This document is a Record of Environmental Consideration (REC) for a renovation project at Building 1218 at Fort Carson, Colorado. The project involves removing the existing hydronic heating system and replacing it with a new gas-fired HVAC system, replacing plumbing fixtures and toilet partitions, removing and replacing suspended ceilings and lighting, installing a new fire detection and suppression system, abating asbestos-containing materials, replacing carpet and interior walls, improving perimeter walls with new studs and drywall with insulation, and adding additional electrical outlets and voice/data drops. The REC identifies potential environmental impacts including asbestos, stormwater, cultural resources, and wildlife. It determines the project qualifies for a categorical exclusion under sections addressing utility systems and routine building maintenance. Required coordination and mitigation measures are specified for air quality, wastewater, asbestos, stormwater, and other areas.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECORD OF ENVIRONMENTAL CONSIDERATION
NEPA / PROJECT #
/ 2020-223mg DPW15-123
DATE
5/28/2020
PREPARED BY
MARCUS GRAY 719.526.2752
SECTION I – PROPONENT INFORMATION
1. TO (Proponent Name) Jim Schloss
2. ORGANIZATION
DPW
2a. TELEPHONE # 719-526-9214
3. TITLE OF PROPOSED ACTION
Renovation Project, Bldg. 1218, Fort Carson
4. NEED FOR ACTION
To complete major repairs.
5. BRIEF DESCRIPTION OF PROPOSED ACTION
Renovation Project, Bldg. 1218, Fort Carson. Remove the existing hydronic heating system and replace with a new gas fired HVAC forced air system. Remove the existing plumbing fixtures and toilet partitions throughout the building and replace with new plumbing fixtures and toilet partitions. Remove the existing suspended ceilings and replace with new suspended ceilings with new LEED lighting. Install a new fire detection and fire suppression system. Abate asbestos containing materials. Remove existing carpet and replace with new carpet tiles. Paint all interior walls. Improve the existing perimeter walls with new 6” metal studs and ½’ drywall with new R-19 insulation between the studs Install
SECTION II – ENVIRONMENTAL SURVEY
(Checked boxes indicate potential environmental effects, including cumulative effects, and have mitigation / legal requirements).*
*See attached Mitigation / Legal Requirements for details Mitigation Required Coordination Required
6. Air (emissions, attainment status, etc)
7. Asbestos/Lead/Toxics
8. AST/UST/Spill
9. Cultural Resources
10. Forestry & Urban Forestry
11. IRP
12. Invasive Plants & Pest Management
13. RCRA
14. Stormwater (soil erosion, detention ponds, etc.)
15. Water Resources (watersheds, wetlands, Sec 404)
16. Wastewater
17. Wildlife
18. Other (see block 37)
SECTION III – PRELIMINARY PROJECT DATA
(For Internal Use Only - NEPA Checklist for Record of Environmental Consideration)
THE PROPOSED ACTION: YES NO If yes, list mitigation options (if applicable)
19. Is adjacent or near a waterway (ditch, stream, wetland, etc.)
20. Is over 1 acre in size (include entire footprint and/or ground disturbance)
21. Is over 5 acres in size (include entire footprint and/or ground disturbance)
22. Is site on undisturbed ground
23. Has trees within the area
24. Has noxious weeds/invasive species in the vicinity
25. Has prairie dog colonies or other known wildlife habitat
26. Requires additional use of airspace
27. Affects traffic on-post or off-post
28. Involves construction and/or demolition of facilities
29. Has the potential to generate fugitive dust
30. Will generate hazardous waste
31. Is sited within a floodplain
32. Has potential for a high level of public controversy
33. Will cause a change in land use
SECTION IV - ENVIRONMENTAL ANALYSIS DETERMINATION
34. The proposed action conforms to the Categorical Exclusion (CX) screening criteria in 32 CFR 651.29, for determining when to use a CX. The following CX (listed in 32 CFR Appendix B to Part 651, Section II - List of CXs) encompasses the proposed action:
OR
Proposed action previously reviewed in an EA or EIS (see block 35 for reference) e(2) Acquisition, installation, and operation of utility and communication systems, mobile antennas, data processing cable and existing right-of-way, easement, distribution systems, and/or facilities.
g(1) Routine repair and maintenance of buildings, airfields, grounds, equipment, and other facilities. Examples include, but not limited to: Removal and disposal of asbestos-containing material (i.e. roof material and floor tile) or lead-based paint in accordance with applicable regulations; removal of dead, diseased, or damaged trees; and repair of roofs, doors, windows, or fixtures.
35. TITLE AND DATE OF THE EA OR EIS REFERENCED:
36. Proposed action does not qualify for a CX; further environmental analysis is required
SECTION IV – ENVIRONMENTAL ANALYSIS DETERMINATION
AD :
PROPONENT (Name and Title)
ENVIRONMENTAL DIVISION
CERTIFICATION (Name and Title)
E IRONMENTAL DIVISION CHIEF,
DIRECTORATE OF PUBLIC WORKS
JAFARZADE
H.FARAMARZ
.M.151208889
Digitally signed by
JAFARZADEH.FARA
MARZ.M.151208889
Date: 2020.05.28 16:17:18 -06'00'
RIVERO-
DEAGUILAR.
