About this file

This notice provides details for an upcoming solicitation for construction services. The U.S. Army Corps of Engineers-Norfolk District intends to issue a Request for Proposal to construct a 281,075 square foot, multi-story office building to serve as the DLA Aviation Operations Center Phase II in Richmond, Virginia. The facility will house 1,622 employees and include various administrative offices, conference rooms, and support spaces. The project has an estimated value between $25-100 million and will utilize conventional construction methods compliant with DoD standards for facility design, sustainability, and antiterrorism requirements. The contract completion date will be 1020 calendar days following notice to proceed. The solicitation will be issued electronically on beta.sam.gov on or around May 27, 2020. The acquisition will follow FAR Part 15 and result in a firm-fixed price contract awarded based on a best value determination considering past performance, technical approach, small business participation, and price factors.

View the file

Other files

File Type Posted
W91236-20-R-2005 Amendment 4 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 73_DLA_OPS_PH II_A-119 - FOURTH FLOOR PLAN - AREA A4.pdf PDF
Attachment 66 _DLA_OPS_PH II_A-106 - FIRST FLOOR PLAN - AREA A1.pdf PDF
Attachment85_DLA_OPS_PH II_A-421 - ENLARGED METROLOGY LAB AND MYLAR ROOM PLAN.pdf PDF
Attachment91_DLA_OPS_PH II_A-602 - DOOR SCHEDULE.pdf PDF
Attachment95_DLA_OPS_PH II_A-703 - FINISH SCHEDULE.pdf PDF
Attachment 122 Spec-Drawing List 07-08-20.xlsx XLSX spreadsheet
Attachment129_DLA_OPS_PH II_321216 SPECIFICATIONS VOL2-Asphalt.pdf PDF
Attachment116_DLA_OPS_PH II_S-603 - COLUMN SCHEDULE.pdf PDF
Attachment80_DLA_OPS_PH II_A-206 - ENLARGED ELEVATIONS.pdf PDF
Attachment 71_DLA_OPS_PH II_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Attachment 69_DLA_OPS_PH II_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Attachment 127_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Page1.pdf PDF
Attachment105_DLA_OPS_PH II_S-118 - SECOND FLOOR FRAMING PLAN - AREA F.pdf PDF
Attachment 62_DLA OPS_PH II_V-101.pdf PDF
Attachment108_DLA_OPS_PH II_S-132 - STAIRWELL FRAMING PLANS - AREA D.pdf PDF
Attachment122_OpsCtrPhaseII_final_GeotechRpt_Sept2019.pdf PDF
Attachment94_DLA_OPS_PH II_A-702 - FINISH SCHEDULE.pdf PDF
Attachment 65_DLA_OPS_PH II_A-103 - OVERALL THIRD FLOOR PLAN.pdf PDF
Attachment89_DLA_OPS_PH II_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Attachment 58_DLA OPS_CU101-CU102.pdf PDF
Attachment102_DLA_OPS_PH II_S-104 - DRILLED PIER AND PIER CAP PLAN - AREA G.pdf PDF
Attachment124_DLA_OPS_PH II_087100 SPECIFICATIONS VOL1-Door Hardware.pdf PDF
Attachment109_DLA_OPS_PH II_S-133 - STAIRWELL AND ELEVATOR ROOF FRAMING PLANS - AREA D.pdf PDF
Attachment77_DLA_OPS_PH II_A-145 - PARTIAL LOW LEVEL ROOF PLAN.pdf PDF
Attachment82_DLA_OPS_PH II_A-208 - ENLARGED ELEVATIONS.pdf PDF
Final W91236-20-R-2005 Amendment 3 DLA Ops Center.pdf PDF
Attachment93_DLA_OPS_PH II_A-701 - FINISH SCHEDULE.pdf PDF
Attachment 59_DLA OPS_PH II_C-512.pdf PDF
Attachment90_DLA_OPS_PH II_A-601 - DOOR SCHEDULE.pdf PDF
Attachment117_DLA_OPS_PH II_S-604 - COLUMN SCHEDULE.pdf PDF
Attachment125_DLA_OPS_PH II_089100 SPECIFICATIONS VOL1-OMIT Metal Wall Louvers.pdf PDF
Attachment 61_DLA OPS_PH II_CS101.pdf PDF
Attachment81_DLA_OPS_PH II_A-207 - ENLARGED ELEVATIONS.pdf PDF
Attachment 68_DLA_OPS_PH II_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Attachment 72_DLA_OPS_PH II_A-118 - THIRD FLOOR PLAN - AREA D3.pdf PDF
Attachment123_DLA_OPS_PH II_084400 SPECIFICATIONS VOL1-Para1.5.6.pdf PDF
Attachment75_DLA_OPS_PH II_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Attachment113_DLA_OPS_PH II_S-312 - FRAMING SECTIONS.pdf PDF
Attachment120_DLA_OPS_PH II_T-704 - VOICE AND DATA BACKBONE DIAGRAM.pdf PDF
Attachment115_DLA_OPS_PH II_S-503 - TYPICAL DETAILS.pdf PDF
Attachment107_DLA_OPS_PH II_S-131 - STAIRWELL FRAMING PLANS - AREA A AND AREA G.pdf PDF
Attachment92_DLA_OPS_PH II_A-603 - DOOR SCHEDULE AND DETAILS.pdf PDF
Attachment101_DLA_OPS_PH II_S-101 - DRILLED PIER AND PIER CAP PLAN - AREA A.pdf PDF
Attachment79_DLA_OPS_PH II_A-205 - ENLARGED ELEVATIONS.pdf PDF
Attachment128_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Part 2.3.2.pdf PDF
Attachment104_DLA_OPS_PH II_S-115 - ROOF FRAMING PLAN - AREA C.pdf PDF
Attachment 64_DLA OPS_PH II_V-103.pdf PDF
Attachment112_DLA_OPS_PH II_S-304 - FOUNDATION SECTIONS.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11 13 14

