RELEASED AMENDMENT W911RZ-20-B-0001-0005.pdf

PDF 592 KB Posted

Attached to
DPW15-123 Interior Improvement B1218
Solicitation number
W911RZ-20-B-0001
Issued by

About this file

This amendment modifies a solicitation for the renovation of Building 1218 at Fort Carson, Colorado. The solicitation is revised to include two statements of work, one for renovation and one for furniture relocation. Additional documents such as drawings, submittal registers, and RFI responses are also incorporated. The period of performance is extended from 360 to 375 days. The contract line item for the renovation work is modified to reference both statements of work. The bid opening date is changed to November 10, 2020 at 1:00 PM at a specified outdoor location on the base due to COVID-19 restrictions. Requests for information must be received by October 23.

View the file

Other files

File Type Posted
RELEASED AMENDMENT 0007 20-B-0001-0007 .pdf PDF
GENERAL WAGE DECISION BUILDING CO20200022 MODIFICATION 4 10-30-2020.pdf PDF
AMENDMENT 6 DPW15-123 furniture inventory B1218.pdf PDF
AMENDMENT 6 DPW15-123 REVISED SOW 1 B1218 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 Answers bidders questions B1218 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 B 1218 DRAWING COLOR 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 LATEST SOW 2 FURNITURE MOVE B1218.pdf PDF
RELEASED AMENDMENT 20-B-0001-0006.pdf PDF
AMENDMENT 6 DPW15-123 NEC DESIGN SUPPLEMENTAL Aug 2019 update.pdf PDF
AMENDMENT 6 DPW15-123 REVISED Submittal Register 27 OCT 2020.xls XLS spreadsheet
AMENDMENT 6 DPW15-123 B 1218 DRAWING GRAYSCALE 27 OCT 2020.pdf PDF
RFI Responses for B1218 3 OCTOBER 2020.pdf PDF
REVISION DPW15-123 RPR B1218 DWG GRAYSCALE 3 OCT 2020.pdf PDF
REVISION Submittal Register 3 OCTOBER 2020.xls XLS spreadsheet
SOW 2 Furniture Move B1218 7 OCTOBER 2020.pdf PDF
REVISION DPW15-123-RPR B1218 DWG COLOR 3 OCT 2020.pdf PDF
ATTACHMENT FOR SOW 2 furniture inventory B1218 7 OCTOBER .pdf PDF
ATTACHMENT FOR SOW 2 BLDG 1218 - 2nd Floor plan - 7 OCT 2020 .pdf PDF
NEW B1218 Asbuilts Combined 3 OCTOBER 2020.pdf PDF
REVISION SOW 1 B1218 2 OCTOBER 2020.pdf PDF
ATTACHMENT FOR SOW 2 BLDG 1218 - 3rd Floor plan - 7 OCT 2020.pdf PDF
20-B-0001-0004 solicitation amendment.pdf PDF
WAGE DECISION CO20200022 BUILDING 8-28-2020.txt TXT text file
Bid Opening location W911RZ-20-B-0001.pdf PDF
W911RZ-20-B-0001-0003 amendment.pdf PDF
WAGE DECISION CO20200008 8-28-2020 HIGHWAY.txt TXT text file
RELEASED SOLICITATION 20-B-0001-0002.pdf PDF
DPW15-123 SOLICITATION MOD SF30.pdf PDF
Fort Carson COVID Travel and Leave Business Rules Smart Card 4AUG20.pdf PDF
Fort Carson Form 2036 March 2020.pdf PDF
RELEASED SOLICITATION 20-B-0001.pdf PDF
Wage Decision Number CO20200022 january 2020.docx DOCX document
DPW15-123-RPR RENOVATION BLDG 1218 DRAWING COLOR.pdf PDF
AT-OPSEC Cover Sheet (Interior improvements for B1218).pdf PDF
2015_B1218_FINAL_Report_Short Version.pdf PDF
SOW B1218 2 June 2020.pdf PDF
Submittal Register.xls XLS spreadsheet
DPW15-123-RPR RENOVATION BLDG 1218 DRAWING GRAYSCALE.pdf PDF
DRAFT 20-B-0001 SUN AUG 16 245PM.pdf PDF
2020-223mg_REC_DPW15-123.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DPW15-123

