This pre-solicitation notice provides details for an upcoming construction project for the Defense Logistics Agency Aviation Operations Center, Phase II in Richmond, Virginia. The project requirements include constructing a 281,075 square foot, multi-story office building to accommodate 1,622 employees in an administrative operations center. The facility will include open and private offices, support spaces, conference rooms, kitchens, restrooms, elevators, and building systems. The construction is valued between $25-100 million and will utilize conventional methods to accommodate the mission of the facility in compliance with DoD standards. The contract completion date will be 1020 calendar days after notice to proceed. The solicitation is expected to be issued on May 27, 2020 on beta.sam.gov for award of a firm-fixed price construction contract determined through a best value evaluation of past performance, project approach, small business participation, and price factors.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
1909 CYPRESS AVENUE
VIRGINIA BEACH, VA
23451
(757) 417 - 0140
C O
N T
R A
C T
N O
W
-1
-D
-0
01/10/2020
737103
S-002
G E
N E
R A
L N
O T
E S
D E
F E
N S
E
S
U P
P L Y
C E
N T
E R
R
IC
H M
O N
D
D S
C R
R
IC
H
M O
N D
V
IR
G
IN
IA
N O
R F
O L K
D
IS
T R
IC
T
F
R O
N T
S T
N
O R
F O
L K
V
A
W A
L L E
R T
O D
D
S A
D L E
R
A W
O O
L P
E R
T C
O M
P A
N Y
C
Y P
R E
S S
A V
E N
U E
V
IR
G
IN
IA
B
E A
C H
V
A
K B
F
J S
S
D S
R
M L M
J A
N U
A R
Y
D L A
O P
E R
A T
IO
N
S C
E N
T E
R
P H
-2
D E
F E
N S
E L
O G
IS
T
IC
S
A G
E N
C Y
A
V
IA
T
IO
N D
S C
R
SHALLOW FOUNDATION NOTES:
1. SHALLOW FOUNDATIONS FOR THIS STRUCTURE HAVE BEEN DESIGNED IN ACCORDANCE
WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL EXPLORATION REPORT, PREPARED
BY GEO-ENVIRONMENTAL SECTION OF THE U.S. ARMY CORPS OF ENGINEERS, NORFOLK
DISTRICT AND DATED JULY 2019.
2. PERFORM ALL EARTHWORK IN ACCORDANCE WITH THE RECOMMENDATIONS IN THE
GEOTECHNICAL ENGINEERING REPORT.
3. THE ONE STORY STRUCTURE WHERE INDICATED MUST BE FOUNDED ON VERY WELL
COMPACTED STRUCTURAL FILL OR UNDISTURBED SOIL WITH A DESIGN BEARING
PRESSURE OF 2,000 PSF
4. PRIOR TO PLACING FOUNDATION CONCRETE, ALL FOUNDATION EXCAVATIONS MUST BE
INSPECTED BY THE GEOTECHNICAL ENGINEER TO VERIFY THE EXTENT OF ANY LOOSE,
SOFT, OR UNSATISFACTORY SOIL AND TO VERIFY THE DESIGN BEARING PRESSURE. THE
GEOTECHNICAL ENGINEER WILL PROVIDE DIRECTION FOR CORRECTIVE ACTION WHERE
REQUIRED.
5. DO NOT INSTALL FOUNDATION WORK UNTIL IT HAS BEEN COORDINATED WITH ADJACENT
UNDERGROUND UTILITIES. FOOTINGS MUST BE SLEEVED OR LOWERED WHERE REQUIRED.
DO NOT INSTALL UTILITIES UNDER ISOLATED COLUMN FOOTINGS OR UNDERMINE
INSTALLED FOUNDATIONS. INSTALL UTILITIES PERPENDICULAR TO WALL FOOTINGS.
6. DO NOT PUT IN UNBALANCED BACKFILL AGAINST FOUNDATION WALLS UNLESS WALLS ARE
SECURELY BRACED AGAINST OVERTURNING.
7. BOTTOM OF EXTERIOR FOUNDATIONS MUST BEAR A MINIMUM OF 18” BELOW FINAL GRADE.
LOWER FOOTINGS AS REQUIRED TO MAINTAIN COVERAGE.
DEEP FOUNDATION - DRILLED PIER NOTES:
1. DRILLED PIER CONSTRUCTION MUST CONFORM TO THE REQUIREMENTS OF SECTIONS 1808
AND 1810 OF THE 2015 INTERNATIONAL BUILDING CODE.
2. DRILLED PIERS FOR THIS STRUCTURE HAVE BEEN DESIGNED IN ACCORDANCE WITH THE
RECOMMENDATIONS IN THE GEOTECHNICAL REPORT, PREPARED BY GEO-ENVIRONMENTAL
SECTION OF THE U.S. ARMY CORPS OF ENGINEERS, NORFOLK DISTRICT, AND DATED JULY
2019. REFER TO GEOTECHNICAL REPORT FOR PILE INSTALLATION PROCEDURES AND
OTHER DETAILS.
