This solicitation is for interior improvement work at Building B1218 on Fort Carson. The contractor shall renovate the building in accordance with the statement of work, including removing and replacing flooring, ceilings, walls, doors, and mechanical and electrical systems. Specific requirements include upgrading restrooms; installing new suspended ceilings, flooring, doors, and windows; removing asbestos floor tile and mastic; and connecting HVAC systems to the base-wide control system. The work must be completed by the anticipated start date after 2 October 2020. The Army Materiel Command Mission and Installation Contracting Command at Fort Hood issued the solicitation.

View the file

Other files

File Type Posted
RELEASED AMENDMENT 0007 20-B-0001-0007 .pdf PDF
GENERAL WAGE DECISION BUILDING CO20200022 MODIFICATION 4 10-30-2020.pdf PDF
AMENDMENT 6 DPW15-123 furniture inventory B1218.pdf PDF
AMENDMENT 6 DPW15-123 REVISED SOW 1 B1218 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 Answers bidders questions B1218 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 B 1218 DRAWING COLOR 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 LATEST SOW 2 FURNITURE MOVE B1218.pdf PDF
RELEASED AMENDMENT 20-B-0001-0006.pdf PDF
AMENDMENT 6 DPW15-123 NEC DESIGN SUPPLEMENTAL Aug 2019 update.pdf PDF
AMENDMENT 6 DPW15-123 REVISED Submittal Register 27 OCT 2020.xls XLS spreadsheet
AMENDMENT 6 DPW15-123 B 1218 DRAWING GRAYSCALE 27 OCT 2020.pdf PDF
REVISION DPW15-123 RPR B1218 DWG GRAYSCALE 3 OCT 2020.pdf PDF
REVISION Submittal Register 3 OCTOBER 2020.xls XLS spreadsheet
SOW 2 Furniture Move B1218 7 OCTOBER 2020.pdf PDF
RELEASED AMENDMENT W911RZ-20-B-0001-0005.pdf PDF
REVISION DPW15-123-RPR B1218 DWG COLOR 3 OCT 2020.pdf PDF
ATTACHMENT FOR SOW 2 furniture inventory B1218 7 OCTOBER .pdf PDF
ATTACHMENT FOR SOW 2 BLDG 1218 - 2nd Floor plan - 7 OCT 2020 .pdf PDF
NEW B1218 Asbuilts Combined 3 OCTOBER 2020.pdf PDF
REVISION SOW 1 B1218 2 OCTOBER 2020.pdf PDF
ATTACHMENT FOR SOW 2 BLDG 1218 - 3rd Floor plan - 7 OCT 2020.pdf PDF
20-B-0001-0004 solicitation amendment.pdf PDF
WAGE DECISION CO20200022 BUILDING 8-28-2020.txt TXT text file
Bid Opening location W911RZ-20-B-0001.pdf PDF
W911RZ-20-B-0001-0003 amendment.pdf PDF
WAGE DECISION CO20200008 8-28-2020 HIGHWAY.txt TXT text file
RELEASED SOLICITATION 20-B-0001-0002.pdf PDF
DPW15-123 SOLICITATION MOD SF30.pdf PDF
Fort Carson COVID Travel and Leave Business Rules Smart Card 4AUG20.pdf PDF
Fort Carson Form 2036 March 2020.pdf PDF
RELEASED SOLICITATION 20-B-0001.pdf PDF
Wage Decision Number CO20200022 january 2020.docx DOCX document
DPW15-123-RPR RENOVATION BLDG 1218 DRAWING COLOR.pdf PDF
AT-OPSEC Cover Sheet (Interior improvements for B1218).pdf PDF
2015_B1218_FINAL_Report_Short Version.pdf PDF
SOW B1218 2 June 2020.pdf PDF
Submittal Register.xls XLS spreadsheet
DPW15-123-RPR RENOVATION BLDG 1218 DRAWING GRAYSCALE.pdf PDF
DRAFT 20-B-0001 SUN AUG 16 245PM.pdf PDF
2020-223mg_REC_DPW15-123.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI RESPONSES FOR B1218 DPW15-123

PLEASE REFER TO RE-ISSUED DRAWINGS THAT WILL BE

SENT OUT FROM THE CONTRACTING OFFICE FOR

PLACING YOUR BID.

G1-RJS 1. please make today’s site visit attendees list available at your earliest convenience

The list of attendees was sent out on 2 September from the contracting office.

G2-RJS 2. is it the intent of the Government to issue specifications in a project manual format or are the specifications noted in the drawings as much as we might expect?

Specifications in a project manual format will not be issued. Only the specifications noted on the drawings and the Saber specs will be applicable.

G3-RJS 3. There is substantial ff&e remaining in the facility. Is the removal of this equipment the responsibility of the Government or the contractor?

The Government will remove the furniture.

G4-RJS 4. Does the government anticipate the bid date will be pushed with the issuance of amendment 0002?

Yes, the bid date will extended. See Amendment information for details on exact date and time.

G5-RJS 5. Would the Government considering revising the proposal submittal method to include email submissions? We acknowledge that, currently, proposals are to be ‘hand-delivered’.

Bids do not need to be hand delivered. They can be sent via United States Postal Service (USPS) mail, USPS express mail, United Parcel Service (UPS), Federal

Express or any other mail service as long as they arrive by the bid opening date and time at the place designated for receipt of bids in the solicitation. Due to firewalls that exist in our Fort Carson email system, emails are sometimes delayed, thus I cannot be sure bids would be received in a timely fashion when sent via email. Thus I cannot authorize bids being transmitted via email. However, I will be amending the solicitation to change the location and time for the receipt of hand carried bids to avoid individual(s) needing access through installation security gates.

G6-RJS 6. The solicitation references the transmission / submission of submittals to the Government in hard copy only (and in multiple copies). Would the Government consider accepting submittals electronically?

Submittals for equipment and products should be sent electronically.

G7-RJS 1. Please reference drawing sheet G-0.1 General requirements. Can these requirements be provided to the bidders or all reference to them be removed from the contract documents?

The SABER specs are not a part of the project.

G8-RJS 2. If an opening to be demo’d is not identified as note 1 or note 2, is there an acceptable default?

No

G9-RJS 3. FA drawing sheets 1.0 thru 3.0 reference, under general notes, a drawing FA-0.1. We are unable to find this particular drawing

This should be FA-0.0 and is not in order in the drawing package it is the last FA drawing new package this will be corrected.

