About this file

This document contains a federal contract opportunity notice and related file regarding furniture requirements for the DLA Aviation Operations Center, Phase II project. The Army Corps of Engineers will issue a request for proposal for construction of a 281,075 square foot, multi-story office building in Richmond, Virginia to accommodate 1,622 employees. The contract value is estimated between $25-100 million. The project scope includes administrative offices, conference rooms, restrooms, elevators, lighting, fire suppression, security, and furniture for open office plans and individual workstations. The solicitation number is W9123620R2005 and will be posted to SAM.gov on May 27, 2020. Offerors must be registered in SAM and the contract is to be awarded on a firm fixed price basis through a best value evaluation of past performance, project approach, small business participation, and price.

View the file

Other files

File Type Posted
W91236-20-R-2005 Amendment 4 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 73_DLA_OPS_PH II_A-119 - FOURTH FLOOR PLAN - AREA A4.pdf PDF
Attachment 66 _DLA_OPS_PH II_A-106 - FIRST FLOOR PLAN - AREA A1.pdf PDF
Attachment85_DLA_OPS_PH II_A-421 - ENLARGED METROLOGY LAB AND MYLAR ROOM PLAN.pdf PDF
Attachment91_DLA_OPS_PH II_A-602 - DOOR SCHEDULE.pdf PDF
Attachment95_DLA_OPS_PH II_A-703 - FINISH SCHEDULE.pdf PDF
Attachment 74_DLA_OPS_PH II_A-120 - FOURTH FLOOR PLAN - AREA D4.pdf PDF
Attachment 122 Spec-Drawing List 07-08-20.xlsx XLSX spreadsheet
Attachment129_DLA_OPS_PH II_321216 SPECIFICATIONS VOL2-Asphalt.pdf PDF
Attachment116_DLA_OPS_PH II_S-603 - COLUMN SCHEDULE.pdf PDF
Attachment80_DLA_OPS_PH II_A-206 - ENLARGED ELEVATIONS.pdf PDF
Attachment 71_DLA_OPS_PH II_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Attachment 69_DLA_OPS_PH II_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Attachment 127_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Page1.pdf PDF
Attachment105_DLA_OPS_PH II_S-118 - SECOND FLOOR FRAMING PLAN - AREA F.pdf PDF
Attachment 62_DLA OPS_PH II_V-101.pdf PDF
Attachment108_DLA_OPS_PH II_S-132 - STAIRWELL FRAMING PLANS - AREA D.pdf PDF
Attachment122_OpsCtrPhaseII_final_GeotechRpt_Sept2019.pdf PDF
Attachment94_DLA_OPS_PH II_A-702 - FINISH SCHEDULE.pdf PDF
Attachment 65_DLA_OPS_PH II_A-103 - OVERALL THIRD FLOOR PLAN.pdf PDF
Attachment89_DLA_OPS_PH II_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Attachment 58_DLA OPS_CU101-CU102.pdf PDF
Attachment102_DLA_OPS_PH II_S-104 - DRILLED PIER AND PIER CAP PLAN - AREA G.pdf PDF
Attachment124_DLA_OPS_PH II_087100 SPECIFICATIONS VOL1-Door Hardware.pdf PDF
Attachment109_DLA_OPS_PH II_S-133 - STAIRWELL AND ELEVATOR ROOF FRAMING PLANS - AREA D.pdf PDF
Attachment77_DLA_OPS_PH II_A-145 - PARTIAL LOW LEVEL ROOF PLAN.pdf PDF
Attachment82_DLA_OPS_PH II_A-208 - ENLARGED ELEVATIONS.pdf PDF
Final W91236-20-R-2005 Amendment 3 DLA Ops Center.pdf PDF
Attachment93_DLA_OPS_PH II_A-701 - FINISH SCHEDULE.pdf PDF
Attachment 59_DLA OPS_PH II_C-512.pdf PDF
Attachment90_DLA_OPS_PH II_A-601 - DOOR SCHEDULE.pdf PDF
Attachment117_DLA_OPS_PH II_S-604 - COLUMN SCHEDULE.pdf PDF
Attachment125_DLA_OPS_PH II_089100 SPECIFICATIONS VOL1-OMIT Metal Wall Louvers.pdf PDF
Attachment 61_DLA OPS_PH II_CS101.pdf PDF
Attachment81_DLA_OPS_PH II_A-207 - ENLARGED ELEVATIONS.pdf PDF
Attachment 68_DLA_OPS_PH II_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Attachment 72_DLA_OPS_PH II_A-118 - THIRD FLOOR PLAN - AREA D3.pdf PDF
Attachment123_DLA_OPS_PH II_084400 SPECIFICATIONS VOL1-Para1.5.6.pdf PDF
Attachment75_DLA_OPS_PH II_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Attachment113_DLA_OPS_PH II_S-312 - FRAMING SECTIONS.pdf PDF
Attachment120_DLA_OPS_PH II_T-704 - VOICE AND DATA BACKBONE DIAGRAM.pdf PDF
Attachment115_DLA_OPS_PH II_S-503 - TYPICAL DETAILS.pdf PDF
Attachment107_DLA_OPS_PH II_S-131 - STAIRWELL FRAMING PLANS - AREA A AND AREA G.pdf PDF
Attachment92_DLA_OPS_PH II_A-603 - DOOR SCHEDULE AND DETAILS.pdf PDF
Attachment101_DLA_OPS_PH II_S-101 - DRILLED PIER AND PIER CAP PLAN - AREA A.pdf PDF
Attachment79_DLA_OPS_PH II_A-205 - ENLARGED ELEVATIONS.pdf PDF
Attachment128_DLA_OPS_PH II_316329 SPECIFICATIONS VOL2-Part 2.3.2.pdf PDF
Attachment104_DLA_OPS_PH II_S-115 - ROOF FRAMING PLAN - AREA C.pdf PDF
Attachment 64_DLA OPS_PH II_V-103.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Code