3. THE CONCRETE 28 DAY GROUT COMPRESSIVE STRENGTH MUST BE 5,000 PSI AND MUST
CONFORM TO THE REQUIREMENTS OF ACI-318.
4. REINFORCING MATERIALS MUST CONFORM TO ASTM A615, GRADE 60, DEFORMED.
5. DRILLED PIER DESIGN (30" AND 36" DIAMETER) IS BASED UPON THE ALLOWABLE
COMPRESSION CAPACITIES HAVING A FACTOR OF SAFETY OF 2.0.
6. DRILLED PIERS MUST HAVE A MINIMUM DIAMETER OF 30" AND 36" INCHES AND MUST
EXTEND BELOW GRADE AT INDICATED. REFER TO “TYPICAL DRILLED PIER DETAILS” FOR
ADDITIONAL INFORMATION.
7. DRILLED PIERS INDICATED ON PLAN MUST BE LOAD TESTED IN ACCORDANCE WITH ASTM
D1143, THE INTERNATIONAL BUILDING CODE, AND THE GEOTECHNICAL REPORT. TEST THE
PILES UNDER THE DIRECTION OF THE GEOTECHNICAL ENGINEER.
8. THE GEOTECHNICAL ENGINEER MUST OBSERVE ALL DRILLED PIER EXCAVATIONS TO
VERIFY SUFFICIENT DEPTH, DIAMETER, BEARING CONDITIONS, REINFORCEMENT, AND
CONCRETE PLACEMENT.
9. MACHINE CLEAN ALL PIER EXCAVATIONS. MAKE ADDITIONAL PASSES WITH DRILL RIG, AS
REQUIRED, AT THE GEOTECHNICAL ENGINEER’S DISCRETION. NO LOOSE MATERIAL SHALL
BE LEFT IN PLACE AT THE BOTTOM OF THE SHAFT EXCAVATION.
10. WAIT AS LEAST 24 HOURS BEFORE PLACING A NEW PIER WITHIN 10 FEET OF A PREVIOUSLY
PLACED PIER.
11. VIBRATE THE UPPER FIVE FEET OF CONCRETE TO ALLOW PROPER CONCRETE
CONSOLIDATION.
12. PROVIDE AN AS-INSTALLED PIER LAYOUT WITH ANY PIER LOCATION DISCREPANCY NOTED.
13. THE CONTRACTOR MUST HAVE PROPER EQUIPMENT TO REMOVE ANY OBSTRUCTIONS
DURING PIER INSTALLATION.
CAST IN PLACE CONCRETE NOTES:
1. CAST IN PLACE CONCRETE MUST COMPLY WITH THE AMERICAN CONCRETE INSTITUTE
(ACI- 318-14), COMMENTARY, (ACI-318R-14), AND THE SPECIFICATIONS FOR STRUCTURAL
CONCRETE (ACI 301).
2. DETAILING OF ALL CONCRETE STEEL REINFORCEMENT MUST BE IN ACCORDANCE WITH
THE MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE
STRUCTURES (ACI-315).
3. ALL CONCRETE MUST BE NORMAL WEIGHT, UNLESS OTHERWISE NOTED, CONCRETE
HAVING A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS AS FOLLOWS:
A. SLAB ON GRADE 4,000 PSI
B. WALLS 4,000 PSI
C. GRADE BEAMS 3,500 PSI
D. LOADING DOCK WALLS AND SLAB 5,000 PSI
E. CONCRETE NOT OTHERWISE NOTED 3,500 PSI
F. CONCRETE EXPOSED TO WEATHER AND FREEZE THAW CYCLES (WALLS AND
GRADEBEAMS ABOVE THE FROST LINE AT BUILDING PERIMETER) MUST BE AIR
ENTRAINED.
4. CONCRETE IN ELEVATED FLOOR SLABS AND ROOF SLABS MUST BE LIGHT WEIGHT
CONCRETE HAVING A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT THE AGE OF 28
DAYS. LIGHTWEIGHT CONCRETE MUST HAVE AN AIR-DRY UNIT WEIGHT PER ASTM C567
NOT LESS THAN 110 PCF AND NOT MORE THAN 115 PCF.
5. ALL REINFORCING MUST BE AS FOLLOWS:
REINFORCING BARS - ASTM A-615, GRADE 60 (UNLESS OTHERWISE NOTED)
WELDED WIRE FABRIC - ASTM A-1064 FLAT SHEET TYPE, ROLL TYPE NOT ACCEPTABLE.
6. WELDED WIRE FABRIC MUST BE PROPERLY SUPPORTED PRIOR TO PLACING CONCRETE.
HOOKING OF FABRIC IS NOT PERMITTED.
