TE-MMM Gas Leak Survey Requirements.docx

DOCX document 17 KB Posted

Attached to
Base Operation Support Services for Dugway Proving Grounds, UT
Solicitation number
W911S6-16-R-0002
Issued by

About this file

TE-MMM Gas Leak Survey Requirements

View the file

Other files

File Type Posted
Response_to_Question_3.xlsx XLSX spreadsheet
Attachment 12 Amendment 0002 FY15 IJO Historical List.xlsx XLSX spreadsheet
TE H GFP and CAP Report.xlsx XLSX spreadsheet
Attachment 1-DPG BOSS PWS--Amend 0002.pdf PDF
Attachment L3 PPQ, 16-R-0002, DPG BOSS, 10Mar17.docx DOCX document
W911S6-16-R-0002-0002 Conformed CopyFinal.pdf PDF
Attachment 8 General Decision Number UT170067.pdf PDF
Attachment L6-Proposed Staffing Amendment 0002.xlsx XLSX spreadsheet
W911S6-16-R-0002-0002 Modification Final.pdf PDF
Attachment 9 WD 15-5489.pdf PDF
Attachment 11A DD Form 254 Amend0002.pdf PDF
Attachment L2 Relevant Contracts, 16-R-0002, Amend 0002.pdf PDF
Attachment 7 General Decision Number UT170057.pdf PDF
DPG_BOSS_Set_2_Responses_to_Questions.xlsx XLSX spreadsheet
Attachment L5 Pricing Proposal Form Amend0002.xlsx XLSX spreadsheet
Attachment 6 General Decision Number UT170031.pdf PDF
Attachment 11B DD Form 254 Cont Amendment 0002.pdf PDF
Attachment 5 General Decision Number UT170107.pdf PDF
DPG_BOSS_Set_1_Responses_to_Questions.xlsx XLSX spreadsheet
Attachment L5 Pricing Proposal Form --16-R-0002 DPG BASEOPS10Mar17.xlsx XLSX spreadsheet
Attachment L3 PPQ, 16-R-0002, DPG BOSS, 10Mar17.docx DOCX document
Attachment L2 Relevant Contracts, 16-R-0002, Dugway Proving Grounds, BOSS,10Mar17.docx DOCX document
Attachment L6-Proposed Staffing.xlsx XLSX spreadsheet
W911S6-16-R-0002-0001 SF33 Conformed Copy Released.pdf PDF
W911S6-16-R-0002-0001 SF30 Modification Document Released.pdf PDF
Attachment L4 PPQCover, 16-R-0002, DPG BOSS, 14 MAR 17 V2 J1.pdf PDF
TE-BB Chemical Usage Report.xlsx XLSX spreadsheet
TE-YYY Number Movements & Placements.xlsx XLSX spreadsheet
TE-UUU List Back Flow Preventors.pdf PDF
TE-BBB-1 AST-UllageLog.docx DOCX document
TE-LLL Utility Data.docx DOCX document
TE-FF Snow Removal Priorities.pdf PDF
TE-Q-1 Historical Work Load.xlsx XLSX spreadsheet
TE-BB-1 Daily Report.docx DOCX document
TE-XX HVAC Filters.pdf PDF
TE-N Water Contamination Threat.pdf PDF
TE-P Real Property PM Task List.xlsx XLSX spreadsheet
TE-DD Paved Roads & Parking Sections.xlsx XLSX spreadsheet
TE-B Typical Certifications.pdf PDF
Attachment 8 General Decision Number UT67.pdf PDF
TE-R Historic Buildings.pdf PDF
Attachment 5 General Decision Number UT107.pdf PDF
TE-XXX Estimated Appliances Replacment.xlsx XLSX spreadsheet
TE-LL UPS Locations.xlsx XLSX spreadsheet
TE-FF-1 Historical Snowfall Data.xlsx XLSX spreadsheet
TE-SS Air Conditioner Systems.pdf PDF
TE-TT Chiller Water Chemistry.xlsx XLSX spreadsheet
TE-UU Exhaust Fans.pdf PDF
TE-EE Unpaved Roads.pdf PDF
TE-DDD List of Lifting Devices.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit Solicitation: W911S6-16-R-0002 4/7/2016

TE-MMM

Annual Gas Leak Survey Requirements

1. Surveyed: All underground gas mains, service lines, valves and above ground service lines which include post side gas regulators and meters. (Excludes individual building service lines in the family housing areas.)

2. Testing Equipment: Identify detection equipment used during the survey. Identify when equipment calibration was performed, by whom and to what standard.

3. Leak Testing Procedures: All lines are to be walked or driven with appropriate leak detection equipment. All suspected leaks shall be further investigated / tested in the following manner: Above ground leaks shall be pinpointed with appropriate leak detection device and leak detection soap. Underground gas leaks shall be pinpointed using approved bore hole procedures and pot holing. (DMOs shall be called in and a leak report submitted for any leaks found.)

4. Area Survey / Dates: identify what was surveyed and when by month. Using map pages to identify areas is acceptable

5. Propane Tanks: Identify the building number, tank size and serial number of all propane tanks surveyed. Using map pages to identify areas is acceptable

6. Leaks: In a narrative format, Indicate the number of gas leaks responded to; how many were positive vs negative, the leaks discovered during the survey by location, how leaks were repaired, and any propane tank discrepancies.

File details come from the government source that posted it. Updated .