G10-RJS 4. FN 4.0 references ‘architectural sheet A-100’ when indicating the removal and replacement of the existing floor drain (FD-1). We are unable to find this particular drawing. We note that the slab on grade (or at least a topping) in the areas well is badly degraded. Ids this slab to be replaced / re-topped?

There is no drawing A-100. Re-top the existing slab.

G11-RJS 5. AN-1.0 references a drawing A-0304 (in the area of the future conference room). Is this drawing relevant? We are unable to find this particular drawing.

There is no drawing A-0304. Drawing AN-1.0 is being changed to reference AN-7.0, which is the architectural details sheet.

G12-RJS 6. Will the existing ff&e be removed by the Government prior to the issuance of an NTP?

The Government will remove the furniture.

G13-RJS 7. Is there a specific keying protocol for storeroom, office, etc. locksets?

4. 1-D Keyed Access Entry Control

4.1-D.1 General Requirements

The construction contractor shall be responsible for installation of all locksets and exit devices for their assigned project(s). This includes combination and installation of any required cores and key duplication.

The core type and combination shall meet the requirements of the master key system on Fort Carson.

4.1-D.1 (A) Lockset To meet the Ft Carson master key plan, provide all keyed lockset devices with patented Best Lock Corporation or ASSA ABLOY Corporation cores.

4.1-D.1 (B) Lock Cores The construction contractor shall be responsible for installation of all permanent lock cores. Any coordination required with Best Lock Corporation or ASSA ABLOY Corporation for installation of the cores shall be planned for and is the responsibility of the construction contractor. The contractor shall be responsible for the core schedule, installing all cores and validating functionality of all keys for the respective core including the master key(s).

4.1-D.1(C) Cylinders Provide fully compatible cylinders with products of the Best Lock Corporation or ASSA ABLOY Corporation with Small Format Interchangeable Cores (SFIC), which are removable by a special control key. Factory set the cores with [seven] pin tumblers using the BEST or MEDECO Keymark x4 patented keyways (for use solely in the 18, 19, 24 or 25 series locksets as determined by design source). Submit a core code sheet with the cores.

Provide master keyed cores in one system for this project. Provide construction interchangeable cores.

Equipment spaces; electrical, communications and mechanical rooms shall be keyed independently from the building master system. The communication room door shall be on a different core than the DPW areas.

4.1-D.1 (D) Keys All cores shall include four keys for interior doors and five keys for exterior doors and with two master keys for each KNOX box placed at the building location. Furnish a quantity of key blanks equal to 20-percent of the total number of file keys. All keys shall be stamped with "U.S.

GOVERNMENT DO NOT DUPLICATE". In addition the keys and cores shall be stamped with the core number.

Do not place room number on keys. All master keys provided shall be turned over to the O&M contractor locksmith for security control through the Government Project Engineer. All other keys shall be inventoried and turned over to Facilities Utilization for issue to the building occupants through the government Project Engineer. Provide a key cabinet and control system for all facility keys, including a floor plan cross referenced to all key locations.

G14-RJS 8. When re-using existing frames, must an as-built of each opening be made before prepping doors or is the confidence level high that the frames are typical?

The frames are typical.

G15-RJS 9. Is there a detail for new equipment pads?

See equipment pad detail 3 on dwg A-7.0.

G16-RJS 10. does the new cmu sound wall at ACC-1 get a continuous footing or can it set on the new 8” slab on grade (with a thickened edge)?

See soundwall section 2 on dwg A-7.0.

G17-RJS 11. Is there a detail for the restroom lavatory countertops and support?

See countertop section 1, drawing A-7.0.

G18-RJS 12. The note for the chase indicated in the southwest corner of the basement mechanical room references a drawing P-110. We are unable to find this drawing. Does this chase require a rating?

I think that was seen on sheet PN-4.0 Basement Plumbing plan, and should have referenced drawing PN-

1.0 (Not P-110) above on first floor for continuation of piping.

G19-RJS 13. There are numerous existing window and other openings which are shown on drawings AN-1, AN- 2 & AN-3 to be infilled. There are no elevations or window schedule which show the dimensions of these openings. Are there as-built drawings or additional elevations which can be used to determine this scope of work.

The windows are 3’-4” wide x 5’ - 9” high. See attached as-built drawings (for reference only)

G20-RJS 1. Please reference drawing sheet FN 5.0. The new fire line is indicated as ductile iron. Can this requirement be revised to include HDPE pipe?

Yes, HDPE is allowed from the water main to interior side of the wall penetration at the Mechanical Room and then transfer to ductile iron.

G21-RJS 2. Please reference drawing sheet FN 5.0. Does the broken line from the building to the fire department connection / flow hydrant 1 indicate that this is new work?

Yes, a new remote fire department connection is to be installed no greater than 100 feet from (not connected

to) Flow Hydrant 1, and 4'-0” min. from back of curb, or 2’-0” min from back of sidewalk. A new Fire department connection pipe (shown as broken/dashed line on drawing) is to be installed from building to remote FDC as shown in drawings FN-4.0 and FN-5.0.

G22-RJS 1. Please reference the SOW and specifically item 2.4.5. We are struggling to locate the ‘new reception area’ identified in this item. Please provide the level and gridline coordinates for this room.

This paragraph will be deleted from the SOW.

G23-RJS 2. Notes 9 and / or 10 on drawings nos. A 1.0 –

A 3.0 direct the contractor to place / provide self-leveling floor filler where cu walls were removed

(reference drawing nos. AD 1.0 – AD 3.0). Existing ceramic floor tile to remain.

G23a-RJS - is the self-leveling filler to be applied only to those slab areas disturbed by the demolition of the cu walls and only to the depth of the adjacent ceramic tile flooring?

See drawing AD-01, key note which states remove the existing concrete floor slab between column rows 3 and

135 and column rows E and D. This includes existing ceramic mosaic floor tile. Therefore, no self-leveling is required.

G23b-RJS - please clarify the depth and extent of the filler in those areas indicated to receive new vct flooring

See drawing AD-01, key note which states remove the existing concrete floor slab between column rows 3 and

135 and column rows E and D. This includes existing ceramic mosaic floor tile. Therefore, no self-leveling is required.

