TE-BBB AST-Visual Inspect Form.docx
DOCX document 16 KB Posted
- Attached to
- Base Operation Support Services for Dugway Proving Grounds, UT Federal contract opportunity
- Solicitation number
- W911S6-16-R-0002
About this file
TE-BBB AST-Visual Inspect Form
View the file
Other files for this federal contract opportunity
Show all 50
Base Operation Support Services for Dugway Proving Grounds, UT has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TE-8.5.8.10.4.
AST Visual Inspection Form
ABOVEGROUND STORAGE TANK MONTHLY VISUAL INSPECTION FORM
Facility name
Inspection Date
Street address
| City |
| ZIP |
Use either this form or its equivalent to document monthly visual inspections required by Utah Storage Tank Regulations. Keep these records at least 12 months. However, it is advisable to keep records indefinitely, since they may be required as part of the compliance review concerning a claim for reimbursement from the Petroleum Storage Tank Fund.
1. Visible leaks on tanks, tank seams, connections, fittings or valves? No Yes If “yes,” identify tank & describe leak. Record action taken to correct problem and date done.
2. Visible leaks on aboveground piping, pipe seams, connections, fittings, flanges, threaded connections, pumps or valves? No Yes If “yes,” identify & describe leak. Record action taken to correct problem and date done.
3. Is overfill prevention equipment in good operating condition? No Yes Not applicable If “no,” identify tank. Record action taken to correct problem and date done.
Verify operation of overfill prevention equipment according to the equipment manufacturer’s instructions. Verify operation of audible alarm if it can be tested.
4. If double-walled tank:
A. Is interstice free of liquid? No Yes If “no,” identify tank. Record action taken to correct problem and date done.
B. Is interstitial monitoring equipment operating properly? No Yes Not applicable
Verify operation of interstitial monitoring equipment according to the equipment manufacturer’s instructions.
5. Secondary containment system free of tank product or other liquids/debris, such as rainwater, snowmelt, dirt, leaves, trash, etc.) No Yes Not applicable
6. Are concrete surfaces and ground free of any evidence of new leakage or spillage? No Yes If “no,” describe. Record action taken to correct problem and date done.
Signed Date
Report Suspected or Confirmed Leaks to the Dugway Environmental Compliance Division @ 435-831-3218