17 18

E

H

L

R

P

12 16

N

G

F

K

I

A1

A-302

OFFICE

CUBICLES

OFFICE

CUBICLES

TEAMING

ROOM

ELEV

ELEV 4B

ELEV

ELEV 4A

ELEV

ELEV 4C

ELEV

ELEV 4D

STAIR

4B

ELEVATOR

LOBBY

TEAMING

ROOM

426 SUPPLY

ROOM

SUPPLY

ROOM

TELECOM

ELEC ROOM

COPY ROOM

CORRIDOR

WOMENS

MENS

JANITORS

CLOSET

OFFICE

CORRIDOR

439 COPY ROOM

PANTRY

STORAGE

CLOSET

STORAGE

CLOSET

S 4B

A-403

A1

OFFICE

TEAMING

ROOM

TEAMING

ROOM

OFFICE

TEAMING

ROOM

CW11

W10 W10

W10 W10 W10 CW12

CW20

CW19

W11

W11

W11

W11

CW10

4C4C 12A

12A 12A

4B1

4C

4B14C4C

4A

4C

4E

4B1

4E 4B1

4B1

4B1

4B1

6B

4C

4B1

4B1

4B14B1

4B

6A

4C

4C

4C

4C4C

12A

8B

8B

8A

8B8B

8A

8A

8B

4S

4S

4S

4S

4C

A-417

C4

SIM

4A4A

4A

4A

4A

4A

SF1

SF1

4C

4C

4C

4B

4B

1A

1B

OFFICE

CUBICLES

6'-8" 23'-4" 6'-8" 23'-4" 3'-11" 2'-1" 32'-0"

'-5

/1 6"

'-7

/8

11'-10" 11'-11" 10'-0" 12'-11 3/4" 8'-5" 10'-10 1/4" 11'-8 1/4" 6'-5" 10'-0 3/8" 9'-1 5/8" 10'-6" 12'-3 5/16" 6'-2 15/16" 14'-4 1/8" 9'-0 3/4"

30'-0" 30'-0" 30'-0" 30'-0" 29'-11" 15'-5 31/32"

11'-10 3/8"11'-10"

4C1

'-6

/1

6"

8'-0 1/8"

FEC

FEC

FECFEC

A-511

A3

SIM

A-522

E6

SIM

A-518

A6

SIM

A-518

A6

SIM

A-518

A6

SIM

A-520

A6

SIM

A-507

G4

SIM

A-520

A3

SIM

A-520

A3

SIM

A-520

D6

SIM

A-511

C5

SIM

A-507

G4

SIM

A-519

F6

SIM

6A

A-517

D8

A-521

F1

SIM

A-507

D8

A-520

F1

SIM

A-519

A3

SIM

A-508

D6 A-410

C1

SIM

A-518

F2

SIM

A-522

C1

SIM

A-506

A2

SIM

6' MB

6' MB

8' MB

8' MB

4' TB1

4' MB

4' TB1

A-419

A7

A5

A-419

A3

A1

6'-4" 16'-8" 8'-8" 21'-4" 4'-8"

A-201 E1

A-201 B1

CW9

7' -1

1/

4" 6'

-8

8' -0

6'

