TE-BBB-1 AST-UllageLog.docx
DOCX document 16 KB Posted
- Attached to
- Base Operation Support Services for Dugway Proving Grounds, UT Federal contract opportunity
- Solicitation number
- W911S6-16-R-0002
About this file
TE-BBB-1 AST-UllageLog
View the file
Other files for this federal contract opportunity
Show all 50
Base Operation Support Services for Dugway Proving Grounds, UT has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911S6-16-R-0002
TE-BBB-1
AST Ullage Log 4/7/2016
ABOVEGROUND STORAGE TANK ULLAGE LOG
Use a separate log sheet for each tank
Use either this form or its equivalent to document ullage (available capacity) calculations as required by Utah’s Storage Tank Regulations. Use the correct tank chart to convert from inches to gallons. If ullage is calculated by an ATG, it is acceptable to save the ATG inventory tape that shows the ullage in gallons. Keep these records at least six (6) months. However, it is advisable to keep records indefinitely, since they may be required as part of the compliance review concerning a claim for reimbursement from the Petroleum Storage Tank Fund. The requirement to determine ullage before delivery begins applies to all ASTs, including ASTs equipped with overfill prevention equipment that stops delivery or sounds an audible alarm.
Facility name
Fac. ID # (if known)
Street address
Product in tank
City
ZIP
Tank capacity (gallons)
| Date |
| Gauge or stick reading |
| Conversions to gallons |
| Available Capacity |
| Quantity Added |
| Initials |
Report Suspected or Confirmed Leaks to the Dugway Environmental Compliance Division @ 435-831-3218
File details come from the government source that posted it. Updated .