ATTACHMENT 01 PRICING SCHEDULE.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
FY 2026 ICIDS MAINTENANCE MONITORING AND REPAIR
Solicitation number
W911S826RA017
Issued by

About this file

This is a Pricing Schedule attachment for a five-year maintenance and monitoring services contract for the Integrated Commercial Intrusion Detection System V (ICIDS V) at multiple military installations. The contract runs from September 1, 2026, through August 31, 2031, consisting of a base year plus four option years, with each contract line item number (CLIN) covering a 12-month period.

The contract encompasses four primary service categories repeated across each year: Monitor, Maintenance, Repair and Travel (MMR&T); Materials Replenishment for spare parts inventory, tools, and instruments; Unscheduled Maintenance and Repair for after-hours system failures; and Survey services. Services are to be provided at six locations: JBLM-Main, JBLM-North, JBLM McChord Field, Yakima Training Center (YTC), Madigan Army Medical Center (MAMC), and Camp Murray (CM). The pricing schedule template contains all line items with quantities and units of measure defined (12 Months for labor-intensive CLINs and Job units for surveys), but all price fields are currently blank with zero dollar amounts, indicating this is a template awaiting contractor pricing input. The solicitation is being administered by the Department of the Army Materiel Command Mission and Installation Contracting Command at Joint Base Lewis-McChord.

