This document contains performance verification test procedures for the Integrated Perimeter Intrusion Detection System (ICIDS) IV, which comprises two main components: the Remote Area Data Collection (RADC) system and the Integrated Access Control (IAC) Local Controller.

The RADC performance verification procedures involve 25 sequential tests designed to validate system functionality, including verification of online status, tamper detection, AC power failure response, alarm point testing, duress alarm capability, keypad violation detection, line supervision for sensors, network/data connection monitoring, and restoration of normal operating conditions. Critical timeframes specified include 5-10 minutes for AC failure detection, 15 seconds for SCIF system arming, and 30 seconds for Arms Room system arming. The IAC Local Controller procedures consist of 18 tests covering similar verification elements applicable to access control, including portal cabinet tamper detection, card reader functionality testing with both valid and invalid credentials, duress PIN entry verification, and network connectivity monitoring. Both test procedures require documentation of specific timing events, real-time monitoring station verification of alarm states, and production of alarm activity reports. The document includes a signature page requiring approval from contractor personnel (Prime/Project Manager, Testing Director, Testing Technician) and Government Representatives (USACE, DES, UNIT), with space for comments regarding corrective actions or additional resolutions needed. Each test step permits responses of Yes/No/Not Applicable to indicate successful completion.

View the file

Other files

File Type Posted
TE-V -Preventative Maintenance Schedule.xlsx XLSX spreadsheet
Solicitation Amendment W911S826RA0170002 SF 30.pdf PDF
TE-U - ICIDS and CCTV Master spreadsheet (SANITIZED).xlsx XLSX spreadsheet
ICIDS PERFORMANCE WORK STATEMENT 11AUG26.pdf PDF
ATTACHMENT 01 PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation W911S826RA017 Questions.pdf PDF
ICIDS PERFORMANCE WORK STATEMENT 29 JULY 2026.pdf PDF
Solicitation Amendment W911S826RA0170001 SF 30 (2026-08-06).pdf PDF
ICIDS PWS 2026-07-16.pdf PDF
TE-G-ICIDS COMMS - ICIDS Failure Reports.pdf PDF
TE-Q -Activation Worksheet.pdf PDF
TE-T - New ICIDS Account Acvtivation Request.pdf PDF
TE-M-CCTV Performance Verification Test (PVT) - 2021.pdf PDF
TE-D - Alarm Test Log.pdf PDF
TE-H - ICIDS PIN User Agreement.pdf PDF
TE-U - ICIDS and CCTV Master spreadsheet 01AUG2025.xlsx XLSX spreadsheet
TE-P-ICIDS CCTV Addition Removal Request.pdf PDF
TE-N-QUALITY CONTROL CHECK SHEET - 2021.pdf PDF
TE-E- Contract Service Order.pdf PDF
Solicitation - W911S826RA017.pdf PDF
TE-R -Deactivation Worksheet.pdf PDF
TE-J - Labor Materials and Travel Estimate (LMT).pdf PDF
TE-B - ICIDS-DailyAlarmEventLog_example - 2021.pdf PDF
TE-A - ICIDS CCTV-GBR SOP.pdf PDF
TE-K - MCA-ICIDS V-MaterialOrder.pdf PDF
TE-C - Open Accounts Report example - 2021.pdf PDF
TE-S - ICIDS Accounts Map.pdf PDF
TE-F-FieldReport w-CSO.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ICIDS IV RADC

Performance Verification Test Procedures

ICIDS Account# _______________________ Project # _______________________ Date/Time: _______________________ Testing Technician _______________________ Building/Room: _______________________ Panel/Circuit Breaker: _______________________ IP Address/Comm Port: _______________________ Port/Switch: _______________________ Zone Type: _______________________ Install Date: _______________________ Batt Install Date: _______________________

1. Ensure IDS system shows “ONLINE” at monitor station and that no alarms exist for Zone.

2. Start with the IDS system in “ACCESS” mode, testers inside the alarmed area and all doors/sensors are in a normal state.

3. Open Panel Enclosure(s): verify tamper alarm(s) at monitor station Y/N NA

4. Move tamper switch to maintenance position: verify tamper return at monitor station Y/N NA

5. Disconnect AC Power: verify “AC FAIL” at monitoring station. This will generally take 5-10 minutes. If testing IAC as well, disconnect AC Power from Local Controller. Panel will now run on battery backup for the remainder of the test.

Time Power Disconnected:___________ Time Alarm Received at monitor station:__________ Y/N NA

6. Place 24/7 alarm points into alarm: Duress/ BMS / Motion: verify alarm at monitor station (verify on schematic located in panel) Y/N NA

7. Verify monitor station cannot clear alarms until the device(s) return to a “Normal” state Y/N NA

8. Place 24/7 alarm points back into a “Normal” state: verify monitor station can clear alarms Y/N NA

NOTE: The zone is now considered “NOT SECURE” and will begin to report alarms until the zone is armed and disarmed again

9. Arm the IDS system with Duress: Input PIC code, hit enter/ Input PIN code plus 1, hit enter (remote star pad will be the “F1” key) this will send the Duress Alarm immediately. Verify “DURESS” at monitor station Y/N NA

10. Verify Panel is set to “SECURE”: verify secure mode at monitor station Y/N NA

11. Have the Alarm Monitor force open the IDS system: (will only work on Arms Rooms/ADNs/Comms Rooms) Verify panel is set to “ACCESS” at monitor station Y/N NA

