2020-223mg_REC_DPW15-123.pdf

PDF 434 KB Posted

Attached to
DPW15-123 Interior Improvement B1218
Solicitation number
W911RZ-20-B-0001
Issued by

About this file

This document is a Record of Environmental Consideration (REC) for a renovation project at Building 1218 at Fort Carson, Colorado. The project involves removing the existing hydronic heating system and replacing it with a new gas-fired HVAC system, replacing plumbing fixtures and toilet partitions, removing and replacing suspended ceilings and lighting, installing a new fire detection and suppression system, abating asbestos-containing materials, replacing carpet and interior walls, improving perimeter walls with new studs and drywall with insulation, and adding additional electrical outlets and voice/data drops. The REC identifies potential environmental impacts including asbestos, stormwater, cultural resources, and wildlife. It determines the project qualifies for a categorical exclusion under sections addressing utility systems and routine building maintenance. Required coordination and mitigation measures are specified for air quality, wastewater, asbestos, stormwater, and other areas.

View the file

Other files

File Type Posted
RELEASED AMENDMENT 0007 20-B-0001-0007 .pdf PDF
GENERAL WAGE DECISION BUILDING CO20200022 MODIFICATION 4 10-30-2020.pdf PDF
AMENDMENT 6 DPW15-123 furniture inventory B1218.pdf PDF
AMENDMENT 6 DPW15-123 REVISED SOW 1 B1218 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 Answers bidders questions B1218 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 B 1218 DRAWING COLOR 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 LATEST SOW 2 FURNITURE MOVE B1218.pdf PDF
RELEASED AMENDMENT 20-B-0001-0006.pdf PDF
AMENDMENT 6 DPW15-123 NEC DESIGN SUPPLEMENTAL Aug 2019 update.pdf PDF
AMENDMENT 6 DPW15-123 REVISED Submittal Register 27 OCT 2020.xls XLS spreadsheet
AMENDMENT 6 DPW15-123 B 1218 DRAWING GRAYSCALE 27 OCT 2020.pdf PDF
RFI Responses for B1218 3 OCTOBER 2020.pdf PDF
REVISION DPW15-123 RPR B1218 DWG GRAYSCALE 3 OCT 2020.pdf PDF
REVISION Submittal Register 3 OCTOBER 2020.xls XLS spreadsheet
SOW 2 Furniture Move B1218 7 OCTOBER 2020.pdf PDF
RELEASED AMENDMENT W911RZ-20-B-0001-0005.pdf PDF
REVISION DPW15-123-RPR B1218 DWG COLOR 3 OCT 2020.pdf PDF
ATTACHMENT FOR SOW 2 furniture inventory B1218 7 OCTOBER .pdf PDF
ATTACHMENT FOR SOW 2 BLDG 1218 - 2nd Floor plan - 7 OCT 2020 .pdf PDF
NEW B1218 Asbuilts Combined 3 OCTOBER 2020.pdf PDF
REVISION SOW 1 B1218 2 OCTOBER 2020.pdf PDF
ATTACHMENT FOR SOW 2 BLDG 1218 - 3rd Floor plan - 7 OCT 2020.pdf PDF
20-B-0001-0004 solicitation amendment.pdf PDF
WAGE DECISION CO20200022 BUILDING 8-28-2020.txt TXT text file
Bid Opening location W911RZ-20-B-0001.pdf PDF
W911RZ-20-B-0001-0003 amendment.pdf PDF
WAGE DECISION CO20200008 8-28-2020 HIGHWAY.txt TXT text file
RELEASED SOLICITATION 20-B-0001-0002.pdf PDF
DPW15-123 SOLICITATION MOD SF30.pdf PDF
Fort Carson COVID Travel and Leave Business Rules Smart Card 4AUG20.pdf PDF
Fort Carson Form 2036 March 2020.pdf PDF
RELEASED SOLICITATION 20-B-0001.pdf PDF
Wage Decision Number CO20200022 january 2020.docx DOCX document
DPW15-123-RPR RENOVATION BLDG 1218 DRAWING COLOR.pdf PDF
AT-OPSEC Cover Sheet (Interior improvements for B1218).pdf PDF
2015_B1218_FINAL_Report_Short Version.pdf PDF
SOW B1218 2 June 2020.pdf PDF
Submittal Register.xls XLS spreadsheet
DPW15-123-RPR RENOVATION BLDG 1218 DRAWING GRAYSCALE.pdf PDF
DRAFT 20-B-0001 SUN AUG 16 245PM.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECORD OF ENVIRONMENTAL CONSIDERATION

NEPA / PROJECT #

/ 2020-223mg DPW15-123

DATE

5/28/2020

PREPARED BY

MARCUS GRAY 719.526.2752

SECTION I – PROPONENT INFORMATION

1. TO (Proponent Name) Jim Schloss

2. ORGANIZATION

DPW

2a. TELEPHONE # 719-526-9214

3. TITLE OF PROPOSED ACTION

Renovation Project, Bldg. 1218, Fort Carson

4. NEED FOR ACTION

To complete major repairs.

