TE-FF Snow Removal Priorities.pdf

PDF 80 KB Posted

Attached to
Base Operation Support Services for Dugway Proving Grounds, UT
Solicitation number
W911S6-16-R-0002
Issued by

About this file

TE-FF Snow Removal Priorities

View the file

Other files

File Type Posted
Response_to_Question_3.xlsx XLSX spreadsheet
Attachment 12 Amendment 0002 FY15 IJO Historical List.xlsx XLSX spreadsheet
TE H GFP and CAP Report.xlsx XLSX spreadsheet
Attachment 1-DPG BOSS PWS--Amend 0002.pdf PDF
Attachment L3 PPQ, 16-R-0002, DPG BOSS, 10Mar17.docx DOCX document
W911S6-16-R-0002-0002 Conformed CopyFinal.pdf PDF
Attachment 8 General Decision Number UT170067.pdf PDF
Attachment L6-Proposed Staffing Amendment 0002.xlsx XLSX spreadsheet
W911S6-16-R-0002-0002 Modification Final.pdf PDF
Attachment 9 WD 15-5489.pdf PDF
Attachment 11A DD Form 254 Amend0002.pdf PDF
Attachment L2 Relevant Contracts, 16-R-0002, Amend 0002.pdf PDF
Attachment 7 General Decision Number UT170057.pdf PDF
DPG_BOSS_Set_2_Responses_to_Questions.xlsx XLSX spreadsheet
Attachment L5 Pricing Proposal Form Amend0002.xlsx XLSX spreadsheet
Attachment 6 General Decision Number UT170031.pdf PDF
Attachment 11B DD Form 254 Cont Amendment 0002.pdf PDF
Attachment 5 General Decision Number UT170107.pdf PDF
DPG_BOSS_Set_1_Responses_to_Questions.xlsx XLSX spreadsheet
Attachment L5 Pricing Proposal Form --16-R-0002 DPG BASEOPS10Mar17.xlsx XLSX spreadsheet
Attachment L3 PPQ, 16-R-0002, DPG BOSS, 10Mar17.docx DOCX document
Attachment L2 Relevant Contracts, 16-R-0002, Dugway Proving Grounds, BOSS,10Mar17.docx DOCX document
Attachment L6-Proposed Staffing.xlsx XLSX spreadsheet
W911S6-16-R-0002-0001 SF33 Conformed Copy Released.pdf PDF
W911S6-16-R-0002-0001 SF30 Modification Document Released.pdf PDF
Attachment L4 PPQCover, 16-R-0002, DPG BOSS, 14 MAR 17 V2 J1.pdf PDF
TE-BB Chemical Usage Report.xlsx XLSX spreadsheet
TE-YYY Number Movements & Placements.xlsx XLSX spreadsheet
TE-UUU List Back Flow Preventors.pdf PDF
TE-BBB-1 AST-UllageLog.docx DOCX document
TE-LLL Utility Data.docx DOCX document
TE-Q-1 Historical Work Load.xlsx XLSX spreadsheet
TE-BB-1 Daily Report.docx DOCX document
TE-XX HVAC Filters.pdf PDF
TE-N Water Contamination Threat.pdf PDF
TE-P Real Property PM Task List.xlsx XLSX spreadsheet
TE-DD Paved Roads & Parking Sections.xlsx XLSX spreadsheet
TE-B Typical Certifications.pdf PDF
Attachment 8 General Decision Number UT67.pdf PDF
TE-R Historic Buildings.pdf PDF
Attachment 5 General Decision Number UT107.pdf PDF
TE-XXX Estimated Appliances Replacment.xlsx XLSX spreadsheet
TE-LL UPS Locations.xlsx XLSX spreadsheet
TE-FF-1 Historical Snowfall Data.xlsx XLSX spreadsheet
TE-SS Air Conditioner Systems.pdf PDF
TE-TT Chiller Water Chemistry.xlsx XLSX spreadsheet
TE-UU Exhaust Fans.pdf PDF
TE-EE Unpaved Roads.pdf PDF
TE-DDD List of Lifting Devices.xlsx XLSX spreadsheet
TE-G Burn Rate Example.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911S6-16-R-0002 Technical Exhibit FF 4/7/2016

ROAD AND PARKING LOT PRIORITIES Dugway Proving Grounds

Snow and ice removal of roads and parking lots will be accomplished in the following order to the maximum extent possible:

Priority 1. English Village roads as follows:

Stark Road from Bldg. 5474 to Y outside Main Gate through APC 1 (clearing all traffic lanes) through Ditto via Stark Road to Baker through Baker parking area to Wig Mountain, back to Stark Road to Bldg.

9425 (777) back to Ditto via Stark Road.

1. From Bldg. 5474 to Avery, Bldg. 1010 (to include west parking lot) to Ditto change house Bldg.

4551 to Carr Facility back to Bldg. 5474.

2. Valdez Circle.

3. 2nd Street from Stark Road to E. Knight to Armitage Dr. to Commanders Quarters and retrace route back to 2nd and Stark.

