Q&A_(addendum).pdf
PDF 34 KB Posted
- Attached to
- MATOC Federal contract opportunity
- Solicitation number
- W911S7-19-R-0008
About this file
This document contains questions and answers regarding a construction project at Building 844 at Fort Leonard Wood, Missouri. There is no existing chiller at the building, so the contractor shall include a new chiller in their design for the 4 pipe HVAC system. While additional lightning protection is not required, the contractor must perform a lightning risk analysis and may propose adding new lightning protection if proven necessary through the analysis.
The related federal contract opportunity is a Multiple Award Task Order Contract solicitation to be issued by the Mission and Installation Contracting Command - Fort Leonard Wood. The solicitation number is W911S7-19-R-0008 and will be posted on January 3rd, 2019, with quotes due February 4th, 2019. The NAICS code is 236220 with a small business size standard of $36.5M. The PSC is Y1AA for construction of office buildings. The place of performance is Fort Leonard Wood and Lake of the Ozarks Recreational Area in Missouri. This will be a total small business set-aside multiple award firm fixed price IDIQ contract for construction requirements.
Q&A (addendum)
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q. How do we bid “Evaluate existing chiller for condition, age and possible incorporation into the new 4‐ pipe HVAC system.”
A: There is NO existing chiller at bldg. 844. Contractor shall include in their design a chiller complete for the HVAC system.
Q. How do we bid “Perform a lightning risk analysis. And Lightning protection if required”?
A: Additional lightning protection is not required for the project. The Contractor shall perform a lightning risk analysis. If the Contractor proves that additional lightning protection is required, a modification to the project will be allowed to pay for a new lightning protection complete.