CARLOS.125
6627236
Digitally signed by
RIVERO-
DEAGUILAR.CARLO
S.1256627236 Date: 2020.06.02 09:58:40 -06'00'
F. JEFF JAFARZADEH
CHIEF, FACILITIES BR
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
29-Nov-20
MITIGATION MEASURES / REQUIREMENTS TABLE
Point of Contact:
Jim Schloss Project Number:
DPW15-123
POC Phone:
719-526-9214 NEPA Number:
2020-223mg Title:
Renovation Project, Bldg. 1218, Fort Carson
Description:
Renovation Project, Bldg. 1218, Fort Carson. Remove the existing hydronic heating system and replace with a new gas fired HVAC forced air system. Remove the existing plumbing fixtures and toilet partitions throughout the building and replace with new plumbing fixtures and toilet partitions. Remove the existing suspended ceilings and replace with new suspended ceilings with new LEED lighting. Install a new fire detection and fire suppression system. Abate asbestos containing materials. Remove existing carpet and replace with new carpet tiles. Paint all interior walls. Improve the existing perimeter walls with new 6” metal studs and ½’ drywall with new R-19 insulation between the studs. Install additional electrical duplex outlets throughout the building to meet current NEC code. Install new voice/data drops throughout the building.
AIR
Rich Yohn 719-526-6601
Brandon Fellner 719-526-0978
Fort Carson is required to track the emissions of hazardous air pollutants typically found in paints, solvents, adhesives, and many other materials. Please complete the attached AQA form and return to the Air Program if any of these materials are used.
WASTEWATER/DRINKING WATER
John Wachter 719-526-1694
Jeff Farmer 719-526-1730
Ensure that any pipe, plumbing fitting, fixture, solder, or any flux used for providing water for human consumption are certified lead free (Safe Drinking Water Act, Section 1417 (e); Reduction of Lead in Drinking Water Act, 2014; NSF-61- 371.
Ensure that potable water sources are not contaminated by backflow issues. Eliminate cross-connections and/or provide the required backflow prevention assembly (BFPA). BFPA assemblies / methods must conform to the American National Standards Institute / American Water Works Association (ANSI/AWWA) Standards C51007, or C511-07, and American Society of Sanitary Engineering (ASSE) Standards.
Waterless urinals are not recommended due to the corrosion issues. It is preferred that low flow urinals be installed. If waterless urinals are used, then copper and brass piping will have to be replaced with PVC.
Before any potable water lines are utilized by a consumer the lines in the building(s) must be flushed and a water quality test must be performed (Bac-t / e-coli) IAW FC Policy.
STORMWATER
Kenneth Morris 719-526-1697
Jack Haflett 719-526-6206
Have a waste management plan for disposal of debris, and dispose of all waste material properly. Make sure waste does not enter into the curb and gutter, inlets, ditches or surface waters as this is a Stormwater violation.
ASBESTOS/LEAD/TOXICS
David Martin 719-526-1725
Coordinate asbestos abatement with Program Manager to ensure proper inspections are performed; and proper removal and disposal of ACM.
IRP
Joe Gallegos 719-526-8001
No concerns.
AST/UST/SPILL
Terry Eberle 719-526-9411
No concerns
RCRA
Cheryl Frischkorn 719-526-1686
Typically, the disposal of hazardous waste (HW) is a requirement of contracts on Fort Carson, where the contactor is responsible for the proper handling and disposal. However, if this is not the case or if this project is conducted by non-contractor personnel, please contact the HW PM, the RCRA PM, or an ECAT member for proper handling and disposal.
INVASIVE PLANTS/PEST MANAGEMENT
Cecily Mui 719-526-1692
CULTURAL RESOURCES
Jennifer Kolise 719-526-4484
Kari Pittman (PCMS) 719-503-6136
This activity is exempted from further Section 106 consultation under the Fort Carson Built Environment Programmatic Agreement. No further action required. Inadvertent Discovery of Archaeological, Cultural, or Paleontological Materials Standard Operating Procedure applies.
BE I.A2
FORESTRY/ARBORIST
Jeff McLemore 719-526-1667
WATERSHEDS/WETLANDS/404
James Kulbeth 719-526-1685
WILDLIFE
Stephanie Smith-Froese 719-526-8006
Anna Joy Lehmicke 719-526-3975 Michelle Blake 719-503-6538 (PCMS)
No wildlife concerns.
OTHER
NEPA POCs Angie Bell 719-526-4666
Marcus Gray 719-526-2752
Wayne Thomas 719-526-1852
The Fort Carson NEPA Office must be notified of any change to the scope, location, or size of the project.
Project proponent is responsible to ensure coordination, monitoring, and mitigation requirements listed in this document are implemented.
Further Coordination May Be Required:
Finalized Date:
Click here to sign this section
Signed by GRAY.MARCUS.1153509138 View details on Thursday, May 28, 2020 3:01 PM (Mountain Daylight Time)
5/28/2020 ** Subject to requirements listed in the Mitigation Measures/Requirements Table. If project is not initiated within 180 days, and/or there is a change in scope of work or location this document becomes null and void. Contact the NEPA Section for re-submittal. Expiration Date:
Any environmental information needed to meet permit requirements (i.e. historic properties, T&E Species, Air Quality.
etc) can be obtained from the Fort Carson Program POCs listed above.
CAUTION: IF THIS FORM IS PROVIDED AS AN ATTACHMENT TO, OR OTHERWISE AS A PART OF, A CONTRACT, THE FOLLOWING APPLIES:
The above information represents assessments from the Fort Carson DPW Environmental Division concerning environmental requirements relating to this project. These assessments are provided for the Contractor’s information only. The Government does not warrant that these assessments are accurate or comprehensive. The Contractor remains responsible to determine and comply with all applicable federal, state, local, and military environmental laws and regulations.
Fort Carson has implemented an Environmental Management System (EMS) as the primary management approach for addressing environmental impacts of its processes, activities, and services. Fort Carson uses the ISO 14001:2004 as the standard for its EMS. All personnel performing work for on behalf of Fort Carson must be aware of and understand Fort Carson's Environmental Policy. For information regarding EMS requirements contact the Fort Carson EMS office at 719- 526-8893.
11/29/2020