View the file

Other files

File Type Posted
TE-V -Preventative Maintenance Schedule.xlsx XLSX spreadsheet
Solicitation Amendment W911S826RA0170002 SF 30.pdf PDF
TE-U - ICIDS and CCTV Master spreadsheet (SANITIZED).xlsx XLSX spreadsheet
ICIDS PERFORMANCE WORK STATEMENT 11AUG26.pdf PDF
Solicitation W911S826RA017 Questions.pdf PDF
ICIDS PERFORMANCE WORK STATEMENT 29 JULY 2026.pdf PDF
Solicitation Amendment W911S826RA0170001 SF 30 (2026-08-06).pdf PDF
ICIDS PWS 2026-07-16.pdf PDF
TE-G-ICIDS COMMS - ICIDS Failure Reports.pdf PDF
TE-Q -Activation Worksheet.pdf PDF
TE-T - New ICIDS Account Acvtivation Request.pdf PDF
TE-M-CCTV Performance Verification Test (PVT) - 2021.pdf PDF
TE-D - Alarm Test Log.pdf PDF
TE-H - ICIDS PIN User Agreement.pdf PDF
TE-U - ICIDS and CCTV Master spreadsheet 01AUG2025.xlsx XLSX spreadsheet
TE-P-ICIDS CCTV Addition Removal Request.pdf PDF
TE-N-QUALITY CONTROL CHECK SHEET - 2021.pdf PDF
TE-E- Contract Service Order.pdf PDF
Solicitation - W911S826RA017.pdf PDF
TE-R -Deactivation Worksheet.pdf PDF
TE-J - Labor Materials and Travel Estimate (LMT).pdf PDF
TE-B - ICIDS-DailyAlarmEventLog_example - 2021.pdf PDF
TE-A - ICIDS CCTV-GBR SOP.pdf PDF
TE-K - MCA-ICIDS V-MaterialOrder.pdf PDF
TE-C - Open Accounts Report example - 2021.pdf PDF
TE-S - ICIDS Accounts Map.pdf PDF
TE-F-FieldReport w-CSO.pdf PDF
TE-L - IDS PerformanceVerificationTest (PVT) - 2021.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRICING SCHEDULE
CLINCLIN DESRIPTIONPOP STARTPOP ENDQNTYUNIT OF ISSUEPRICETOTAL
0001Monitor, Maintenance, Repair and Travel
Contractor shall perform Monitoring, Maintenance, Repair, and Travel (MMR&T) to all specified locations listed in the PWS to perform necessary maintenance, repairs, and surveys. See PWS Para 16.0 - 20.09/1/20268/31/202712Months$ - 0
0002Materials Replenishment
Contractor shall maintain a spare parts inventory, tools and instruments. Spare parts inventory materials are available for issue and use to all technicians for repairs necessary to allow timely maintenance, repair and troubleshooting of the systems IAW PWS 17.0. Spare parts shall be made as readily available as possible to reduce down time and aid in expediting repair efforts, especially unscheduled repair9/1/20268/31/202712Months$ - 0
0003Unscheduled Maint & Repair
The contractor shall provide all necessary elements to respond to after -hours failures in order to maintain all ICIDS system accounts and equipment in a 100% operational state, see PWS para 18.0.9/1/20268/31/202712Months$ - 0
0004Survey
Contractor shall perform surveys IAW PWS para 19.09/1/20268/31/202712Job$ - 0
1001Monitor, Maintenance, Repair and Travel
Contractor shall perform Monitoring, Maintenance, Repair, and Travel (MMR&T) to all specified locations listed in the PWS to perform necessary maintenance, repairs, and surveys. See PWS Para 16.0 - 20.09/1/20278/31/202812Months$ - 0
1002Materials Replenishment
Contractor shall maintain a spare parts inventory, tools and instruments spare parts inventory material are available for issue and use to all repair necessary to allow for timely maintenance, repair and trroubleshooting of the system IAW PWS 17.0. Spare parts shall be made as readily available as possible to reduce down time and aid in expediting repair efforts, especially unscheduled repair9/1/20278/31/202812Months$ - 0
1003Unscheduled Maint & Repair
The contractor shall provide all necessary elements to respond to after -hours failures in order to maintain all ICIDS system accounts and equipment in a 100% operational state, see PWS para 18.0.9/1/20278/31/202812Months$ - 0
1004Survey
Contractor shall perform surveys IAW PWS para 19.09/1/20278/31/202812Job$ - 0
2001Monitor, Maintenance, Repair and Travel
Contractor shall perform Monitoring, Maintenance, Repair, and Travel (MMR&T) to all specified locations listed in the PWS to perform necessary maintenance, repairs, and surveys. See PWS Para 16.0 - 20.09/1/20288/31/202912Months$ - 0
2002Materials Replenishment
Contractor shall maintain a spare parts inventory, tools and instruments. Spare parts inventory materials are available for issue and use to all technicians for repairs necessary to allow timely maintenance, repair and troubleshooting of the systems IAW PWS 17.0. Spare parts shall be made as readily available as possible to reduce down time and aid in expediting repair efforts, especially unscheduled repair9/1/20288/31/202912Months$ - 0
2003Contractor shall perform Monitoring, Maintenance, Repair, and Travel (MMR&T) to all specified locations listed in the PWS to perform necessary maintenance, repairs, and surveys. See PWS Para 16.0 - 20.09/1/20288/31/202912Months$ - 0
2004Survey
Contractor shall perform surveys IAW PWS para 19.09/1/20288/31/202912Job$ - 0
3001Monitor, Maintenance, Repair and Travel
Contractor shall perform Monitoring, Maintenance, Repair, and Travel (MMR&T) to all specified locations listed in the PWS to perform necessary maintenance, repairs, and surveys. See PWS Para 16.0 - 20.09/1/20298/31/203012Months$ - 0
3002Materials Replenishment
Contractor shall maintain a spare parts inventory, tools and instruments. Spare parts inventory materials are available for issue and use to all technicians for repairs necessary to allow timely maintenance, repair and troubleshooting of the systems IAW PWS 17.0. Spare parts shall be made as readily available as possible to reduce down time and aid in expediting repair efforts, especially unscheduled repairs.9/1/20298/31/203012Months$ - 0
3003Unscheduled Maint & Repair
The contractor shall provide all necessary elements to respond to after -hours failures in order to maintain all ICIDS system accounts and equipment in a 100% operational state, see PWS para 18.0.9/1/20298/31/203012Months$ - 0
3004Survey
Contractor shall perform surveys IAW PWS para 19.09/1/20298/31/203012Job$ - 0
4001Monitor, Maintenance, Repair and Travel
Contractor shall perform Monitoring, Maintenance, Repair, and Travel (MMR&T) to all specified locations listed in the PWS to perform necessary maintenance, repairs, and surveys. See PWS Para 16.0 - 20.09/1/20308/31/203112Months$ - 0
4002Materials Replenishment
Contractor shall maintain a spare parts inventory, tools and instruments. Spare parts inventory materials are available for issue and use to all technicians for repairs necessary to allow timely maintenance, repair and troubleshooting of the systems IAW PWS 17.0. Spare parts shall be made as readily available as possible to reduce down time and aid in expediting repair efforts, especially unscheduled repairs.9/1/20308/31/203112Months$ - 0
4003Unscheduled Maint & Repair
The contractor shall provide all necessary elements to respond to after -hours failures in order to maintain all ICIDS system accounts and equipment in a 100% operational state, see PWS para 18.0.9/1/20308/31/203112Months$ - 0
4004Survey

Contractor shall perform surveys IAW PWS para 19.0 9/1/2030 8/31/2031 12 Job $ - 0

BASE YEAR$ - 0% INCREASE
OPTION YEAR 1$ - 0ERROR:#DIV/0!
OPTION YEAR 2$ - 0ERROR:#DIV/0!
OPTION YEAR 3$ - 0ERROR:#DIV/0!
OPTION YEAR 4$ - 0ERROR:#DIV/0!
TOTAL PROPOSED AMOUNT$ - 0

RFO FAR 52.217-8 EXTENSION EVALUATED AMOUNT $ - 0

File details come from the government source that posted it. Updated .