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THIS AMENDMENT ADDS A NEW STATEMENT OF WORK (SOW #2) FOR FURNITURE RELOCATION AND PROVIDES CHANGES TO THE EXISTING STATEMENT OF WORK, SPECIFICATIONS AND / OR DRAWINGS. THIS AMENDMENT ALSO PROVIDES OTHER CHANGES TO THE

SOLICITATION TO INCLUDE A BID OPENING DATE CHANGE.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Oct-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911RZ20B0001

X 9B. DATED (SEE ITEM 11)

19-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Oct-2020

CODE

MICC - FORT CARSON-

1676 EVANS ST

ISSUING OFFICE

FORT CARSON CO 80913

W911RZ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911RZ20B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

CONTINUATION SHEET

A. THE FOLLOWING IS A LIST OF DOCUMENTS THAT ARE REVISED OR ARE NEW DOCUMENTS

AND ALL ARE INCORPORATED INTO THIS SOLICITION.

1. REVISION SOW #1 B1218 2 OCTOBER 2020

2. REVISION DPW15-123 RPR B1218 DWG GRAYSCALE 3 OCT 2020

3. REVISION DPW15-123 RPR B1218 DWG COLOR 3 OCT 2020

4. REVISION Submittal Register 3 OCTOBER 2020

5. NEW B1218 As-built dwgs Combined 3 OCTOBER 2020

6. RFI Responses for B1218 3 OCTOBER 2020

7. NEW. SOW #2 Furniture Move B1218 – 7 OCTOBER 2020

8. NEW. ATTACHMENT FOR SOW #2 BLDG 1218 – 2nd Floor Plan – 7 OCT 2020

9. NEW. ATTACHMENT FOR SOW #2 BLDG 1218 – 3rd Floor Plan – 7 OCT 2020

10. NEW. ATTACHMENT FOR SOW #2 BLDG 1218 – furniture inventory B1218 7 OCTOBER 2020

B. RESPONSE TO A SEPARATE QUESTION THAT WAS RECEIVED:

QUESTION: Can you clarify electrical demo in this coming amendment? The plans just show it x’ed out.

Also electrical lighting plans show the fixture per the key but does not identify emergency.

RESPONSE: The electric demo is the entire building except for the Elevator equipment and is shown by cross hatch on the demo drawing. The light fixture emergency battery are shown on the EL lighting drawing sheets light fixture symbol with a 4 line hatch symbol in the corner of the fixture. All Unified Facilities Criteria (UFC) are available on line at the Wbdg.org web site.

C. ANY REQUESTS FOR INFORMATION (RFI’s) CONCERNING THESE ADDITIONS OR CHANGES

MUST BE RECEIVED BY THIS OFFICE NO LATER THAN 5:00PM, OCTOBER 23, 2020.

D. THE CONTRACT LINE ITEM NUMBER (CLIN) 0001 DESCRIPTION HAS CHANGED. (See CLIN change in this amendment)

E. CHANGE OF BID OPENING DATE:

BLOCK 13 A OF THE STANDARD FORM 1442 IS CHANGED TO READ AS FOLLOWS:

“SEALED OFFERS IN ORIGINAL AND (1) COPY TO PERFORM THE WORK REQUIRED ARE DUE AT

THE PLACE SPECIFIED IN ITEM 8 BY 1:00 PM NOVEMBER 10, 2020 (date and local time). IF THIS IS A

SEALED BID SOLICITATION, OFFERS WILL BE PUBLICLY OPENED AT THAT TIME. SEALED

ENVELOPES CONTAINING OFFERS SHALL BE MARKED TO SHOW THE OFFEROR’S NAME AND

ADDRESS, THE SOLICITATION NUMBER, AND THE DATE AND TIME OFFERS

ARE DUE.”

F. THE FOLLOWING INFORMATION FOR BLOCK 8 OF THE STANDARD FORM 1442 IS REPEATED

FROM AMENDMENT 0003 FOR OFFERORS AWARENESS.

“IF OFFER IS MAILED, MAIL TO: MICC FORT CARSON,

1676 EVANS STREET, BUILDING 1220, 3RD FLOOR, ROOM 327A, FORT CARSON

CO 80913. MAILED OFFERS MUST BE RECEIVED NO LATER THAN THE DATE

AND TIME IDENTIFIED IN BLOCK 13A OF THE STANDARD FORM 1442. DUE TO

COVID19, THE LOCATION FOR THE BID OPENING WILL BE NEXT TO THE

“”STATUE OF KIT CARSON ASTRIDE A HORSE”” WEST OF THE VISITORS

CENTER BUILDING 6012, OFF OF THE ENTRANCE TO FORT CARSON GATE 1.

THE BID OPENING WILL BE OUTDOORS. THIS LOCATION DOES NOT REQUIRE

SPECIAL SECURITY ACCESS PERMISSIONS. THIS LOCATION IS THE FIRST

RIGHT TURN OFF OF THE ENTRANCE TO FORT CARSON GATE 1 FROM

COLORADO HIGHWAY 115. ALL TIMELY RECEIVED BIDS WILL BE OPENED AT

THIS LOCATION. ALL HAND CARRIED BIDS FOR THE BID OPENING MUST BE

RECEIVED AT THIS LOCATION NO LATER THAN THE DATE AND TIME CITED

IN BLOCK 13 OF THE STANDARD FORM 1442.”

G. The language in BLOCK 11 OF THE STANDARD FORM 1442 IS CHANGED FROM: “The Contractor shall begin performance within 10 calendar days and complete it within 360 days after receiving “ TO “The Contractor shall begin performance within 10 calendar days and complete it within 375 days after receiving “

H. REMINDER: OFFERORS, PLEASE ENSURE YOU ACKNOWLEDGE RECEIPT OF ALL AMENDMENTS

WITH THE SUBMISSION OF BIDS (REFERENCE STANDARD FORM 30, BLOCK 11).

SECTION 00 10 00 - SOLICITATION

The contractor period of performance end date has increased by 15 days from 360 days to 375 days.

CLIN 0001

The CLIN extended description has changed from:

Project is for the renovation of Building 1218, Project number DPW15-123. The Contractor shall furnish all labor, equipment, supplies and materials, and perform all operations necessary to accomplish the work in accordance with the Specifications, Statement of Work, drawings and other enclosures.

To:

Project is for the renovation of Building 1218, Project number DPW15-123. The Contractor shall furnish all labor, equipment, supplies and materials, and perform all operations necessary to accomplish the work in accordance with the Specifications, Statements of Work, drawings and other enclosures. There are two (2) Statements of Work.

Contractor shall price all work under this Line Item

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 375 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

1. REVISION SOW #1 B1218 2 OCTOBER 2020

2. REVISION DPW15-123 RPR B1218 DWG GRAYSCALE 3 OCT 2020

3. REVISION DPW15-123 RPR B1218 DWG COLOR 3 OCT 2020

4. REVISION Submittal Register 3 OCTOBER 2020

5. NEW B1218 As-built dwgs Combined 3 OCTOBER 2020

6. RFI Responses for B1218 3 OCTOBER 2020

7. NEW. SOW #2 Furniture Move B1218 – 7 OCTOBER 2020

8. NEW. ATTACHMENT FOR SOW #2 BLDG 1218 – 2nd Floor Plan – 7 OCT 2020

9. NEW. ATTACHMENT FOR SOW #2 BLDG 1218 – 3rd Floor Plan – 7 OCT 2020

10. NEW. ATTACHMENT FOR SOW #2 BLDG 1218 – furniture inventory B1218 7 OCTOBER 2020

11. AT-OPSEC COVER SHEET

12. 2015_B1218_FINAL_REPORT_SHORT VERSION

13. 2020-223MG_REC_DPW15-123

14. FORT CARSON FORM 2036-E

15. 4ID & FORT CARSON COVID TRAVEL & LEAVE BUSINESS RULES SMART CARD

(End of clause)

(End of Summary of Changes)