4. 3rd Street from Stark to W. Knight. West 5th Ave back to 3rd and Stark Rd.

5. West School Street, Fifth Avenue to High School (Bldg. 5020), access road and parking lots on east side of High School, remainder of Fifth Avenue, East School Street.

6. Child Development Center (Bldg. 5124)

7. Access entrance to Health Clinic (Bldg. 5116)

8. Fire Station vehicle access area from street to vehicle bays (Bldg. 5212).

9. Service Station/Shoppette (Bldg. 5440) gas pump pull through and visitor parking only.

10. Heli-Pad.

11. Parking areas between Elementary School and Post Chapel.

Roads in West Area to be worked as follows:

1. Second, Third and Fourth Streets between A & C Streets.

2. B & C Streets between Third and Fourth Streets.

3. Fourth Street from B Street to Stark Road and access areas/apron for Bldg. 4541 (Ditto Aid

Station).

4. Parking Areas around Coffman Bldg. 4515 (Security). (If not barricaded)

5. "A" Street between 2nd, 3rd, and 4th Streets.

6. Ditto Fire Station (Bldg. 4026) Apron, parking area and access road from Stark Road.

Priority 2.

1. East Side English Village Housing area.

2. Kister Ave and parking area – Bldg. 5240.

3. Doolittle Ave and parking area Bldg. 5240. Maps are available in the Roads Shop.

4. Eastside Priority 2 parking lots.

5. Bldg. 5441.

6. Tucker Street Bldg. 4016 to Bldg. 4046 Access Gate and Parking Areas.

7. West Side English Village, Housing areas.

8. West side E.V. parking lots.

9. Landfill.

10. Ditto Area Parking Lots

11. Carr Areas Roads and Parking Lots. See Map #5 Priority 2

12. CHWSF area access road, entrance into CHWSF compound, remainder to access road to Ammo

Holding area gate. DO NOT BLOCK THE GATES.

13. Baker Area.

14. Manookin Road and Tank Farm.

Priority 3. All remaining Priority 3 roads and Parking Lots including AQS.

SIDEWALK SCHEDULES

Snow and ice removal from sidewalks will be worked by two primary groups A & B supported by a “C” group in heavy snowfall. Group “A” will complete the Ditto Area and return to English Village. Group “B” will complete sidewalks and move to support Group “A” sidewalks completion. It will be the BRO’s responsibility to maintain the front porch and the sidewalk areas up to 15ft away from the building.

Priority 1

Group A

1. VCC (Bldg. 5910).

2. Ditto Security (Bldg. 4515).

3. Old Post Headquarters (Bldg. 4146).

4. Ditto Aid Station (Bldg. 4541).

5. Kuddes Building (Bldg. 4531).

6. Chem Treaty (Bldg. 4543).

7. Ditto Diner (Bldg. 4545).

8. Chem Lab/Ditto Aid Station Parking Lot, Common Area Sidewalks.

Group B

1. Child Care Center (Bldg. 5124).

2. Health Clinic (Bldg. 5116).

3. S.A.S. (Bldg. 5111) and Access Sidewalk to Chapel (Bldg. 5100) to Elementary School.

4. English Village Headquarters (Bldg. 5450).

5. Fire Station (Bldg. 5212).

6. The E Building (Bldg. 5330).

7. Mall Sidewalks (Bldg. 5326).

8. Sidewalk between CDC (5124) and Chapel (5100).

9. Elementary School (Bldg. 5000) and High School (Bldg. 5020) Sidewalks and Concrete Entrances.

10. Communications Building (Bldg. 5444).

Priority 2.

Group A and B

1. Upon completion of Priority 1 schedules, Groups A and B will proceed to the Priority 2 schedule.

The area listed will be addressed by both groups.

2. Community Club and Antelope Inn (Bldgs. 5230&5228).

3. PMO (Bldg. 5240) and the new Mobile Command Center (Bldg. 5239) and Detention Center

(Bldg. 5237).

4. Ambulance Storage Bay (Bldg. 5236) and Surrounding Sidewalks. Playgrounds.

5. Bowling Alley (Bldg. 5304).

6. Shocklee Fitness Center (Bldg. 5109).

Priority 3.

Group A and B

1. Bachelor Quarters (Bldg. 5132 and 5140).

2. Post Meeting House (Bldg. 5126) to Valdez Circle sidewalk.

3. Play grounds behind the CDC (Bldg. 5124).

4. Youth Center (Bldg. 5300).

5. Commissary (Bldg. 5114).

6. BASOPS Contract (Bldg. 5474), front entrance.

7. Sidewalks from Bldg. 5330 Carr Circle and West Playground.

8. Dorms (Bldgs. 5218 and 5220).

Priority 4.

Group A and B

1. School Block

2. All Sidewalks throughout housing, all cul-de-sac (Mtn. View, Renualt Court, Mtn. View Park and

St. John).

3. All Parks (East, West, Mt. View and St. John).

4. Vacant housing units. Driveways and entryway sidewalks/porch.

File details come from the government source that posted it. Updated .