This Engineering and Construction Bulletin provides new requirements for mass notification systems in U.S. Army and Air Force facilities. It requires that new mass notification systems use clear or white strobes marked with the word "ALERT" instead of amber strobes. Systems must also include light-emitting diode text signs. The Bulletin applies to new construction and rehabilitation projects, and updates Unified Facilities Criteria 4-021-01 accordingly.
The related federal contract opportunity is a solicitation for a Multiple Award Task Order Contract for construction requirements at Fort Leonard Wood, Missouri and the Lake of the Ozarks Recreational Area. The North American Industry Classification System code is 236220 and the small business size standard is $36.5 million. The Product Service Code is Y1AA for construction of office buildings. The solicitation number is W911S7-19-R-0008 and quotes are due on February 4, 2019. The contract will be set aside for total small businesses and involve firm fixed price indefinite delivery/indefinite quantity orders.
ecb 2018-17
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING AND
CONSTRUCTION BULLETIN
No. 2018-17 Issuing Office: CECW-EC Issued: 25 Oct 18 Expires: 25 Oct 20
SUBJECT: New Requirements for Visual Notification for Mass Notification Systems
CATEGORY: Directive and Policy
1. References:
a. Unified Facilities Criteria (UFC) 4-021-01 Change 1, DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, January 2010
2. Purpose. This directive provides new requirements for mass notification systems.
3. Applicability. This applies to new mass notification systems for new construction and rehabilitation projects for U.S. Army facilities. This also applies to new mass notification systems for new construction and rehabilitation projects for U.S. Air Force facilities when the U.S. Army Corps of Engineers is the design and construction agent. This ECB has been approved for U.S. Air Force facilities by the USAF AHJ office (AFCEC/CO), and applies unless otherwise directed by
AFCEC/CO.
4. Background. UFC 4-021-01, Design and O&M: Mass Notification Systems, requires Army and Air Force facilities to use amber strobes at all locations inside the facility as the visible signal to alert occupants with hearing disabilities about non-fire related emergency situations. These amber strobes are activated in conjunction with the delivery of pre-recorded or live voice messages over the mass notification system. The amber strobes are provided at the same locations as would be required for fire alarm clear strobes.
5. Directive.
a. Amber strobes must no longer be used in new mass notification systems. In lieu of amber strobes, clear or white strobes marked with the word “ALERT” must be used for new mass notification systems. Clear or white strobes must be provided for shared use by the facility’s combination mass notification and fire alarm system. The clear or white strobes are activated in conjunction with voice messages over the mass notification or fire alarm system.
b. Light-emitting diode (LED)-type text signs must be installed for the new mass notification system, and the fire alarm system (if present). These text signs are activated in conjunction with voice messages over the mass notification or fire alarm system.
c. Comply with the following changes to UFC 4-021-01:
(1) Add the text “Army and Air Force” to the beginning of the first sentence in
Section 4-3.4.2.1.
ECB No. 2018-17 Subject New Requirements for Visual Notification for Mass Notification Systems
(2) Delete the Section 4-3.4.2.2, “Army and Air Force installations shall, ...”
(3) Add the text “Army, Air Force and” to the fourth bulleted item under Section 4-4.2.
(4) Delete the sixth bulleted item under Section 4-4.2, “Army and Air Force, …”
(5) Add the text “Army, Air Force, and” to the title of Section 4-6.2.1.
(6) Delete Section 4-6.2.3, Army- and Air Force-Specific Requirements
(7) Add the text “, Army and Air Force” to the beginning of the first sentence in Section
5-4.4.2.2.
(8) Delete Section 5-4.4.2.1, “Army and Air Force installation shall, …”
(9) Add the text “Army, and Air Force” to the fourth bulleted item under Section 5-5.2.
(10) Delete the sixth bulleted item under Section 5-5.2, “Army and Air Force ...”
(11) Add the text “Army, Air Force, and” to the title of Section 5-7.2.1.
(12) Delete section 5-7.2.3, Army- and Air Force-Specific Requirements
(13) Delete the third sentence in Section 7-3.4, “The Army and Air Force use...”
(14) Add the text “Army, Air Force, and” to the fourth and sixth sentences in Section 7-3.4.
(15) Add the text “Army, Air Force, and” to the title and display callout in Figure 4-1 and delete Figure 4-2, “Individual Building Mass... (Army and Air Force)”
(16) Add the text “Army, Air Force and” to the title of Figure 5-1 and delete Figure 5-2, “Individual Building Mass... (Army and Air Force)”
(17) Add the text “Army, Air Force and” to the title of Figure 5-4 and delete Figure 5-5, “Individual Building Mass... (Army and Air Force)”
(18) Add the text “Army, Air Force and” to the title of Figure 5-6 and delete Figure 5-7, “Use of… System: Army and Air Force”
6. Update. All new requirements will be included in the next appropriate policy document update prior the expiration of this ECB.
ECB No. 2018-17 Subject New Requirements for Visual Notification for Mass Notification Systems
7. Point of Contact. The point of contact is Mr. John W. Wilkus, P.E., Chief Fire Protection Engineer, HQ USACE/CECW-EC, (816) 389-3227.
//S// LARRY D. McCALLISTER, PhD, PE, PMP, SES Chief, Engineering and Construction U.S. Army Corps of Engineers
| 1. References: |
| a. Unified Facilities Criteria (UFC) 4-021-01 Change 1, DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, January 2010 |
| 2. Purpose. This directive provides new requirements for mass notification systems. |
| 3. Applicability. This applies to new mass notification systems for new construction and rehabilitation projects for U.S. Army facilities. This also applies to new mass notification systems for new construction and rehabilitation projects for U.S. A... |
| 4. Background. UFC 4-021-01, Design and O&M: Mass Notification Systems, requires Army and Air Force facilities to use amber strobes at all locations inside the facility as the visible signal to alert occupants with hearing disabilities about non-fir... |
| 5. Directive. |
| 6. Update. All new requirements will be included in the next appropriate policy document update prior the expiration of this ECB. |
| 7. Point of Contact. The point of contact is Mr. John W. Wilkus, P.E., Chief Fire Protection Engineer, HQ USACE/CECW-EC, (816) 389-3227. |