7. UNLESS OTHERWISE NOTED, REINFORCING STEEL MARKED CONTINUOUS (CONT.) MUST
BE LAPPED PER THE REINFORCING LAP SCHEDULE ON S-601.
8. HOLD ALL REINFORCING STEEL SECURELY IN PLACE TO PREVENT DISLOCATION DURING
THE POURING OPERATION. SUPPORT SLAB REINFORCING BARS ON HIGH CHAIRS AND BAR
SPACERS OF SUITABLE DESIGN, OR CONCRETE BLOCKS HAVING THE SAME MINIMUM
COMPRESSIVE STRENGTH OF THE CONCRETE SLAB.
9. DO NOT PLACE CONCRETE UNTIL ALL EMBEDDED WORK HAS BEEN INSTALLED, TESTED
AND INSPECTED.
10. EXCEPT AS OTHERWISE SHOWN MINIMUM PROTECTION (CONCRETE COVER) FOR
REINFORCING STEEL MUST BE AS FOLLOWS:
CONCRETE SURFACES CAST AGAINST SOIL: 3"
CONCRETE SURFACES EXPOSED TO EARTH OR WEATHER 1 1/2" FOR #5 BARS AND
SMALLER; 2” FOR #6 BARS AND LARGER
INTERIOR CONCRETE SURFACES: 3/4" FOR SLABS; 1-1/2” FOR BEAMS & COLUMNS
11. PROVIDE CONSTRUCTION JOINTS IN ACCORDANCE WITH ACI-318 AND ACI 224.3. PLACE
VERTICAL CONSTRUCTION JOINTS TO PROVIDE A MAXIMUM 50 FT LENGTH OF CONCRETE
PLACEMENT. JOINTS MUST BE LOCATED AS FOLLOWS:
FOUNDATION WALLS: MINIMUM 8 FEET FROM ANY WALL INTERSECTION OR END OF
WALL.
GRADE BEAMS, BEAMS AND STRUCTURAL SLAB: LOCATE AT CENTERLINE BETWEEN
SUPPORTS
12. POROUS FILL UNDER SLAB SHALL CONSIST OF CRUSHED STONE MEETING THE
GRADATION REQUIREMENTS OF VDOT #57 AGGREGATE. THE POROUS FILL MUST BE
COMPACTED WITH A MINIMUM OF TWO PASSES OF A HAND-OPERATED PLATE-TYPE
VIBRATORY COMPACTOR.
CONCRETE MASONRY NOTES:
1. MASONRY CONSTRUCTION MUST COMPLY WITH THE AMERICAN CONCRETE INSTITUTE
“BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES (ACI 530-13) AND “BUILDING
CODE REQUIREMENTS AND SPECIFICATIONS FOR MASONRY STRUCTURES” (ACI 530.1-13).
2. CONCRETE MASONRY UNITS MUST CONFORM TO ASTM C90 AND BE MADE WITH
LIGHTWEIGHT AGGREGATE. THE COMPRESSIVE STRENGTH OF MASONRY, F’m, EXPRESSED AS FORCE PER UNIT OF NET CROSS-SECTIONAL AREA, MUST BE 2,000 PSI AT
28 DAYS.
3. MORTAR MUST CONFORM TO ASTM C270, TYPE S OR M. AGGREGATE FOR MORTAR MUST
COMPLY WITH ASTM C144. TYPE M BELOW GRADE AND TYPE S ABOVE GRADE.
4. GROUT MUST CONFORM TO ASTM C476 AND MUST HAVE A MINIMUM 28 DAY COMPRESSIVE
STRENGTH OF 2,500 PSI. SLUMP AT POINT OF PLACEMENT MUST BE BETWEEN 8 AND 11
INCHES.
5. ALL REINFORCING BARS MUST BE DEFORMED BARS CONFORMING TO ASTM A615, GRADE
60. SHOP FABRICATE BARS SHOWN TO BE BENT OR HOOKED. BARS MUST BE LAPPED AS
FOLLOWS: #4-20", #5-30", #6-54", #7-63", #8-72", #9-81".
6. REBAR DOWELS MUST BE THE SAME SIZE AND SPACING AS VERTICAL REINFORCING FROM
FOUNDATION. DOWELS MUST HAVE STANDARD ACI HOOKS.
7. PROVIDE BAR POSITIONERS FOR VERTICAL REINFORCING AT A MAXIMUM SPACING OF 200
BAR DIAMETERS, AT GROUT LIFT HEIGHTS, OR BAR SPLICE LOCATIONS, WHICHEVER IS
LESS.
8. GROUTING MUST BE STOPPED 1-1/2" BELOW THE TOP OF A COURSE SO AS TO FORM A KEY
AT THE POUR JOINT.
