 SPECIFICATIONS VOL1-OMIT Metal Wall Louvers.pdf PDF
Attachment 61_DLA OPS_PH II_CS101.pdf PDF
Attachment81_DLA_OPS_PH II_A-207 - ENLARGED ELEVATIONS.pdf PDF
Attachment 68_DLA_OPS_PH II_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Attachment 72_DLA_OPS_PH II_A-118 - THIRD FLOOR PLAN - AREA D3.pdf PDF
Attachment123_DLA_OPS_PH II_084400 SPECIFICATIONS VOL1-Para1.5.6.pdf PDF
Attachment75_DLA_OPS_PH II_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Attachment113_DLA_OPS_PH II_S-312 - FRAMING SECTIONS.pdf PDF
Attachment120_DLA_OPS_PH II_T-704 - VOICE AND DATA BACKBONE DIAGRAM.pdf PDF
Attachment115_DLA_OPS_PH II_S-503 - TYPICAL DETAILS.pdf PDF
Attachment107_DLA_OPS_PH II_S-131 - STAIRWELL FRAMING PLANS - AREA A AND AREA G.pdf PDF
Attachment92_DLA_OPS_PH II_A-603 - DOOR SCHEDULE AND DETAILS.pdf PDF
Attachment101_DLA_OPS_PH II_S-101 - DRILLED PIER AND PIER CAP PLAN - AREA A.pdf PDF
Attachment79_DLA_OPS_PH II_A-205 - ENLARGED ELEVATIONS.pdf PDF
Attachment128_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Part 2.3.2.pdf PDF
Attachment104_DLA_OPS_PH II_S-115 - ROOF FRAMING PLAN - AREA C.pdf PDF
Attachment 64_DLA OPS_PH II_V-103.pdf PDF
Attachment112_DLA_OPS_PH II_S-304 - FOUNDATION SECTIONS.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANN

LOC

T C

C B

GENERAL NOTES

A. SEE SHEET A-001 FOR GENERAL NOTES

B. SEE SHEET A-103 FOR PARTITION SCHEDULE

C. SEE SHEETS A-606 THROUGH A-613 FOR ALL WINDOW, CURTAIN WALL AND

STOREFRONT ELEVATIONS

D. SEE SHEETS A-701 THROUGH A-706 FOR FINISH SCHEDULES

11 13 14

17 18

E

H

L

R

X7

XC

P

12 16

N

O

G

F

K

I

A1

A-302

STAIR

2B

ELEV

ELEV 2B

ELEV

ELEV 2A

ELEV

ELEV 2C

ELEV

ELEV 2D

OFFICE

OFFICE

TEAMING

ROOM

ELEVATOR

LOBBY

SUPPLY

ROOM

COPY ROOM

ELEC ROOM

TELECOM

CORRIDOR

WOMENS

MENS

JANITORS

CLOSET

OFFICE

243 CORRIDOR

COPY ROOM

PANTRY

STORAGE

CLOSET

STORAGE

CLOSET

RECEPTION

OFFICE

CUBICLES

OFFICE

CUBICLES

1A

1B

S 2B

A-403

D4

A-410

C1

OFFICE

OFFICE

OFFICE

XB.4

A-417

C4

XC.2

W10

CW11

CW12

CW10

W11

W11

CW14W11W10W10W10

A5 A-316

4C

12A

12A

12A

4A

4C

4A

4B1

4A 6B

4C

4C

4A

4C

4E

4C1

4E

4B1

4C

4B1

4B1

4B1

4C

6A

4C4C

4C

4C

4S4S

4S4S

8B

8B

8A

8B8B

8A

8A

8B

4A

4A

A-507

G4

SIM

A-507

G4

SIM

A-515

F2

SF1

SF1

SF2

A-509

D4

SIM

A-518

A6

A-519

A3

A-520

F1

A-520

D1

A-520

D3

A-520

D6 A-520

A1

A-520

A3

A-520

A6

A-519

C1

SIM

A-511

A3

SIM

A-519

F6

SIM

A-519

F6

SIM

A-518

A6

SIM

A-518

A6

SIM

4C

4C

4C

4C1

4C

4S

4B1 4B1

4B

4B

4B

4B1

4B1

4B1

4B1

23'-8 1/4" 10'-0 1/4"

11'-10" 11'-10 1/4"

6'-0" 23'-4" 6'-0" 23'-4" 6'-0" 23'-4" 7'-4" 6'-8" 6'-8"

6'-8" 16'-8" 13'-4" 23'-4" 38'-0 3/16" 5'-11 15/16" 16'-8" 8'-11 7/8" 21'-4 1/8" 4'-7 7/8"

8' -0

/2

6'

-8

8' -0

6'

-8

9' -3

/8

'-2

'-3

/4

10'-0 5/8" 10'-4 1/2"

'-5

'-2

/1 6"