G24-RJS 3. In addition to notes 1, 2, 3&5, office nos. 1-

10, 1-21, 2-12, 2-24, 3-12 & 3-23 have notes 4 & 6. Were these notes intended for the finishes in the adjacent stairs? Please clarify

Yes.

G25-RJS 4. Conference room 2 has no finishes indicated despite walls and existing finishes being demolished therein. Please clarify what finishes (if any) are required in this space.

Use notes 1, 2, 4, 5 and 17.

G26-RJS 1. Are there specifications (or standards) available providing additional information / requirements for the hollow metal frames, wood doors and finish hardware for the project. We have reviewed the Fort Carson Installation Design Guide but it appears it is under development and does not address these issues. We note that there are several references to a

SABER contract in our documents. Might there be some standards there that could be applied to this project?

Failing that, can the Government provide supplemental direction relative to our Division 08 questions?

The new hollow metal door frames shall be knock down frames. The new interior doors shall be solid core, flush

Birch, natural finish (varnish). Concerning door hardware:

4. 1-D Keyed Access Entry Control

4.1-D.1 General Requirements The construction contractor shall be responsible for installation of all locksets and exit devices for their assigned project(s). This includes combination and installation of any required cores and key duplication.

The core type and combination shall meet the requirements of the master key system on Fort Carson.

4.1-D.1 (A) Lockset To meet the Ft Carson master key plan, provide all keyed lockset devices with patented Best Lock Corporation or ASSA ABLOY Corporation cores.

4.1-D.1 (B) Lock Cores The construction contractor shall be responsible for installation of all permanent lock cores. Any coordination required with Best Lock Corporation or ASSA ABLOY Corporation for installation of the cores shall be planned for and is the responsibility of the construction contractor. The contractor shall be responsible for the core schedule, installing all cores and validating functionality of all keys for the respective core including the master key(s).

4.1-D.1(C) Cylinders Provide fully compatible cylinders with products of the Best Lock Corporation or ASSA ABLOY Corporation with Small Format Interchangeable Cores (SFIC), which are removable by a special control key. Factory set the cores with [seven] pin tumblers using the BEST or MEDECO Key mark x4 patented keyways (for use solely in the 18, 19, 24 or 25 series locksets as determined by design source). Submit a core code sheet with the cores.

Provide master keyed cores in one system for this project. Provide construction interchangeable cores.

Equipment spaces; electrical, communications and mechanical rooms shall be keyed independently from the building master system. The communication room door shall be on a different core than the DPW areas.

4.1-D.1 (D) Keys All cores shall include four keys for interior doors and five keys for exterior doors and with two master keys for each KNOX box placed at the building location. Furnish a quantity of key blanks equal to 20-percent of the total number of file keys. All keys shall be stamped with "U.S.

GOVERNMENT DO NOT DUPLICATE". In addition the keys and cores shall be stamped with the core number.

Do not place room number on keys. All master keys provided shall be turned over to the O&M contractor locksmith for security control through the Government Project Engineer. All other keys shall be inventoried and turned over to Facilities Utilization for issue to the building occupants through the government Project Engineer. Provide a key cabinet and control system for all facility keys, including a floor plan cross referenced to all key locations.

G27-RJS 1. Please confirm that there is to be no salvage of those doors and hardware covered by note 1 in the

AD drawings and the existing frames covered by this same note are to be left in place to be fitted with new doors and hardware under new construction (AN)

No salvage value.

G28-RJS 2. Please confirm that there is to be no salvage of those doors, hardware and frames covered by note 2 in the AD drawings.

No salvage value.

G29-RJS 3. Please provide direction as to desire grout types at ceramic tile (i.e. cementitious, epoxy, etc.)

Epoxy

G30-RJS 4. Should crack isolation membrane be applied under tile?

G31-RJS 5. Are those finishes indicated at stair landings to be installed directly over the existing epoxy flooring?

Yes.

G32-HHI * Sheets FA-1.0 through FA-3.0 have a general note that reads “see drawing FA-0.1 for fire and mass notification system requirements.” It doesn’t appear this sheet exists. Are we to assume this is a minor typo or is there an actual FA-0.1 sheet that we are overlooking?

This should be FA-0.0 and is not in order in the drawing package it is the last FA drawing new package this will be corrected.

G33-HHI * When does the Government anticipate releasing the sign-in sheet from the August 31st site walk?

The list of attendees was sent out on 2 September from the contracting office.

G34-HHI * Is there a structural detail requirement for the footing, foundation wall and reinforcement within the foundation and CMU wall as shown Sheet MN-4.0?

See soundwall section 2 on drawing AN-7.0

G35-HHI * What is the width of the CMU block for the sound wall on Sheet MN-4.0?

The width of the CMU wall is 8”. See soundwall section 2 on drawing AN-7.0

G36-HHI * Sheet MN-4.0 shows the ACC-1 unit. In reviewing the equipment schedules in both the plumbing and mechanical sheets, it does appear that this unit is shown. Is it under a different equipment identification number? Please advise.

MN-4.0 Air Cooled Chiller ACC-1 is the same unit identified as CH-1 in the Air Cooled Chiller Schedule at bottom of plan sheet MN-5.1

G37-HHI * Sheets AD-1.0 through AD-3.0 include a note to “remove existing window blinds.” It doesn’t appear there is any requirement to replace those blinds after removal. Are new blinds part of this contract?

New window blinds are a part of this project. Provide new fabric (black) light filtering roller shades. See key note 20 on dwg. AD-1.0, see keynote 15 on dwg. AD-2.0, see keynote 18 on dwg. AD3.0 See keynotes 12 and 20 on dwg. AN-1.0, see keynotes 16 and 17 on dwg. AN-2.0 See keynote 18 on dwg. AN-3.0

G37a-HHI * If so, what make, model and color should contractors price for the window blinds?

Blindster, woven 100% polyester fabric (black), or approved equal.

G38-HHI * At locations on Levels 1, 2 and 3 where contractors will be removing windows on the north side of the building, there is a requirement for “new face brick to match existing” on Levels 1 and 2. There is no note indicating the same requirement on Level 3. We assume this is an oversight and that brick will need to be included on Level 3 as well. Please confirm.

New face brick to match existing is also required at the third floor. See note 19 on drawing AN-3.0

G39-HHI 1. Just to confirm, is the substrate concrete or wood?

All flooring substrate is concrete.

G40-HHI 2. The demo plans note #3, #5, #9 on page AD-

1.0 – AD-3.0 mentions removal of CMU block walls.

