TE-FF Snow Removal Priorities

View the file

Other files for this federal contract opportunity

Other files attached to Base Operation Support Services for Dugway Proving Grounds, UT, newest first.
File Type Posted
W911S6-16-R-0002-0002 Conformed CopyFinal.pdf PDF
Attachment L6-Proposed Staffing Amendment 0002.xlsx XLSX spreadsheet
Attachment 11A DD Form 254 Amend0002.pdf PDF
Attachment 12 Amendment 0002 FY15 IJO Historical List.xlsx XLSX spreadsheet
Attachment 1-DPG BOSS PWS--Amend 0002.pdf PDF
Attachment L3 PPQ, 16-R-0002, DPG BOSS, 10Mar17.docx DOCX document
DPG_BOSS_Set_1_Responses_to_Questions.xlsx XLSX spreadsheet
W911S6-16-R-0002-0001 SF33 Conformed Copy Released.pdf PDF
TE-XXX Estimated Appliances Replacment.xlsx XLSX spreadsheet
TE-FF-1 Historical Snowfall Data.xlsx XLSX spreadsheet
TE-LL UPS Locations.xlsx XLSX spreadsheet
Attachment 5 General Decision Number UT107.pdf PDF
TE-RRR Wastewater Treatment Systems.pdf PDF
TE-Y Irrigation System Components.docx DOCX document
TE-FFF VTS Location & Data.xlsx XLSX spreadsheet
TE-PP Boiler List 28MAR16.xlsx XLSX spreadsheet
TE-QQ Water Tret Stands Boilers.docx DOCX document
TE-V-1 Ditto Semi-Improved Land Area.pdf PDF
TE-V English Village Semi-Improved Land Area.pdf PDF
TE-HH PCB SOP.docx DOCX document
Attachment 7 General Decision Number UT57.pdf PDF
TE-RR Furnances-UnitHeaters.pdf PDF
Attachment 1-DPG BOSS Performance Work Statement Final-9Feb17.pdf PDF
TE-F Subcontract Report Example.xlsx XLSX spreadsheet
TE-GGG Fire Alarm and Fire Suppression System List.pdf PDF
TE-HHH Clean Agent Fire Suppression System.xlsx XLSX spreadsheet
TE-U-1 Ditto Improved Area.pdf PDF
TE-L Irrigation Systems Drawing 1-35.pdf PDF
Attachment 4 CBA with One MOU.pdf PDF
TE-ZZ Food Service Equipment.pdf PDF
TE-BB-1 Daily Report.docx DOCX document
TE-N Water Contamination Threat.pdf PDF
TE-BB Chemical Usage Report.xlsx XLSX spreadsheet
TE-YYY Number Movements & Placements.xlsx XLSX spreadsheet
TE-R Historic Buildings.pdf PDF
TE-TT Chiller Water Chemistry.xlsx XLSX spreadsheet
TE-SS Air Conditioner Systems.pdf PDF
TE-UU Exhaust Fans.pdf PDF
TE-VV Air Compressors.pdf PDF
TE-EE Unpaved Roads.pdf PDF
TE-DDD List of Lifting Devices.xlsx XLSX spreadsheet
TE-G Burn Rate Example.xlsx XLSX spreadsheet
TE-AA Pure Live Seed Mix.pdf PDF
TE-SSS WaterOperatingLogs Sample.pdf PDF
Attachment 2-PRS 16-R-0002, DPG BOSS, 26jul16.pdf PDF
TE-ZZZ Self Help Stock Level.pdf PDF
TE-NN Boiler Operating Log.xlsx XLSX spreadsheet
TE-V-3 Baker Semi-Improved Land Area.pdf PDF
TE-WWW List Army Housing Units.xlsx XLSX spreadsheet
TE-YY Evaporative Coolers.pdf PDF
Show all 50

Base Operation Support Services for Dugway Proving Grounds, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911S6-16-R-0002 Technical Exhibit FF 4/7/2016

ROAD AND PARKING LOT PRIORITIES Dugway Proving Grounds

Snow and ice removal of roads and parking lots will be accomplished in the following order to the maximum extent possible:

Priority 1. English Village roads as follows:

Stark Road from Bldg. 5474 to Y outside Main Gate through APC 1 (clearing all traffic lanes) through Ditto via Stark Road to Baker through Baker parking area to Wig Mountain, back to Stark Road to Bldg.

9425 (777) back to Ditto via Stark Road.

1. From Bldg. 5474 to Avery, Bldg. 1010 (to include west parking lot) to Ditto change house Bldg.

4551 to Carr Facility back to Bldg. 5474.

2. Valdez Circle.

3. 2nd Street from Stark Road to E. Knight to Armitage Dr. to Commanders Quarters and retrace route back to 2nd and Stark.

4. 3rd Street from Stark to W. Knight. West 5th Ave back to 3rd and Stark Rd.