7' -5

'-6

/2

'-6

3/

8'-4 3/8"13'-0 7/8" 22'-6 1/2" 6'-5" 19'-2 5/8" 10'-0" 10'-4 1/2" 8'-8"

A-517

A4

SIM

A-521

A6

8'-0 1/8"

FEC

FEC

FECFEC

A-522

E6

A1

A-004

A-506

A2

SIM

6' MB

4' TB1

4' TB1

A-419

A7

A5

A-419

A3

A1

A-201 E1

32'-0 3/4" 13'-11 1/8" 1'-6 25/32"

A-201 B1

A1 A-316

A-419A5

A-419A5

W4

W4

42" TV 42" TV

42" TV

T V

-W10

42" TV

42" TV 42" TV

DAVID P. ISBELL A

I

N I

G

RI

V

FOHTLAE

W

N O

M M

O C

No.

ARCH TI ECT

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

1909 CYPRESS AVENUE

VIRGINIA BEACH, VA

23451

(757) 417 - 0140

C O

N T

R A

C T

N O

W

-1

-D

-0

10 JANUARY 2020

737215

A-114

S E

C O

N D

F L O

O R

P L A

N

A R

E A

D

D E

F E

N S

E

S

U P

P L Y

C E

N T

E R

R

IC

H M

O N

D

D S

C R

R

IC

H

M O

N D

V

IR

G

IN

IA

N O

R F

O L K

D

IS

T R

IC

T

F

R O

N T

S T

N

O R

F O

L K

V

A

W A

L L E

R T

O D

D

S A

D L E

R

A W

O O

L P

E R

T C

O M

P A

N Y

C

Y P

R E

S S

A V

E N

U E

V

IR

G

IN

IA

B

E A

C H

V

A

D S

R

M O

H

D S

R

D P

I

J

A N

U A

R Y

D L A

O P

E R

A T

IO

N

S C

E N

T E

R

P H

-2

D E

F E

N S

E L

O G

IS

T

IC

S

A G

E N

C Y

A

V

IA

T

IO

N D

S C

R

24'16'8'4'0 1/8"=1'-0"

GRAPHIC SCALE

KEY PLAN

NOT TO SCALE

A2 D2

F2

G2

SHEET KEYNOTES

1 FIRE EXTINGUISHER CABINET, FULLY RECESSED

2 STANDPIPE RISER AND FIRE DEPARTMENT CONNECTION, SEE FIRE

PROTECTION DRAWINGS

3 ROD & SHELF. MOUNT 3/4" PLYWOOD SHELF @ 6'-6" A.F.F. REFER

TO DETAIL A9/A-419

4 PAPER TOWEL DISPENSER. SEE SHEET A-419 FOR MOUNTING

HEIGHT SCHEDULE

5 TACKBOARD (TB). SEE FLOOR PLANS FOR LOCATIONS AND

WIDTHS

6 MARKERBOARD (MB). SEE FLOOR PLANS FOR LOCATIONS AND

WIDTHS

7 METAL LADDER ROOF LADDER, SEE DETAIL A3/A-526

1/8" = 1'-0"A-201

A1 SECOND FLOOR PLAN - AREA D2

A

M E

N D

M E

N T

N O

-2 -2

A

M E

N D

M E

N T

N O

-0 -2

Sheets
A-103 - OVERALL THIRD FLOOR PLAN
A-106 - FIRST FLOOR PLAN - AREA A1
A-111 - FIRST FLOOR PLAN - AREA F1
A-113 - SECOND FLOOR PLAN - AREA A2
A-114 - SECOND FLOOR PLAN - AREA D2
A-115 - SECOND FLOOR PLAN - AREA F2
A-117 - THIRD FLOOR PLAN - AREA A3
A-118 - THIRD FLOOR PLAN - AREA D3
A-119 - FOURTH FLOOR PLAN - AREA A4
A-120 - FOURTH FLOOR PLAN - AREA D4
A-121 - FIFTH FLOOR PLAN - AREA A5
A-122 - FIFTH FLOOR PLAN - AREA D5
A-145 - PARTIAL LOW LEVEL ROOF PLAN
A-204 - ENLARGED ELEVATIONS
A-205 - ENLARGED ELEVATIONS
A-206 - ENLARGED ELEVATIONS
A-207 - ENLARGED ELEVATIONS
A-208 - ENLARGED ELEVATIONS
A-209 - ENLARGED ELEVATIONS
A-410 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS - AREA D
A-422 - EXTERIOR SIGNAGE PLAN, ELEVATIONS, SECTIONS AND DETAILS
A-512 - COLUMN DETAILS
A-526 - MISCELLANEOUS DETAILS
A-601 - DOOR SCHEDULE
A-602 - DOOR SCHEDULE
A-603 - DOOR SCHEDULE AND DETAILS

File details come from the government source that posted it. Updated .