Pages AN-1.0 – AN3.0 Note #9/#10 state, “Provide self-leveling floor filler where CMU Walls were removed.

Existing ceramic floor tile to remain”.

G40a-HHI 2a. Are we to self-level only where CMU walls are to be removed? Is the existing tile to be removed? G40b-HHI 2b. Are we to self-level over the ceramic tile as well? Many of these areas are to receive new vct flooring?

In the new mechanical equipment rooms, after removing the existing cmu walls, showers and ceramic mosiac floor tile, float the floor level (Figure 1/4” new floor leveling material required.)

G40c-HHI 2c. What depth should be figured in these areas?

Please see answers above.

G41-HHI 3. In Office Rooms 1-10, 1-21, 2-12, 2-24, 3-12, & 3-23, there are key notes 6 & 4 in these rooms as well as 1,2,3,5. Was note 4 and 6 intended for the stairs?

Yes.

G42-HHI 4. Page AN-2.0, Will Conference 2 require new finishes?

Use notes 1, 2, 4, 5 and 17

G43-HHI 5. The Ramp detail A on Page AN-7.0 shows

VCT floor tile to be installed on landing and ramp over

¾” T&G plywood deck. Per the manufacturer’s recommendation, the vct should be installed over a ¼” underlayment. Please confirm this is acceptable.

Install ¼” underlayment over the ¾" T&G plywood deck.

G44-HHI 6. Carpet tile or Rubber tile (similar to the rubber tread finishes that are to be installed on the interior stair wells) would handle the flex in the wood ramp better than the rigid VCT. Please confirm whether we should price rubber tile, Carpet tile per detail B on

AN-7.0 or VCT on the Ramp and Landing detail.

Price rubber tile.

G45-HHI 1. What are the measurements from each floor, from floor to deck above? 10’- 0”

G46-HHI 2. What is the height of the acoustical ceilings on each floor? (We will have to use a different product facing where it is left exposed above the ceilings for wall type A—no drywall)

The new ceiling heights will vary depending on the size of the ductwork above the new ceilings.

G47-HHI 3. Are there any specifications for this project?

Or do I just bid what I know that it needs? (Again—the prints call out R-19 to the exterior walls, but I have to bid different facings to the fiberglass batts)

The fiberglass insulation should have must have a Kraft paper moisture barrier.

G48-HHI 4. Will they want us to use polyurethane foam around windows and doors, or just chink with fiberglass?

Chink with fiberglass.

G49-NASCO 1. Is the contractor responsible for repairing existing cracks in the foundation floor through the first floor? Please identify and quantify areas to be repaired?

G50-NASCO 2. Is the contractor responsible for repairing/patching existing cracks in the CMU walls that are not being removed? This condition happen through all floors. Please identify and quantify areas to be repaired?

The contractor shall patch cracks in the existing CMU walls prior to painting. Allow 200 LF of cracks at ¼ “wide.

Cracks occur at CMU walls at the 1st, 2nd and 3rd floors.

G51-NASCO 3. Provide a finish schedule for the CONF - 2 on AN-2.0?

Use notes 1,2,4,5 and 17.

G52-NASCO 4. Will Contractor be responsible to level the CONF - 2 floor where there is transition slope under the carpet?

Yes.

G53-NASCO 5. Will the furniture be removed by other prior to NTP being issued?

The Government will remove the furniture.

G54-NASCO 6. Sheet EP-5.0 Shows a ground bar with a counterpoise and a Concrete encased electrode. If they don’t exist at the building will they be required?

This is a typical grounding detail the intent was to connect applicable existing grounds at this ground bar, In this case building 1218 does not have a counterpoise or concrete encased electrode and they will not be required be added by this contract or need to be connected to the ground bar.

G55-NASCO 7. Drawing EP-5.0 Feeder Schedule A. 2 Parallel 4-350MCM 4” conduit for the feed from the new 750 transformer to the 1000 amps MDP would not be correct, on the existing one line demo it shows 3 sets of 4#500 in 4” conduit existing which would work, is that size existing and would it need to be changed out? Or are those two line just swapped on the drawing?

There is an error in the feeder schedule “A” should read 3 each Parallel 4-500 MCM 4” C See corrected drawing

G56-NASCO 8. EP-5.2 Fixture schedule shows Types B and C as low profile wrap around with battery backup, it appears on the drawing that the only fixtures that look like wraps are in the stairwells with battery backup , what are all the other types on all three floors that look like strips but not with battery back up? And what types are going in the mechanical room drawing on EL-4.0?

See revised drawing for light fixture type and location clarifications.

G57-NASCO 1. Are we to include Cementitious grout or

Epoxy grout at the lobby on the 1st floor?

Epoxy

G58-NASCO 2. Note #16 on AN-1.0, Is there a spec that you would like us to use for the 12”x12” Gritted

Porcelain Floor tile?

American Olean 12” x 12” x ¼" gritted floor tile or approved equal

G59-NASCO 3. B & C Fixtures show surface mounted with battery back. Are these all supposed to battery packed. I didn’t see B (2 foot) fixtures on the print. Is there a spec’d lighting for stair well fixtures?

See revised drawing for light fixture type and location clarifications.

G60-XX 1. Sheet T-0.0 Note 11 under Telecom New

Work: MTR Comms-1 states that there needs to be a

200 pair copper riser cable run from the 1st floor TR to each of the 2nd and 3rd floor TRs, however sheet TN-5.0 only show a 100 pair copper riser. Which is the correct amount to be installed 100 pair or 200 pair.

200 pair

G61-XX 2. Sheet T-0.0 Note 2 under Network Switches states that we need to provide new CISCO SFP modules and Stack cables. Is this still a requirement?

No they are not. Item removed from Drawings

G62-JBI General RFI’s 1. When does the Government antics to them being 100% For Construction or not. Is this package to be considered ready for construction?

Yes

G63-JBI General RFI’s 2. Are the SABER specifications part of this contract? They are mentioned multiple times on sheet G-0.1.

Yes

G64-JBI General RFI’s 3. Will MicroStation files of the

RFP drawings be provided to the contractor awarded the project for creation of As Builts? Will As-builts be acceptable in Autodesk?

MicroStation files of the RFP drawings will be provided to the contractor awarded the project for creation of As

Builts. As-builts shall be submitted in Micro Station.

