Attachment 5 General Decision Number UT107.pdf

PDF 62 KB Posted

Attached to
Base Operation Support Services for Dugway Proving Grounds, UT Federal contract opportunity
Solicitation number
W911S6-16-R-0002
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Joint Base Lewis-McChord

About this file

Attachment 5 General Decision Number UT107

View the file

Other files for this federal contract opportunity

Other files attached to Base Operation Support Services for Dugway Proving Grounds, UT, newest first.
File Type Posted
W911S6-16-R-0002-0002 Conformed CopyFinal.pdf PDF
Attachment L6-Proposed Staffing Amendment 0002.xlsx XLSX spreadsheet
Attachment 11A DD Form 254 Amend0002.pdf PDF
Attachment 12 Amendment 0002 FY15 IJO Historical List.xlsx XLSX spreadsheet
Attachment 1-DPG BOSS PWS--Amend 0002.pdf PDF
Attachment L3 PPQ, 16-R-0002, DPG BOSS, 10Mar17.docx DOCX document
DPG_BOSS_Set_1_Responses_to_Questions.xlsx XLSX spreadsheet
W911S6-16-R-0002-0001 SF33 Conformed Copy Released.pdf PDF
TE-XXX Estimated Appliances Replacment.xlsx XLSX spreadsheet
TE-FF-1 Historical Snowfall Data.xlsx XLSX spreadsheet
TE-LL UPS Locations.xlsx XLSX spreadsheet
TE-RRR Wastewater Treatment Systems.pdf PDF
TE-Y Irrigation System Components.docx DOCX document
TE-FFF VTS Location & Data.xlsx XLSX spreadsheet
TE-PP Boiler List 28MAR16.xlsx XLSX spreadsheet
TE-QQ Water Tret Stands Boilers.docx DOCX document
TE-V-1 Ditto Semi-Improved Land Area.pdf PDF
TE-V English Village Semi-Improved Land Area.pdf PDF
TE-HH PCB SOP.docx DOCX document
Attachment 7 General Decision Number UT57.pdf PDF
TE-RR Furnances-UnitHeaters.pdf PDF
Attachment 1-DPG BOSS Performance Work Statement Final-9Feb17.pdf PDF
TE-F Subcontract Report Example.xlsx XLSX spreadsheet
TE-GGG Fire Alarm and Fire Suppression System List.pdf PDF
TE-HHH Clean Agent Fire Suppression System.xlsx XLSX spreadsheet
TE-U-1 Ditto Improved Area.pdf PDF
TE-L Irrigation Systems Drawing 1-35.pdf PDF
Attachment 4 CBA with One MOU.pdf PDF
TE-ZZ Food Service Equipment.pdf PDF
TE-BB-1 Daily Report.docx DOCX document
TE-N Water Contamination Threat.pdf PDF
TE-BB Chemical Usage Report.xlsx XLSX spreadsheet
TE-YYY Number Movements & Placements.xlsx XLSX spreadsheet
TE-R Historic Buildings.pdf PDF
TE-TT Chiller Water Chemistry.xlsx XLSX spreadsheet
TE-SS Air Conditioner Systems.pdf PDF
TE-UU Exhaust Fans.pdf PDF
TE-VV Air Compressors.pdf PDF
TE-EE Unpaved Roads.pdf PDF
TE-DDD List of Lifting Devices.xlsx XLSX spreadsheet
TE-G Burn Rate Example.xlsx XLSX spreadsheet
TE-AA Pure Live Seed Mix.pdf PDF
TE-SSS WaterOperatingLogs Sample.pdf PDF
Attachment 2-PRS 16-R-0002, DPG BOSS, 26jul16.pdf PDF
TE-ZZZ Self Help Stock Level.pdf PDF
TE-NN Boiler Operating Log.xlsx XLSX spreadsheet
TE-V-3 Baker Semi-Improved Land Area.pdf PDF
TE-WWW List Army Housing Units.xlsx XLSX spreadsheet
TE-YY Evaporative Coolers.pdf PDF
Attachment 12-Historical IJOs.pdf PDF
Show all 50

Base Operation Support Services for Dugway Proving Grounds, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: UT160107 10/07/2016 UT107

Superseded General Decision Number: UT20150107

State: Utah

Construction Type: Building

County: Tooele County in Utah.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/29/2016 2 03/04/2016 3 04/22/2016 4 07/29/2016 5 10/07/2016

CARP1507-001 01/01/2014

Rates Fringes

CARPENTER (Drywall Hanging and Metal Stud Installation Only)............................$ 21.00 8.66

ELEC0354-001 01/01/2016

Rates Fringes

ELECTRICIAN (Low Voltage Wiring Only).....................$ 23.51 9.97

ELECTRICIAN......................$ 30.39 11.35

ELEV0038-003 01/01/2014

Rates Fringes

ELEVATOR MECHANIC................$ 39.28 26.785

PAIN0077-003 01/01/2013

12/1/2016http://www.wdol.gov/wdol/scafiles/davisbacon/UT107.dvb?v=5

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 19.50 6.28

PAIN0077-004 08/01/2013

Rates Fringes

PAINTER (Brush, Roller, and Spray, excluding Drywall/Finisher and Taper)......$ 18.25 6.65

* PLUM0140-001 08/01/2016

Rates Fringes

PLUMBER/PIPEFITTER...............$ 32.85 13.68

SFUT0669-003 04/01/2016

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 32.14 17.77

SHEE0312-002 07/01/2014

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 32.11 11.40

SUUT2012-018 07/29/2014

Rates Fringes

BRICKLAYER.......................$ 22.13 1.67

CARPENTER (Acoustical Ceiling Installation Only)...............$ 21.25 2.40

CARPENTER (Form Work Only).......$ 16.93 1.93

CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation................$ 20.73 7.53

CEMENT MASON/CONCRETE FINISHER...$ 15.00 0.00

INSULATOR - MECHANICAL

(Duct, Pipe & Mechanical System Insulation)...............$ 15.28 1.65

IRONWORKER, STRUCTURAL...........$ 20.21 3.22

LABORER: Common or General......$ 13.84 0.00

LABORER: Mason Tender - Brick...$ 16.38 1.00

LABORER: Mason Tender - Cement/Concrete..................$ 14.94 0.00

LABORER: Pipelayer..............$ 13.57 0.00

LABORER: Landscape and Irrigation.......................$ 9.50 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 14.48 0.00

OPERATOR: Loader................$ 19.34 0.00

PLASTERER........................$ 18.36 0.00

ROOFER...........................$ 13.22 0.00

TILE FINISHER....................$ 13.54 0.00

TILE SETTER......................$ 23.50 0.00

TRUCK DRIVER: Dump Truck........$ 15.50 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .