TE-M-CCTV Performance Verification Test (PVT) - 2021.pdf

PDF 1 MB Posted

Attached to
FY 2026 ICIDS MAINTENANCE MONITORING AND REPAIR
Solicitation number
W911S826RA017
Issued by

About this file

This is a CCTV System Inspection Checklist used for quality assurance and acceptance testing of closed-circuit television installations. The document is organized into four primary inspection categories with Yes/No compliance checkboxes.

The CCTV Headend section verifies proper camera labeling, picture quality in day and night modes, alarm point configuration, correct camera angles and views without obstructions, and secure mounting that resists wind or other disturbances. The CCTV Location section confirms hardware and component fastening, weather-tight outdoor equipment and fittings, proper local camera function, appropriate camera positioning to prevent tampering, secure conduit and fitting anchoring, and appropriate enclosure heating and dome tint specifications for pan-tilt-zoom (PTZ) equipment. The CCTV Submittals section requires documentation including project narrative, recommended spare parts lists, equipment inventory with location and serial numbers, supplier and contractor contact information, camera naming schemes and settings, camera and software presets, alarm presets, DVR recording storage capacity specifications, software user level restrictions, password protection implementation, and system drawings and block diagrams. The Training section confirms that facility managers have received instruction on system operation and maintenance. The checklist includes a Comments/Problems section for documenting issues and signature lines for the PS Inspector, Sub Contractor, Project Manager, and Prime Contractor Representative, indicating multi-party accountability for system acceptance.

View the file

Other files

File Type Posted
TE-V -Preventative Maintenance Schedule.xlsx XLSX spreadsheet
Solicitation Amendment W911S826RA0170002 SF 30.pdf PDF
TE-U - ICIDS and CCTV Master spreadsheet (SANITIZED).xlsx XLSX spreadsheet
ICIDS PERFORMANCE WORK STATEMENT 11AUG26.pdf PDF
ATTACHMENT 01 PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation W911S826RA017 Questions.pdf PDF
ICIDS PERFORMANCE WORK STATEMENT 29 JULY 2026.pdf PDF
Solicitation Amendment W911S826RA0170001 SF 30 (2026-08-06).pdf PDF
ICIDS PWS 2026-07-16.pdf PDF
TE-G-ICIDS COMMS - ICIDS Failure Reports.pdf PDF
TE-Q -Activation Worksheet.pdf PDF
TE-T - New ICIDS Account Acvtivation Request.pdf PDF
TE-D - Alarm Test Log.pdf PDF
TE-H - ICIDS PIN User Agreement.pdf PDF
TE-U - ICIDS and CCTV Master spreadsheet 01AUG2025.xlsx XLSX spreadsheet
TE-P-ICIDS CCTV Addition Removal Request.pdf PDF
TE-N-QUALITY CONTROL CHECK SHEET - 2021.pdf PDF
TE-E- Contract Service Order.pdf PDF
Solicitation - W911S826RA017.pdf PDF
TE-R -Deactivation Worksheet.pdf PDF
TE-J - Labor Materials and Travel Estimate (LMT).pdf PDF
TE-B - ICIDS-DailyAlarmEventLog_example - 2021.pdf PDF
TE-A - ICIDS CCTV-GBR SOP.pdf PDF
TE-K - MCA-ICIDS V-MaterialOrder.pdf PDF
TE-C - Open Accounts Report example - 2021.pdf PDF
TE-S - ICIDS Accounts Map.pdf PDF
TE-F-FieldReport w-CSO.pdf PDF
TE-L - IDS PerformanceVerificationTest (PVT) - 2021.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CCTV - Headend: Com Switch Location:

Cameras Labeled Y N

Camera picture quality (Day & Night) Y N

Camera Alarm Points Set Y N

Camera angle and view as designed w/ no obstructions Y N

Camera mounts anchored tight (Not impacted by wind or other means) Y N

2. CCTV - Location: Com Switch Location:

Hardware and components securely fastened and tight Y N

Outdoor applications – Equipment & Fittings weather tight Y N

Camera components function correctly (Locally) Y N

Camera angle and view as designed w/ no obstructions Y N

Camera mount sufficient and anchored correctly Y N

Housing/Enclosure has heater Y N

For PTZ, dome tint is clear / smoked

Conduit and fittings secured and anchored Y N

Camera location is sufficient to prevent tampering Y N

Other Y N

Other Y N

3. CCTV Submittals:

Project narrative page Y N

Recommended spare parts list Y N

Equipment in place (location, component description, mod/ser#) Y N

Equipment suppliers contact information Y N

Contractor contact information Y N

Camera naming scheme & Settings Updated Y N

Camera and software pre-sets Y N

Alarm pre-sets Y N

DVR recording storage capacity (Note Size and storage retrieval Time) Y N

Software user level/restriction set Y N

Password protection (if required) Y N

Drawings & Block Diagrams Y N

Other Y N

4. Training:

Facility manager trained on the system operation & maintenance Y N

Comments/Problems:______________________________________________________________________

PS Inspector:___________Print(PSS)_________________________Sign________________________________

Sub Contractor:_________Print(Sub)_________ ______________Sign_________________________________

Project Manager:_______ Print (USACE)______________________Sign_____________________________________

Contractor Rep:_________ Print(PrimeContractor)_______________Sign________________________________