G65-JBI General RFI’s 4. SOW Paragraph 2.6.3 calls for compliance with applicable Unified Facility Criteria without mentioning specifically which ones. The UFC's are typically used by design teams to ensure that the project drawings and specifications are created in such a way that ensure a compliant project is built if the design is followed. Asking Construction contractors to ensure compliance with unspecified UFC's implies that additional design work is required. Please clarify where additional design is required by this contract.

No additional design is required by this contract.

G66-JBI General RFI’s 5. Is it the Governments position that if a contractor follows these bid documents, as one would a road map, that an acceptable outcome will be produced?

Yes

G67-JBI General RFI’s 6. Will all furniture copiers, printers Etc. be removed by user prior to construction beginning?

Yes

G68-JBI General RFI’s 7. Has user already re-located?

Will re-location of users take significant time before demolition can begin?

The users will be relocated before the Notice to Proceed is issued.

G69-JBI General RFI’s 8. Has a life safety analysis been performed based on future occupancy and use type to determine the required egress paths door hardware and which walls need to be rated Etc? IF this analysis is expected out of the bidding contractors then this is truly a design build project and should be correctly advertised as such.

A life safety analysis has been performed.

G70-JBI General RFI’s 9. Please confirm that all asphalt torn out for install of new water lines will need to be replaced to match existing…....It may be a better value for govt. to require a whole new asphalt drive way rather than having patches throughout.

All asphalt torn out for install of new water lines will need to be replaced to match existing

G71-JBI Electrical RFI’s 1. Is ANY additional Electrical engineering required?

None should be needed

G72-JBI Electrical RFI’s 2. Prior to executing changes on drawings please "cloud" any changes and add an amendment # in a delta symbol so that bidders can easily identify the things that have changed by amendment.

Please use the re-issued drawings 03 Oct 20 that will be sent out from the Contracting Office for placing your bid.

G73-JBI Electrical RFI’s 3. B1218 sheet EL-4.0 does not show any EM lighting in the mech room. Is any EM lighting desired in Mech room?

See revised drawing add 3 each 2 lamp battery backup

EM light fixtures to basement Mech room connect to closest receptacle circuit

G74-JBI Electrical RFI’s 4. SOW 2.2.13 and 2.2.13 indicate that the FA, Lighting, Power and Comm systems will be removed. Should contractors assume this means removing all conductors and conduits/ conveyance and supports for all these systems?

Disregard statement in SOW see drawings for requirement.

G75-JBI Electrical RFI’s 5. Will electrical convenience outlets be required within 25' of each piece of outdoor mechanical equipment?

Yes per NFPA 70

G76-JBI Electrical RFI’s 6. Is NETA ATS testing of new electrical system required? IF so please provide standard by which testing would be executed

NETA ATS testing will not be required

G77-JBI Electrical RFI’s 7. Will a dedicated Red Fire

Protection Electrical panel fed from MDP by a red breaker be required for feeding the Fire detection equipment?

Yes provide a fire alarm circuit breaker with a red handle and red colored conduits as shown on FA-0.0 General note #11 and E-0.0 General note #2

G78-JBI Electrical RFI’s 8. Will fire pump be required to be fed directly from tap at transformer or from MDB as shown on EP 5.0

See revised one-line drawing

G79-JBI Electrical RFI’s 9. Are all outlets within waiting areas and break rooms required to be combination duplex and USB charger outlets? Please provide required grade for outlets as no specification exists and many outlet grades are available.

NO USB outlets will be required in this project. See E-0.0

General note #3

G80-JBI Electrical RFI’s 10. Are any combination duplex

USB outlets required in offices? This may be handy to have in office areas.

NO USB outlets will be required in offices.

G81-JBI Electrical RFI’s 11. Does new backup generator need to be placed on its own concrete pad? Will this pad need to be re-enforced? Where will the Backup generator be located on the site?

No backup generator will be required per Fort Carson

Electric and Fire AHJ

G82-JBI Electrical RFI’s 12. SOW paragraph 2.8.7 calls for removal of MDP unused feeders, transformers and panels. Does this also include all conveyance through which the feeders ran?

See Drawing E-0.0 for electrical conduit or wiring demo guidance disregard SOW statement.

G83-JBI Electrical RFI’s 13. SOW 2.8.11 Calls for removal of power feeders, lightning, controls and communications throughout building. Does this include all conveyance I.E. Conduit and cable tray/ cable hooks etc.?

See Drawing E-0.0 for electrical conduit or wiring demo guidance disregard SOW statement.

G84-JBI Electrical RFI’s 14. In order to anticipate total number of dedicated circuits for break room permanent device (Microwave, Stove, Refrigerators, dishwashers etc.) Please provide an exact number per break room.

SOW states "…....and any other permanent device" Must be on their own circuit. This should not be left for contractors to guess at. Please simply provide the number of dedicated circuits and amperage per break room. Are all of these anticipated and shown on panel schedules?

See drawing for electric for circuits disregard SOW statement.

G85-JBI Electrical RFI’s 15. SOW 2.8.20 Calls for both data and power to be provided at all TV locations. What is intended by "data" is this a single cox cable? HDMI?

Other? What is the conduit size and box requirements for this? Where will each of these be fed from?

All CATV cables will be routed to Nearest Telecom Room and 10” loop on wall as stated in Ft Carson RNEC design guide.

See drawings disregard SOW statement.

G86-JBI Electrical RFI’s 16. Please complete the mechanical equipment schedule on sheet EP-5.1 to include missing equipment. The chart for the equipment that is listed is not completed with all pertinent information. The AHUs, boilers, glycol feeder, chemical feeder, sump pumps, jockey pump, need to be added and not all of the exhaust fans are listed.

Mechanical schedule has been revised see updated drawing and refer to mechanical drawings for additional information.

G87-JBI Electrical RFI’s 17. Please complete the load data information on the panel schedules.

Provided circuit as shown on drawing Government has taken Load data into consideration during design

G88-JBI Electrical RFI’s 18. Please add AHU-7 to the

Electrical panel schedules.

AHU numbers have been added to the electric drawings sheets

G89-JBI Electrical RFI’s 19. Please indicate the AHU’s on the EP sheets.

AHU numbers have been added to the electric drawings sheets

G90-JBI Electrical RFI’s 20. Please indicate the conference rooms that require dimming in regard to keynote #2 on sheet EL-1.0. we couldn’t find the keynote #2 referenced on any of the EL sheets.