5. West School Street, Fifth Avenue to High School (Bldg. 5020), access road and parking lots on east side of High School, remainder of Fifth Avenue, East School Street.

6. Child Development Center (Bldg. 5124)

7. Access entrance to Health Clinic (Bldg. 5116)

8. Fire Station vehicle access area from street to vehicle bays (Bldg. 5212).

9. Service Station/Shoppette (Bldg. 5440) gas pump pull through and visitor parking only.

10. Heli-Pad.

11. Parking areas between Elementary School and Post Chapel.

Roads in West Area to be worked as follows:

1. Second, Third and Fourth Streets between A & C Streets.

2. B & C Streets between Third and Fourth Streets.

3. Fourth Street from B Street to Stark Road and access areas/apron for Bldg. 4541 (Ditto Aid

Station).

4. Parking Areas around Coffman Bldg. 4515 (Security). (If not barricaded)

5. "A" Street between 2nd, 3rd, and 4th Streets.

6. Ditto Fire Station (Bldg. 4026) Apron, parking area and access road from Stark Road.

Priority 2.

1. East Side English Village Housing area.

2. Kister Ave and parking area – Bldg. 5240.

3. Doolittle Ave and parking area Bldg. 5240. Maps are available in the Roads Shop.

4. Eastside Priority 2 parking lots.

5. Bldg. 5441.

6. Tucker Street Bldg. 4016 to Bldg. 4046 Access Gate and Parking Areas.

7. West Side English Village, Housing areas.

8. West side E.V. parking lots.

9. Landfill.

10. Ditto Area Parking Lots

11. Carr Areas Roads and Parking Lots. See Map #5 Priority 2

12. CHWSF area access road, entrance into CHWSF compound, remainder to access road to Ammo

Holding area gate. DO NOT BLOCK THE GATES.

13. Baker Area.

14. Manookin Road and Tank Farm.

Priority 3. All remaining Priority 3 roads and Parking Lots including AQS.

SIDEWALK SCHEDULES

Snow and ice removal from sidewalks will be worked by two primary groups A & B supported by a “C” group in heavy snowfall. Group “A” will complete the Ditto Area and return to English Village. Group “B” will complete sidewalks and move to support Group “A” sidewalks completion. It will be the BRO’s responsibility to maintain the front porch and the sidewalk areas up to 15ft away from the building.

Priority 1

Group A

1. VCC (Bldg. 5910).

2. Ditto Security (Bldg. 4515).

3. Old Post Headquarters (Bldg. 4146).

4. Ditto Aid Station (Bldg. 4541).

5. Kuddes Building (Bldg. 4531).

6. Chem Treaty (Bldg. 4543).

7. Ditto Diner (Bldg. 4545).

8. Chem Lab/Ditto Aid Station Parking Lot, Common Area Sidewalks.

Group B

1. Child Care Center (Bldg. 5124).

2. Health Clinic (Bldg. 5116).

3. S.A.S. (Bldg. 5111) and Access Sidewalk to Chapel (Bldg. 5100) to Elementary School.

4. English Village Headquarters (Bldg. 5450).

5. Fire Station (Bldg. 5212).

6. The E Building (Bldg. 5330).

7. Mall Sidewalks (Bldg. 5326).

8. Sidewalk between CDC (5124) and Chapel (5100).

9. Elementary School (Bldg. 5000) and High School (Bldg. 5020) Sidewalks and Concrete Entrances.

10. Communications Building (Bldg. 5444).

Priority 2.

Group A and B

1. Upon completion of Priority 1 schedules, Groups A and B will proceed to the Priority 2 schedule.

The area listed will be addressed by both groups.

2. Community Club and Antelope Inn (Bldgs. 5230&5228).

3. PMO (Bldg. 5240) and the new Mobile Command Center (Bldg. 5239) and Detention Center

(Bldg. 5237).

4. Ambulance Storage Bay (Bldg. 5236) and Surrounding Sidewalks. Playgrounds.

5. Bowling Alley (Bldg. 5304).

6. Shocklee Fitness Center (Bldg. 5109).

Priority 3.

Group A and B

1. Bachelor Quarters (Bldg. 5132 and 5140).

2. Post Meeting House (Bldg. 5126) to Valdez Circle sidewalk.

3. Play grounds behind the CDC (Bldg. 5124).

4. Youth Center (Bldg. 5300).

5. Commissary (Bldg. 5114).

6. BASOPS Contract (Bldg. 5474), front entrance.

7. Sidewalks from Bldg. 5330 Carr Circle and West Playground.

8. Dorms (Bldgs. 5218 and 5220).

Priority 4.

Group A and B

1. School Block

2. All Sidewalks throughout housing, all cul-de-sac (Mtn. View, Renualt Court, Mtn. View Park and

St. John).

3. All Parks (East, West, Mt. View and St. John).

4. Vacant housing units. Driveways and entryway sidewalks/porch.