9. ALL BOLTS, ANCHORS, ETC. PLACED IN THE WALL, MUST BE GROUTED SOLID INTO
POSITION.
10. GROUT ALL CELLS SOLID BELOW FINISHED FIRST FLOOR.
11. INSTALL HORIZONTAL JOINT REINFORCEMENT IN ALL MASONRY. HORIZONTAL JOINT
REINFORCING MUST BE STANDARD 9 GAGE LADDER TYPE IN CMU WALLS AT 16” ON-
CENTER. JOINT REINFORCING MUST COMPLY WITH ASTM A951.
12. DISCONTINUE ALL HORIZONTAL REINFORCING AT CONTROL JOINTS EXCEPT FOR BOND
BEAMS AT JOIST BEARING ELEVATIONS. HORIZONTAL BOND BEAMS MUST HAVE
CONTINUOUS REINFORCING AS SHOWN IN THE SECTIONS AND DETAILS. REFER TO DETAIL
A1/S-602.
13. PROVIDE 1/4" PREMOLDED JOINT FILLER CONTINUOUS AT SLAB FACE ABUTTING CMU
FOUNDATIONS.
14. EXCEPT WHERE CALLED FOR ON SECTIONS AND DETAILS, PROVIDE CONTINUOUS
HORIZONTAL BOND BEAMS AT 8'-0" OC (SPACED VERTICALLY), REINFORCED WITH 2 - #5
CONT IN ALL CMU WALLS.
POST-INSTALLED ANCHOR NOTES:
1. POST-INSTALLED ANCHORS MUST COMPLY WITH THE AMERICAN CONCRETE INSTITUTE
(ACI- 318-14). SUBMIT CALCULATIONS DEMONSTRATING THAT THE PRODUCT IS
CAPABLE OF ACHIEVING THE PERFORMANCE VALUES INDICATED IN THE DRAWINGS.
PRODUCT MUST HAVE AN ICC ESR SHOWING COMPLIANCE WITH THE RELEVANT
BUILDING CODE.
2. PROVIDE ANCHORS WITH A MINIMUM ALLOWABLE CAPACITY AS INDICATED. THE
CAPACITIES ARE BASED ON COMBINED SHEAR AND TENSION LOADING:
3. ANCHOR CAPACITY IS DEPENDENT ON SPACING BETWEEN ADJACENT ANCHORS AND
EDGE DISTANCE. INSTALL ANCHORS IN ACCORDANCE WITH SPACING AND EDGE
DISTANCES INDICATED IN THE DRAWINGS.
4. INSTALL ANCHORS PER THE MANUFACTURER INSTRUCTIONS, AS INCLUDED IN THE
ANCHOR PACKAGING.
5. DRILL CORRECT HOLE SIZES FOR MECHANICAL ANCHORS WITH CARBIDE-TIPPED DRILL
BITS MEETING THE DIAMETER REQUIREMENTS OF ANSI B212.15.
6. DRILL HOLES WITH A HAMMER DRILL UNLESS OTHERWISE NOTED.
7. DO NOT DISTURB OR APPLY LOAD TO ADHESIVE ANCHORS PRIOR TO FULL CURE OF
THE ADHESIVE.
8. ADHESIVE ANCHOR SUBJECT TO SUSTAINED TENSION LOADS MUST BE INSTALLED BY A
PERSON CERTIFIED BY AN APPLICABLE CERTIFICATION PROGRAM. CERTIFICATION
MUST INCLUDE WRITTEN AND PERFORMANCE TESTS IN ACCORDANCE WITH ACI/CRSI
ADHESIVE ANCHOR INSTALLER CERTIFICATION PROGRAM. SUBMIT INSTALLER
CERTIFICATION PRIOR TO INSTALLATION.
9. ADHESIVE ANCHORS MUST BE INSTALLED IN CONCRETE HAVING A MINIMUM AGE OF 21
DAYS AT TIME OF ANCHOR INSTALLATION.
10. FOR ADHESIVE ANCHOR WITH SUSTAINED TENSION LOADS, INSTALLATION MUST BE
CONTINUOUSLY INSPECTED BY A SPECIAL INSPECTOR SPECIALLY APPROVED FOR
THAT PURPOSE BY THE ACI/CRSI. SUBMIT INSPECTOR CERTIFICATION PRIOR TO
INSTALLATION. THE SPECIAL INSPECTOR MUST FURNISH A REPORT THAT THE WORK
COVERED IN THE REPORT HAS BEEN PERFORMED AND THAT THE MATERIALS USED
AND THE INSTALLATION PROCEDURES CONFORM TO THE APPROVED CONTRACT
DOCUMENTS AND THE MANUFACTURERS PRINTED INSTALLATIONS.
A
M E
N D
M E
N T
N O
J U
L Y
File details come from the government source that posted it. Updated .