5. BRIEF DESCRIPTION OF PROPOSED ACTION

Renovation Project, Bldg. 1218, Fort Carson. Remove the existing hydronic heating system and replace with a new gas fired HVAC forced air system. Remove the existing plumbing fixtures and toilet partitions throughout the building and replace with new plumbing fixtures and toilet partitions. Remove the existing suspended ceilings and replace with new suspended ceilings with new LEED lighting. Install a new fire detection and fire suppression system. Abate asbestos containing materials. Remove existing carpet and replace with new carpet tiles. Paint all interior walls. Improve the existing perimeter walls with new 6” metal studs and ½’ drywall with new R-19 insulation between the studs Install

SECTION II – ENVIRONMENTAL SURVEY

(Checked boxes indicate potential environmental effects, including cumulative effects, and have mitigation / legal requirements).*

*See attached Mitigation / Legal Requirements for details Mitigation Required Coordination Required

6. Air (emissions, attainment status, etc)

7. Asbestos/Lead/Toxics

8. AST/UST/Spill

9. Cultural Resources

10. Forestry & Urban Forestry

11. IRP

12. Invasive Plants & Pest Management

13. RCRA

14. Stormwater (soil erosion, detention ponds, etc.)

15. Water Resources (watersheds, wetlands, Sec 404)

16. Wastewater

17. Wildlife

18. Other (see block 37)

SECTION III – PRELIMINARY PROJECT DATA

(For Internal Use Only - NEPA Checklist for Record of Environmental Consideration)

THE PROPOSED ACTION: YES NO If yes, list mitigation options (if applicable)

19. Is adjacent or near a waterway (ditch, stream, wetland, etc.)

20. Is over 1 acre in size (include entire footprint and/or ground disturbance)

21. Is over 5 acres in size (include entire footprint and/or ground disturbance)

22. Is site on undisturbed ground

23. Has trees within the area

24. Has noxious weeds/invasive species in the vicinity

25. Has prairie dog colonies or other known wildlife habitat

26. Requires additional use of airspace

27. Affects traffic on-post or off-post

28. Involves construction and/or demolition of facilities

29. Has the potential to generate fugitive dust

30. Will generate hazardous waste

31. Is sited within a floodplain

32. Has potential for a high level of public controversy

33. Will cause a change in land use

SECTION IV - ENVIRONMENTAL ANALYSIS DETERMINATION

34. The proposed action conforms to the Categorical Exclusion (CX) screening criteria in 32 CFR 651.29, for determining when to use a CX. The following CX (listed in 32 CFR Appendix B to Part 651, Section II - List of CXs) encompasses the proposed action:

OR

Proposed action previously reviewed in an EA or EIS (see block 35 for reference) e(2) Acquisition, installation, and operation of utility and communication systems, mobile antennas, data processing cable and existing right-of-way, easement, distribution systems, and/or facilities.

g(1) Routine repair and maintenance of buildings, airfields, grounds, equipment, and other facilities. Examples include, but not limited to: Removal and disposal of asbestos-containing material (i.e. roof material and floor tile) or lead-based paint in accordance with applicable regulations; removal of dead, diseased, or damaged trees; and repair of roofs, doors, windows, or fixtures.

35. TITLE AND DATE OF THE EA OR EIS REFERENCED:

36. Proposed action does not qualify for a CX; further environmental analysis is required

SECTION IV – ENVIRONMENTAL ANALYSIS DETERMINATION

AD :

PROPONENT (Name and Title)

ENVIRONMENTAL DIVISION

CERTIFICATION (Name and Title)

E IRONMENTAL DIVISION CHIEF,

DIRECTORATE OF PUBLIC WORKS

JAFARZADE

H.FARAMARZ

.M.151208889

Digitally signed by

JAFARZADEH.FARA

MARZ.M.151208889

Date: 2020.05.28 16:17:18 -06'00'

RIVERO-

DEAGUILAR.

CARLOS.125

6627236

Digitally signed by

RIVERO-

DEAGUILAR.CARLO

S.1256627236 Date: 2020.06.02 09:58:40 -06'00'

F. JEFF JAFARZADEH

CHIEF, FACILITIES BR

ENGINEERING DIVISION

DIRECTORATE OF PUBLIC WORKS

29-Nov-20

MITIGATION MEASURES / REQUIREMENTS TABLE

Point of Contact:

Jim Schloss Project Number:

DPW15-123

POC Phone:

719-526-9214 NEPA Number:

2020-223mg Title:

Renovation Project, Bldg. 1218, Fort Carson

Description:

Renovation Project, Bldg. 1218, Fort Carson. Remove the existing hydronic heating system and replace with a new gas fired HVAC forced air system. Remove the existing plumbing fixtures and toilet partitions throughout the building and replace with new plumbing fixtures and toilet partitions. Remove the existing suspended ceilings and replace with new suspended ceilings with new LEED lighting. Install a new fire detection and fire suppression system. Abate asbestos containing materials. Remove existing carpet and replace with new carpet tiles. Paint all interior walls. Improve the existing perimeter walls with new 6” metal studs and ½’ drywall with new R-19 insulation between the studs. Install additional electrical duplex outlets throughout the building to meet current NEC code. Install new voice/data drops throughout the building.

