TE-NNN Gas Leak and Repair Report.docx

DOCX document 17 KB Posted

Attached to
Base Operation Support Services for Dugway Proving Grounds, UT
Solicitation number
W911S6-16-R-0002
Issued by

About this file

TE-NNN Gas Leak and Repair Report

View the file

Other files

File Type Posted
Response_to_Question_3.xlsx XLSX spreadsheet
Attachment 12 Amendment 0002 FY15 IJO Historical List.xlsx XLSX spreadsheet
TE H GFP and CAP Report.xlsx XLSX spreadsheet
Attachment 1-DPG BOSS PWS--Amend 0002.pdf PDF
Attachment L3 PPQ, 16-R-0002, DPG BOSS, 10Mar17.docx DOCX document
W911S6-16-R-0002-0002 Conformed CopyFinal.pdf PDF
Attachment 8 General Decision Number UT170067.pdf PDF
Attachment L6-Proposed Staffing Amendment 0002.xlsx XLSX spreadsheet
W911S6-16-R-0002-0002 Modification Final.pdf PDF
Attachment 9 WD 15-5489.pdf PDF
Attachment 11A DD Form 254 Amend0002.pdf PDF
Attachment L2 Relevant Contracts, 16-R-0002, Amend 0002.pdf PDF
Attachment 7 General Decision Number UT170057.pdf PDF
DPG_BOSS_Set_2_Responses_to_Questions.xlsx XLSX spreadsheet
Attachment L5 Pricing Proposal Form Amend0002.xlsx XLSX spreadsheet
Attachment 6 General Decision Number UT170031.pdf PDF
Attachment 11B DD Form 254 Cont Amendment 0002.pdf PDF
Attachment 5 General Decision Number UT170107.pdf PDF
DPG_BOSS_Set_1_Responses_to_Questions.xlsx XLSX spreadsheet
Attachment L5 Pricing Proposal Form --16-R-0002 DPG BASEOPS10Mar17.xlsx XLSX spreadsheet
Attachment L3 PPQ, 16-R-0002, DPG BOSS, 10Mar17.docx DOCX document
Attachment L2 Relevant Contracts, 16-R-0002, Dugway Proving Grounds, BOSS,10Mar17.docx DOCX document
Attachment L6-Proposed Staffing.xlsx XLSX spreadsheet
W911S6-16-R-0002-0001 SF33 Conformed Copy Released.pdf PDF
W911S6-16-R-0002-0001 SF30 Modification Document Released.pdf PDF
Attachment L4 PPQCover, 16-R-0002, DPG BOSS, 14 MAR 17 V2 J1.pdf PDF
TE-BB Chemical Usage Report.xlsx XLSX spreadsheet
TE-YYY Number Movements & Placements.xlsx XLSX spreadsheet
TE-UUU List Back Flow Preventors.pdf PDF
TE-BBB-1 AST-UllageLog.docx DOCX document
TE-LLL Utility Data.docx DOCX document
TE-FF Snow Removal Priorities.pdf PDF
TE-Q-1 Historical Work Load.xlsx XLSX spreadsheet
TE-BB-1 Daily Report.docx DOCX document
TE-XX HVAC Filters.pdf PDF
TE-N Water Contamination Threat.pdf PDF
TE-P Real Property PM Task List.xlsx XLSX spreadsheet
TE-DD Paved Roads & Parking Sections.xlsx XLSX spreadsheet
TE-B Typical Certifications.pdf PDF
Attachment 8 General Decision Number UT67.pdf PDF
TE-R Historic Buildings.pdf PDF
Attachment 5 General Decision Number UT107.pdf PDF
TE-XXX Estimated Appliances Replacment.xlsx XLSX spreadsheet
TE-LL UPS Locations.xlsx XLSX spreadsheet
TE-FF-1 Historical Snowfall Data.xlsx XLSX spreadsheet
TE-SS Air Conditioner Systems.pdf PDF
TE-TT Chiller Water Chemistry.xlsx XLSX spreadsheet
TE-UU Exhaust Fans.pdf PDF
TE-EE Unpaved Roads.pdf PDF
TE-DDD List of Lifting Devices.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit Solicitation: W911S6-16-R-0002 4/26/2016

TE-NNN GAS LEAK AND REPAIR REPORT

RECEIPT OF REPORT

DMO Number
Bldg #
Date
Time

Location of Leak

Description of Leak

Inside
Outside
Leak Detected By
Odor
Noise
CGI
Other
Leak Reported By
Public
Customer
Survey Crew
Other

Report Received By

DISPATCHED

Date
Time
Assigned To

INVESTIGATION

Date Arrived
Time Arrived
Investigated By
Leak Found
Yes
No
CGI Used
Yes
No
Leak Grade
1
2
3

Findings:

Reported to DPW
Name

Tech Monitor 526-9243

Date
Time

Location of Leak

Cause of Leak

Condition Made Safe
Date
Time

REPAIR REPORT

Leak At
Threads
Coupling
Weld
Valve
Other
Pipe
Size
Steel
Plastic
Cast Iron
Other
Depth
Coating
Enamel
Wrapped
Galvanized
Other
Coating Condition
Good
Fair
Poor
Soil Conditions
Sand
Clay
Loam
Other
Soil Moisture
Dry
Damp
Wet
Other

Repairs Made

Gas Off for More than 1 Hour
Yes / No

Repair Coating Used

Anodes Installed
Yes / No
Weight
Depth

Completed By

Date

Supervisor Signature

Date

Copy of report sent to Government

TO BE SUBMITTED WITH IN 24 HOURS OF RESPONSE

Time
Date

File details come from the government source that posted it. Updated .