Drawing EL-1.0 and EL2.0 Drawing show dimmer and dimming relay packs, See revised drawing to dimming identify zones.

G91-JBI Electrical RFI’s 21. Please include the existing load data for panel EMP that is to remain.

Refeed 100A as shown on drawing no other load data needed.

G92-JBI Electrical RFI’s 22. Please add missing mechanical equipment to the Electrical panel schedules.

Supply and return fans for AHU’s, if not a single point of connection, all sump pumps (EP-4.0 indicates a 2nd sump pump), all exhaust fans, glycol feeder, CP-1&2, BP-

1&2, HWP-1

Refer to the re-issued drawings that will be sent out from the Contracting Office for placing your bid.

G93-JBI Electrical RFI’s 23. "Are the AHU circuit breaker sizes depicted in the panel schedules correct to include supply and return fans? The sizing given is not consistent."

See revised drawing circuit breaker information has been updated on drawings.

G94-JBI Electrical RFI’s 24. Is all Comm above lid to be run in cable tray? Or are J hooks and acceptable method?

Cable tray only as stated on drawings

G95-JBI Electrical RFI’s 25. Is a backup generator required for feeding the fire pump as shown on FN 4.0?

Please note that no backup generator or associated switching is not shown on electrical one line. Please provide standard by which this backup generator would be tested? Load bank? Etc. Properly edited UFGS specifications would have all of this information.

No backup generator will be required per Fort Carson

Electric and Fire AHJ

G96-JBI Electrical RFI’s 26. Does backup generator feed only the Fire pump and jockey pump in case of power loss or are other devices associated with fire protection to be backed up by this generator?

No backup generator will be required per Fort Carson

Electric and Fire AHJ

G97-JBI Electrical RFI’s 27. What size should the backup generator be? Should the generator be diesel powered or other? It is exceedingly rare to price a backup generator without an associated Specification

No backup generator will be required per Fort Carson

Electric and Fire AHJ

G98-JBI Electrical RFI’s 28. Do existing lights need to have the lamps and ballasts removed and recycled? Can these items be recycled on base?

Contractor shall be responsible for proper disposal

G99-JBI Electrical RFI’s 29. Please add backup generator and associated switching to the One line diagram.

No backup generator will be required per Fort Carson

Electric and Fire AHJ

G100-JBI Electrical RFI’s 30. Have all mechanical equipment circuits been calculated and included in the electrical panel schedules?

See revised drawing, Missing HVAC and various other circuits have been added.

G101-JBI Electrical RFI’s 31. Will automatic door openers scheduled on door schedule require an electrical circuit? None is shown in electrical sheets

Electric circuits for ADA door openers circuits have been added to the drawing sheet EP-1.0 all door opener equipment and push buttons will be included in this contract.

G102-JBI Electrical RFI’s 32. Please provide the correct size/parallel quantity for building feeder A on sheet EP-

5.0. We believe that what is indicated is not sufficiently

sized for new electrical load.

See revised drawing sheet EP-5.0 ONE-LINE DRAWING

G103-JBI Electrical RFI’s 33. Please provide the breaker size for the fire pump fed from the MDP shown on sheet

EP-5.0. MDP shows a space for the fire pump rather than a properly sized breaker. See updated Electrical

Drawings.

G104-JBI Electrical RFI’s 34. Please confirm that the

750KVA transformer listed on sheet EP-5.0 is sufficient and correctly sized for the building.

Government has determined that 750Kva is sufficient base on known loads and assumptions and service calculations. The existing transformer shall remain government property and shall be returned to the DPW

Base operations contractor storage lot by the construction contractor.

G105-JBI Electrical RFI’s 35. Please provide the feeder size for the fire pump shown on sheet EP-5.0.

See revised drawing EP-5.0

G106-JBI Electrical RFI’s 36. Will an arc flash coordination study be required for the electrical system?

IF so please provide a standard by which this should be performed. Please note this requires help of an electrical engineer to produce calcs.

NO arc flash coordination study will be required as part of this contract.

G107-JBI Electrical RFI’s 37. Is a lightning protection system required for the building?

No LPS system will be required in this project.

G108-JBI Comm RFI’s 1. Prior to executing changes on drawings please "cloud" any changes and add an amendment # in a delta symbol so that bidders can easily identify the things that have changed by amendment.

Please use the re-issued drawings that will be sent out

G109-JBI Comm RFI’s 2. Sheet T-0.0 Note 11 under

Telecom New Work: MTR Comms-1 states that there needs to be a 200 pair copper riser cable run from the

1st floor TR to each of the 2nd and 3rd floor TRs, however sheet TN-5.0 only show a 100 pair copper riser.

Which is the correct amount to be installed 100 pair or

200 pair.

Drawing have been corrected to 200 pair

G110-JBI Comm RFI’s 3. Sheet T-0.0 Note 2 under

Network Switches states that we need to provide new

CISCO SFP modules and Stack cables. Is this still a requirement?

Items have been removed from Notes

G111-JBI Comm RFI’s 4. Please confirm that lockable

User Drop Boxes are not required for the SIPRNet drops within SIPR Café 3‐19?

Install as shown. No PDS is used.

G112-JBI Comm RFI’s 5. Please confirm that the

Telecommunications contractor is responsible for the installation of Government furnished network switches, and contractor furnished patch cords?

Items have been removed

G113-JBI Comm RFI’s 6. Please confirm that the

Telecommunications contractor is responsible for furnishing the CISCO parts (SFP Modules and Stacking

Cables) listed on drawing T‐0.0?

Items have been removed refer to reissued drawings

G114-JBI Fire Alarm RFI’s 1. Prior to executing changes on drawings please "cloud" any changes and add an amendment # in a delta symbol so that bidders can easily identify the things that have changed by amendment.

Please use the re-issued drawings that will be sent out from the Contracting Office for placing your bid.

G115-JBI Fire Alarm RFI’s 2. Will egress lighting on motion sensors be required to be activated by the Fire alarm through use of Emergency lighting control modules?

NO

G116-JBI Fire Alarm RFI’s 3. Does the requirement for a

FPE review extend to Re-design of the Fire detection system? Can bidders assume that what is shown will comply with requirements or is this project really a design build as it relates to the Fire detection? IF this is a design build please outline the design submittal requirements.