AIR

Rich Yohn 719-526-6601

Brandon Fellner 719-526-0978

Fort Carson is required to track the emissions of hazardous air pollutants typically found in paints, solvents, adhesives, and many other materials. Please complete the attached AQA form and return to the Air Program if any of these materials are used.

WASTEWATER/DRINKING WATER

John Wachter 719-526-1694

Jeff Farmer 719-526-1730

Ensure that any pipe, plumbing fitting, fixture, solder, or any flux used for providing water for human consumption are certified lead free (Safe Drinking Water Act, Section 1417 (e); Reduction of Lead in Drinking Water Act, 2014; NSF-61- 371.

Ensure that potable water sources are not contaminated by backflow issues. Eliminate cross-connections and/or provide the required backflow prevention assembly (BFPA). BFPA assemblies / methods must conform to the American National Standards Institute / American Water Works Association (ANSI/AWWA) Standards C51007, or C511-07, and American Society of Sanitary Engineering (ASSE) Standards.

Waterless urinals are not recommended due to the corrosion issues. It is preferred that low flow urinals be installed. If waterless urinals are used, then copper and brass piping will have to be replaced with PVC.

Before any potable water lines are utilized by a consumer the lines in the building(s) must be flushed and a water quality test must be performed (Bac-t / e-coli) IAW FC Policy.

STORMWATER

Kenneth Morris 719-526-1697

Jack Haflett 719-526-6206

Have a waste management plan for disposal of debris, and dispose of all waste material properly. Make sure waste does not enter into the curb and gutter, inlets, ditches or surface waters as this is a Stormwater violation.

ASBESTOS/LEAD/TOXICS

David Martin 719-526-1725

Coordinate asbestos abatement with Program Manager to ensure proper inspections are performed; and proper removal and disposal of ACM.

IRP

Joe Gallegos 719-526-8001

No concerns.

AST/UST/SPILL

Terry Eberle 719-526-9411

No concerns

RCRA

Cheryl Frischkorn 719-526-1686

Typically, the disposal of hazardous waste (HW) is a requirement of contracts on Fort Carson, where the contactor is responsible for the proper handling and disposal. However, if this is not the case or if this project is conducted by non-contractor personnel, please contact the HW PM, the RCRA PM, or an ECAT member for proper handling and disposal.

INVASIVE PLANTS/PEST MANAGEMENT

Cecily Mui 719-526-1692

CULTURAL RESOURCES

Jennifer Kolise 719-526-4484

Kari Pittman (PCMS) 719-503-6136

This activity is exempted from further Section 106 consultation under the Fort Carson Built Environment Programmatic Agreement. No further action required. Inadvertent Discovery of Archaeological, Cultural, or Paleontological Materials Standard Operating Procedure applies.

BE I.A2

FORESTRY/ARBORIST

Jeff McLemore 719-526-1667

WATERSHEDS/WETLANDS/404

James Kulbeth 719-526-1685

WILDLIFE

Stephanie Smith-Froese 719-526-8006

Anna Joy Lehmicke 719-526-3975 Michelle Blake 719-503-6538 (PCMS)

No wildlife concerns.

OTHER

NEPA POCs Angie Bell 719-526-4666

Marcus Gray 719-526-2752

Wayne Thomas 719-526-1852

The Fort Carson NEPA Office must be notified of any change to the scope, location, or size of the project.

Project proponent is responsible to ensure coordination, monitoring, and mitigation requirements listed in this document are implemented.

Further Coordination May Be Required:

Finalized Date:

Click here to sign this section

Signed by GRAY.MARCUS.1153509138 View details on Thursday, May 28, 2020 3:01 PM (Mountain Daylight Time)

5/28/2020 ** Subject to requirements listed in the Mitigation Measures/Requirements Table. If project is not initiated within 180 days, and/or there is a change in scope of work or location this document becomes null and void. Contact the NEPA Section for re-submittal. Expiration Date:

Any environmental information needed to meet permit requirements (i.e. historic properties, T&E Species, Air Quality.

etc) can be obtained from the Fort Carson Program POCs listed above.

CAUTION: IF THIS FORM IS PROVIDED AS AN ATTACHMENT TO, OR OTHERWISE AS A PART OF, A CONTRACT, THE FOLLOWING APPLIES:

The above information represents assessments from the Fort Carson DPW Environmental Division concerning environmental requirements relating to this project. These assessments are provided for the Contractor’s information only. The Government does not warrant that these assessments are accurate or comprehensive. The Contractor remains responsible to determine and comply with all applicable federal, state, local, and military environmental laws and regulations.

Fort Carson has implemented an Environmental Management System (EMS) as the primary management approach for addressing environmental impacts of its processes, activities, and services. Fort Carson uses the ISO 14001:2004 as the standard for its EMS. All personnel performing work for on behalf of Fort Carson must be aware of and understand Fort Carson's Environmental Policy. For information regarding EMS requirements contact the Fort Carson EMS office at 719- 526-8893.

11/29/2020