-8

8' -8

/4

9'

-0

'-0

2' -0

8' -8

/4

6'

-8

8' -0

6'

-8

7' -1

1/

8"

CW21

CW22

T V

T V

42" TV

W4

42" TV 42" TV

GENERAL NOTES

A. SEE SHEET A-001 FOR GENERAL NOTES

B. SEE SHEET A-103 FOR PARTITION SCHEDULE

C. SEE SHEETS A-606 THROUGH A-613 FOR ALL WINDOW, CURTAIN WALL AND

STOREFRONT ELEVATIONS

D. SEE SHEETS A-701 THROUGH A-706 FOR FINISH SCHEDULES

DAVID P. ISBELL A

I

N I

G

RI

V

FOHTLAE

W

N O

M M

O C

No.

ARCH TI ECT

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

1909 CYPRESS AVENUE

VIRGINIA BEACH, VA

23451

(757) 417 - 0140

C O

N T

R A

C T

N O

W

-1

-D

-0

10 JANUARY 2020

737221

A-120

F O

U R

T H

F L O

O R

P L A

N

A R

E A

D

D E

F E

N S

E

S

U P

P L Y

C E

N T

E R

R

IC

H M

O N

D

D S

C R

R

IC

H

M O

N D

V

IR

G

IN

IA

N O

R F

O L K

D

IS

T R

IC

T

F

R O

N T

S T

N

O R

F O

L K

V

A

W A

L L E

R T

O D

D

S A

D L E

R

A W

O O

L P

E R

T C

O M

P A

N Y

C

Y P

R E

S S

A V

E N

U E

V

IR

G

IN

IA

B

E A

C H

V

A

D S

R

M O

H

D S

R

D P

I

J

A N

U A

R Y

D L A

O P

E R

A T

IO

N

S C

E N

T E

R

P H

-2

D E

F E

N S

E L

O G

IS

T

IC

S

A G

E N

C Y

A

V

IA

T

IO

N D

S C

R

24'16'8'4'0 1/8"=1'-0"

GRAPHIC SCALE

KEY PLAN

NOT TO SCALE

A4 D4

SHEET KEYNOTES

1 FIRE EXTINGUISHER CABINET, FULLY RECESSED

2 45 MINUTE RATED WINDOW ASSEMBLY

3 PAPER TOWEL DISPENSER. SEE SHEET A-419 FOR MOUNTING

HEIGHT SCHEDULE

4 TACKBOARD (TB). SEE FLOOR PLANS FOR LOCATIONS AND

WIDTHS

5 ROD & SHELF. MOUNT 3/4" PLYWOOD SHELF @ 6'-6" A.F.F. REFER

TO DETAIL A9/A-419

6 MARKERBOARD (MB). SEE FLOOR PLANS FOR LOCATIONS AND

WIDTHS

1/8" = 1'-0"A-120

FOURTH FLOOR PLAN - AREA D4A1

A

M E

N D

M E

N T

N O

-2 -2

A

M E

N D

M E

N T

N O

-0 -2

Sheets
A-103 - OVERALL THIRD FLOOR PLAN
A-106 - FIRST FLOOR PLAN - AREA A1
A-111 - FIRST FLOOR PLAN - AREA F1
A-113 - SECOND FLOOR PLAN - AREA A2
A-114 - SECOND FLOOR PLAN - AREA D2
A-115 - SECOND FLOOR PLAN - AREA F2
A-117 - THIRD FLOOR PLAN - AREA A3
A-118 - THIRD FLOOR PLAN - AREA D3
A-119 - FOURTH FLOOR PLAN - AREA A4
A-120 - FOURTH FLOOR PLAN - AREA D4
A-121 - FIFTH FLOOR PLAN - AREA A5
A-122 - FIFTH FLOOR PLAN - AREA D5
A-145 - PARTIAL LOW LEVEL ROOF PLAN
A-204 - ENLARGED ELEVATIONS
A-205 - ENLARGED ELEVATIONS
A-206 - ENLARGED ELEVATIONS
A-207 - ENLARGED ELEVATIONS
A-208 - ENLARGED ELEVATIONS
A-209 - ENLARGED ELEVATIONS
A-410 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS - AREA D
A-422 - EXTERIOR SIGNAGE PLAN, ELEVATIONS, SECTIONS AND DETAILS
A-512 - COLUMN DETAILS
A-526 - MISCELLANEOUS DETAILS
A-601 - DOOR SCHEDULE
A-602 - DOOR SCHEDULE
A-603 - DOOR SCHEDULE AND DETAILS

File details come from the government source that posted it. Updated .