See drawing set notes on FA-0.0 general note 2 on FA-

1.0 the drawing set is a general layout but must be completed by a FPE or NICET Level 4 technician who will verify compliance adjust devices locations and quantities and then get approval from Fort Carson Fire Dept.

G117-JBI Fire Alarm RFI’s 4. Will a full fire alarm control matrix be required to show all output functions? None is included in this bid package. Will this matrix need to show outputs to turn on egress lighting in egress paths when FA is activated. This requires additional electrical engineering and inclusion of lighting control modules which are not shown in this package?

No fire alarm control of lighting only mandatory elevator monitoring and recall.

G118-JBI Fire Alarm RFI’s 5. Will Text Display Boards will be required in order to comply with UFC 4-021

Engineering Change Bulletin 2018-17, and if so, at what locations will they be required?

LED text notification signs are shown at various exit locations on drawings additional may be needed based on FPE or NICET IV design shop drawings. They must be included in the 48 hour battery load calculations.

G119-JBI Fire Suppression RFI’s 1. Are the services of a licensed Colorado fire protection Engineer required to review and stamp exclusively and only the fire

Suppression scope of work?

Yes, and Fire suppression drawings.

G120-JBI Fire Suppression RFI’s 2. Prior to executing changes on drawings please "cloud" any changes and add an amendment # in a delta symbol so that bidders can easily identify the things that have changed by amendment.

Please use the re-issued drawings that will be sent out from the Contracting Office for placing your bid.

G121-JBI Fire Suppression RFI’s 3. Will new Fire sprinkler service line and domestic water line north of building require cathodic protection on any steel parts or accessories buried? This is required by the Ft Carson

Installation Design guide but not called out in design.

Yes, the new lines will require cathodic protection on any steel parts or accessories buried as per the Ft Carson

Installation Design guide.

G122-JBI Fire Suppression RFI’s 4. Please provide assumed residual water pressures available where new fire line will tie in. Although this RFP calls for a new Fire pump the size of such fire pump is not provided, nor can it be estimated without the requested Data. If this data is unavailable please provide assumed pressures at tie in point.

Drawing FN 5.0 displays the flow test data for the flow hydrant 1 and test hydrant 1.

G123-JBI Fire Suppression RFI’s 5. SOW 2.6.4 calls for inclusion of permits and licenses inspections and fees by authorities having jurisdiction. Who, other than Ft

Carson Fire Dept., have jurisdiction over fire protection systems on Ft Carson? Does Ft Carson Fire Dept. charge for permits?

The Fort Carson Fire Department is the authority having jurisdiction over fire protection systems on Fort Carson.

G124-JBI Fire Suppression RFI’s 6. SOW 2.6.5 states that is the contractors responsibility to make hydraulic calculations for new fire 6. SOW 2.6.5 states that is the contractors responsibility to make hydraulic calculations for new fire suppression system. This is impossible unless Govt. Provides flow test results from the line where the new fire line will tie in. Govt. Could also provide bidders with assumptions of those pressures so that bidders price this work apples to apples.

Drawing FN 5.0 displays the flow test data for the flow hydrant 1 and test hydrant 1. Refer to response to question G122.

G125-JBI Fire Suppression RFI’s 7. SOW 2.6.6 Calls for sprinkler calcs to be prepared under the responsible charge of a Fire protection Engineer licensed in the state of Colorado. IS the fire suppression the only part of the design that should be reviewed and verified by FPE?

Typically an FPE would look at the entirety of the fire protection including fires suppression, Detection, Egress and fire separations. Is this desired?

Only the fire suppression system will need to be reviewed and verified by a Colorado licensed FPE.

G126-JBI Fire Suppression RFI’s 8. SOW 2.7.1 Required contractors to hire a Colorado Licensed Fire Protection

Engineer for the creation of a complete Fire Detection system. However, Sheet FA sheets call for exact device quantities and locations to be determined by the Fire

Protection Engineer OR NICET level iv Tech. Please clarify which of these individuals is ultimately responsible for a compliant system. IF Ft Carson desires the review of a licensed FPE the word OR needs to be removed as this implies the contractor has an option to use an FPE OR a

NICET level iV. These two individuals are not of equal expertise.

The fire alarm mass notification system can be designed by a fire protection engineer or certified NICET level iv

Tech. Refer to FA General notes drawing sheet.

G127-JBI Fire Suppression RFI’s 9. Is a nitrogen generator required for the dry type suppression system at the elevator? Should this Nitro generator be fed from a dedicated Fire protection electrical panel

Yes, the dry pipe suppression system will need a nitrogen generator, compressor, and nitrogen storage tank. Provide circuit as shown on EN-4.0

G128-JBI Fire Suppression RFI’s 10. Is Fire Pump required to be housed in a separate room or outbuilding?

The fire pump should be located in the Basement

Mechanical room.

G129-JBI Fire Suppression RFI’s 11. What is the size of the fire pump required?

The size of the fire pump will be determined by the fire protection engineer. For bidding purposes assume a

500gpm @75 psi 30HP vertical electric inline pump.

G130-JBI Fire Suppression RFI’s 12. Is a combination fire pump/ATS required?

NO ATS required

G131-JBI Fire Suppression RFI’s 13. Is a separate power feed from the transformer required for the fire pump or can it be fed from the MDP as shown?

No separate power feed from the transformer will be required for the fire pump. see MDB revised one-line drawing showing separate fire service enclosure in MDB

G132-JBI Mechanical RFI’s 1. Is ANY additional mechanical engineering required?

Not anticipated unless contractor decides to use equipment other than the design basis

G133-JBI Mechanical RFI’s 2. Prior to executing changes on drawings please "cloud" any changes and add an amendment # in a delta symbol so that bidders can easily identify the things that have changed by amendment.

Please use the re-issued drawings -September date- that will be sent out from the Contracting Office for placing your bid.

G134-JBI Mechanical RFI’s 3. SOW Mechanical paragraph 2.5.1 states that all equipment shall meet Ft

Carson Installation design guide. Was this documents part of the solicitation package? Can it be provided to bidders?

Link to Fort Carson Installation Design Guide https://www.carson.army.mil/assets/docs/dpw/installat ion-design-guide.pdf

G135-JBI Mechanical RFI’s 4. Please provide specific requirements for the Test and Balance of the mechanical system. Shall all new mechanical equipment and systems be tested? What are the required qualifications of the testing firm? Shall this testing be done by a party independent of the installing contractor?