Manufacturer A Haworth & Humanscale W1

Model Name/No. X-Series & Compose; Element Vision Light GSA Fed Stock Open Market

Generic Description

Name

Address

Phone

Email/Web

POC

Dimensions 96"W | 72"D | 65"H (Panels not included)

Finishes Metal Paint: Chalk TR-AK

Worksurface: Neowalnut H-KL

Main Fabric: Haworth - Tailored, Thread PY-TH

Accent Fabric: Haworth, Striae Moonlight

C1-AC

Image not exactly as specified

Content Number Room Name Quantity Unit Cost Total Cost

Finish See Item Installation List

Graphic

Abrasion Resistance

Warranty

Manufacturer B Knoll Dividends/Reff

Manufacturer C Herman Miller Canvas

1430 $3,594.06 $5,139,505.80

CARE / MAINTENANCE / LEED / WARRANTIES

Lifetime warranty.

PRODUCT TOTAL

Allison Harris, 757.333.2527

PRODUCT ILLUSTRATION(S)

FINISH ILLUSTRATION(S)

FABRIC TESTING LOCATION & QUANTITY

ALTERNATE MANUFACTURERS & PRODUCTS

www.haworth.com

WORKSTATION - STANDARD

Federal Supply Category

Height adjustable main worksurface 24x72

(electronically powered and programmable); Panel mounted 24x48 laminate return worksurface; 24x24

Storage tower with one side including a BBF and open bookcase on work surface side, full length wardrobe on opposite side; Metal mobile ped BF with cushion top, locking, integrated J-Pull. LED task light w/ a light output of 225 lumens and come with 7 settings for dimmability.

SIN # 711-18

GSA Contract Number GS-03F-057DA

Expiration Date 7-Feb-21

Max Order Limitation $500,000

GSA Contractor / Manufacturer

Haworth, Inc.

One Haworth Center, Holland MI, 49423-9576

616.393.3000

Product Item

DLA OPS PH II

Defense Supply Center Richmond, Virginia

Waller, Todd & Sadler | A Woolpert Company

RTA - FF&E Submittal

Item Code

W1

NOTES: All locks keyed alike in each cubicle; Review/select all finishes with customer to ensure proper coordination with actual building finishes.

NOTES:

42”H and 58”H segmented panels with the following:

• Performance upholstered tackable panels

• (2) 48”W x 42”H Panels

• (2) 36”W x 58”H Panels

• 2 fabric tiles per side on each 42”H panel – Accent fabric on upper tile: Grade “A”

• 3 fabric tiles per side on each 58” H panel – Accent fabric on the middle tile: Grade “A”

• Separated cable management within panel, min. 3 horizontal cable pathways with at least 1 being a lay-in cable management, 2 vertical pathways per frame, and be able to hold a min of 35 cat. 6 cables in the horizontal cable pathways

• 4 triplexes -(2) above the worksurface and (2) at the raceway

• 6 data ports - (3) above the worksurface and (3) at the raceway

• Steel Trim

• Closed Base

• 8” Metal raceway

Additional Information Item

WORKSTATION - STANDARD

DLA OPS PH II

Defense Supply Center Richmond, Virginia

Waller, Todd & Sadler | A Woolpert Company

RTA - FF&E Submittal

File details come from the government source that posted it. Updated .