12. Enter incorrect PIC/PIN: verify “KEYPAD VIOLATION” at monitor station Y/N NA

13. Disconnect ALL sensor points on RADC, in order for Line Supervision Open/Short: verify “TAMPER(S)” on each point at the monitor station Y/N NA

14. Connect ALL sensor points back in order: verify “NORMAL” on each point at the monitor station Y/N NA

15. Verify monitor can now clear the alarm(s): Y/N NA

16. Remove cover(s) and/or tamper magnet(s) from device(s)/junction box: verify each tamper: BMS, PIMS, Power

Supply, Junction Box. Verify “TAMPER” at monitor station Y/N NA

17. Replace cover(s) and/or tamper magnet(s) from device(s)/junction box: verify “NORMAL” at monitor station Y/N NA

Arm the IDS System: Input PIC/PIN: Input PIC code, hit enter/ Input PIN code, hit enter. (remote star pad will be the “F1” key) wait 15 seconds for SCIF, 30 seconds for Arms Room for system to arm Y/N NA

18. Test each alarm point in order: verify “ALARM” at monitor station Y/N NA

19. Set each device back into a “NORMAL” state: verify “NORMAL” at monitor station Y/N NA

20. Disarm the IDS System: Input PIC/PIN: (star pad will be the “F1” key): Y/N NA

21. Disconnect Network/Data Connection: verify “COMMS FAIL” at monitor station. This will generally take

5-10 minutes. Time Network/Data Disconnected: __________ Time Alarm Received at monitor station:______ __ Y/N NA

22. Restore Network/Data Connection: verify “ONLINE” at monitor station ____________________________ Y/N NA

23. Restore AC Power: verify “AC POWER NORMAL” at monitor station ______________ ___________________Y/N NA

24. Verify ALL points in the Zone have returned to its recommended state: verify “NORMAL” “AC POWER NORMAL”

“ONLINE” “ACCESS” at monitor station Y/N NA

25. Have the monitor station print Alarm Activity Report for the duration of the test Y/N NA

ICIDS IV IAC Local Controller

1. Ensure IDS Portal being tested shows “Access” at monitor station under Access Points

2. Open Panel Enclosure(s): verify portal cabinet tamper alarm(s) at monitor station Y/N NA

3. Move tamper switch to maintenance position: verify tamper return at monitor station Y/N NA

4. Disconnect AC Power from Local Controller(s): verify “AC FAIL” at monitoring station

Time Power Disconnected: __________ Time Alarm Received at monitor station: ___________ Y/N NA NOTE: The Local Controller AC Fail Indicator Light is steady red and the local Controller is still online. This will generally take 2-6 minutes to show at the monitor desk. Panel will now run on battery backup for the remainder of the test

5. Remove screw from card reader and gradually remove: verify tamper alarm(s) at monitor station Y/N NA

6. Secure card reader remove during test: verify tamper return at monitor station Y/N NA

7. Swipe the invalid (non-enrolled) test card on the reader: verify “Unregistered ID” in alarms at the monitor station Y/N NA

NOTE: a four-second audible notification is heard from the reader, the LED bar at the top of the reader is illuminated red and the strike or maglock is not released

8. Swipe the valid (enrolled) test card on the reader and put in the 4 digit pin (if equipped with keypad): verify

“Granted Access” or “Valid Access” in card watch at the monitor station Y/N NA NOTE: the led bar on top of the reader is illuminated green and the strike or maglock is released, a red led above the door strike block will illuminate red for a short period

9. Swipe the valid (enrolled) test card on the reader again and put in the 4 digit pin plus 1 (if equipped with keypad):

verify “DURESS” at the monitor station Y/N NA

10. Disconnect sensor points on Controller for Line Supervision Open/Short: verify “TAMPER(S)” on each point at the monitor station Y/N NA

11. Use the exit device correctly for the local controller: the strike or maglock is released Y/N NA

12. Remove the Comms Cable (Port 1) from the Local Controller: verify “Node Failure” at monitor station. This will generally take 5-10 minutes Time Network/Data Disconnected: _________ Time Alarm Received at monitor station:________ Y/N NA

13. Restore Network/Data Connection: verify :NORMAL” at monitor station Y/N NA

14. Restore AC Power to Local Controller: verify “AC POWER NORMAL” at monitor station Y/N NA

15. Verify ALL points on the Local Controller have returned to its recommended state: verify “NORMAL” “AC POWER

NORMAL” “ONLINE” “ACCESS” at monitor station Y/N NA

16. Have the monitor station print Alarm Activity Report for the duration of the test Y/N NA

17. Verify if any other alarms not on this test appeared at the monitor station: Y/N NA

18. Comments:_____________________________________________________________________________________

ICIDS IV Signature Page

Contractor Approval

Your signature indicates that you have completed the ESS Test conducted with the Government Representative mentioned below, and the performance of the ESS and associated peripherals.

Company Role Printed Name Signature Date

(mm-dd-yyyy)

Prime/Project Manager

Testing Director

Testing Technician

Alarm Monitor Not Required

Government Representative

Your signatures indicate that you have conducted and participated in the ESS Test as the Government Representative(s) for the performance of the ESS and associated peripherals and have provided your comments/listing for additional corrective action/resolution.

Company Role Printed Name Signature Date

(mm-dd-yyyy)

USACE

DES

UNIT

Comments:_____________________________________________________________________________________