All new Mechanical and Hydronic equipment test and balance shall be by ICB/TABB or NEBB Certified

Professionals. Testing shall be independent of installing contractor.

G136-JBI Mechanical RFI’s 5. Project drawing M-0.0, mechanical general note 11 calls for new fire dampers to be 1 ½ hr. rated unless noted otherwise noted. Please indicate where fire dampers are required as none can be discerned from drawings. Or are the locations of these to be determined by a Colorado licensed FPE thus making the mechanical scope also Design Build? Fire

Dampers shall be at all duct floor penetrations and

Mechanical Room wall and floor penetrations.

G137-JBI Mechanical RFI’s 6. Please indicate where hydronic fin tube heaters mounted to exterior wall are located. General notes exist on Mechanical Demo sheets however they appear to only show a small fraction of the actual wall mounted fin tube heaters that were https://www.carson.army.mil/assets/docs/dpw/installation-design-guide.pdf https://www.carson.army.mil/assets/docs/dpw/installation-design-guide.pdf observed on nearly every exterior wall within the building. Please clarify extend of fin tube radiant heater demolition required as it is vastly underrepresented in drawings.

Provide As-Builts of existing Hydronic heat locations.

G138-JBI Mechanical RFI’s 7. Please clarify that number of VAV's shown in the VAV schedule is the correct number….....most most VAV's are not indicated or identified in the field.

Qty is correct and VAV schedule has been revised

G139-JBI Mechanical RFI’s 8. Have the basis of design new air handling unit locations been confirmed to allow for adequate maintenance and service clearance?

Yes

G140-JBI Mechanical RFI’s 9. Typical HVAC floor plan note 1, on “MN” drawings states all rectangular duct shall have 1.5” closed cell insulation. Does this apply only to supply air ductwork?

NOTE HAS BEEN CHANGED TO:

REMARKS: ALL SUPPLY DUCT FROM AHU TO VAV SHALL

BE LINED WITH 1.5" CLOSED CELL FOAM DUCT LINER.

ALL OTHER DUCT IN THE MECHANCAL ROOM AND

DOWNSTREAM OF VAV CAN BE WRAPPED WITH R-6

FIBERGLASS INSULATION.

G141-JBI Mechanical RFI’s 10. Drawing MN-4.0, shows new ACC-1 on concrete pad. Equipment schedule page

MN-5.1 lists new chiller as CH-1. Please clarify the ACC-1 equipment nomenclature.

ACC-1 and CH-1 are the same unit.

Will change plans to CH-1

G142-JBI Mechanical RFI’s 11. What level of commissioning is required for new HVAC systems and equipment?

Per UFC 3-410-01

3-7.15 Commissioning Requirements:

“Commissioning must be provided as required by UFC 1-

200-02. After the successful completion of the Test and

Balance activities and prior to final acceptance of the

HVAC systems, provide a minimum of four days of trends measured with data loggers or from the Building

Automation System (BAS) while the equipment is in full automatic mode to ensure that all systems are working properly under all conditions. Include the following trending requirements:

• Points to be trended must be the same or similar to

App. D, Minimum Control Points List.

• Data points must be at the same time increment.

• Provide trends in graphic format.

• Clearly identify all trend data. “

G143-JBI Mechanical RFI’s 12. Please indicate where fire dampers are needed. Drawings to not indicate any rated wall assemblies. Which would require a fire damper

Fire Dampers shall be at all duct floor penetrations and

Mechanical Room wall and floor penetrations.

G144-JBI Mechanical RFI’s 13. Please clarify if additional transfer air ducts are required in each room to hallway or if the existing transfers are to be utilized.

Transfer ducts are shown from rooms to hallway with ceiling return grilles. Sheets MN-1.0 MN-2.0 MN-3.0

G145-JBI Mechanical RFI’s 14. Please clarify if duct size shown is intended as inside clear space inside duct dimension or outside duct dimension.

Duct sizes are inside clear dimensions.

G146-JBI Mechanical RFI’s 15. Sheets MN-1.0 and MN-

3.0 show hydronic piping to all VAV's on 1st and 3rd floor. However, Sheet MN-2.0 does not show hydronic piping to VAV's on 2nd floor. Please clarify if this piping is required by this contract or if this piping will be by others.

Piping will be shown on drawing MN-2.0

G147-JBI Mechanical RFI’s 16. Please provide Pipe type and size requirement for Hydronic hot water. As none is shown. Is material required to be either steel or copper?

Piping type L copper, soldered joints and fittings ½"-2” and 2 1/2” and larger shall be steel with welded joints and fittings.

G148-JBI Mechanical RFI’s 17. Please provide pipe type for chilled water from ACC-1 into mech room. If HDPE pipe required please provide gasket type and bolt type and torque to be used at flange connections. See PPI TN-

38.

HDPE pipe, installed per manufacturers recommendations.

G149-JBI Mechanical RFI’s 18. Please clarify air duct insulation requirement. SOW 2.5.4 calls for all air duct outside the fan coil unit to be wrapped in 1" blanket insulation. However, sheet MN-5.0 calls for all rectangular duct to be lined with 1.5" CLOSED CELL insulation. Please provide basis of design for closed cell duct liner. and clarify which note applies.

NOTE HAS BEEN CHANGED TO:

REMARKS: ALL SUPPLY DUCT FROM AHU TO VAV SHALL

BE LINED WITH 1.5" CLOSED CELL FOAM DUCT LINER.

ALL OTHER DUCT IN THE MECHANCAL ROOM AND

DOWNSTREAM OF VAV CAN BE WRAPPED WITH R-6

FIBERGLASS INSULATION.

G150-JBI Mechanical RFI’s 19. Shall Plumbing serving 1st floor restroom be abandoned in place plugged and left exposed in new mech room?

Demo and remove first floor restroom plumbing above

Basement Mechanical Room.

G151-JBI Mechanical RFI’s 20. Drawing sheets MN1.0 and MN3.0 are missing hydronic pipe sizes. Please provide

Piping sizes will be added

G152-JBI Mechanical RFI’s 21. Drawing sheet MN2.0 is missing hydronic piping and sizing. Please verify that piping is required on 2nd floor and provide pipe sizing.

Piping and size will be added

G153-JBI Mechanical RFI’s 22. Sheet PN 4.0 shows only

1 sump pit and associated pump.