DPW15-123 SOLICITATION MOD SF30.pdf
PDF 145 KB Posted
- Attached to
- DPW15-123 Interior Improvement B1218
- Solicitation number
- W911RZ-20-B-0001
About this file
This document is a modification to a solicitation for interior improvement work at Building 1218 on Fort Carson. The modification changes the site visit date and time, updates the wage determination and access requirements in accordance with Fort Carson COVID-19 protocols. The solicitation is for renovation of Building 1218 including furnishing labor, equipment, supplies and materials. The issuing agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood. Offerors must submit proposals in response by the amended date of August 31, 2020. The requirement includes adherence to statement of work and enclosure documents.
The modification provides notice that the site visit date has changed to August 31, 2020 at 9:30am. It also updates the wage determination and access requirements to include a Fort Carson installation access form, proof of vehicle insurance, and adherence to Fort Carson and Colorado quarantine rules for personnel traveling from designated hot spot states. The solicitation number and renovation scope remain unchanged.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DPW15-123
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THE PURPOSE OF THIS MODIFICATION IS TO CHANGE AND ADD THE FOLLOWING:
Please refer to SF1442 Block 10 and Clauses to compare the follow ing changes and updates on the attached Continuous Page on the SF30.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911RZ20B0001
X 9B. DATED (SEE ITEM 11)
19-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Aug-2020
CODE
918TH CONTRACTING BATTALION
1676 EVANS ST.
BLDG. 1220, 3RD FLOOR, RM 355
FORT CARSON CO 80913
W911RZ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911RZ20B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
BLOCK 14 CONTINUOUS PAGE
THE PURPOSE OF THIS MODIFICATION IS TO CHANGE AND ADD THE FOLLOWING:
Please refer to SF1442 Block 10 and clauses to compare the following changes.
1. Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995); has changed from August 28, 2020 at 10:00 AM to being conducted on August 31, 2020
9:30 AM.
2. IAW FAR 22.404-1 - Types of Wages Determinations will change from General Decision Number: CO180032 03/02/2018 CO32; Construction Type: Building to General Decision Number: CO20200022 01/24/2020 Construction Type: Building.
3. Fort Carson (FC) Form 2036-E Request for A Fort Carson Installation Access Control Card will be added to Clause: 252.236-7001 Contract Drawings and Specifications (AUG 2000) for gaining access to Fort Carson. All personnel will need a valid ID card and proof of insurance (per vehicle) before gaining access to Fort Carson along with FC Form 2036 and memo that will be provided by the Government. FC Form 2036 will need to be returned to the below e-mail no later than August 27, 2020 for processing.
SSG Antoine L. Echols at antoine.l.echols.mil@mail.mil
4. If a Contractor is coming from a HOT State they will need to meet Fort Carson and the State of Colorado quarantine requirements. Please see the Fort Carson COVID Travel & Leave Business Rules Smart Card 4AUG20 that has been added to Clause: 252.236-7001 Contract Drawings and Specifications (AUG 2000) and visit the following link for updates;
https://carson.army.mil/
5. All other terms and conditions remain the same.
SECTION 00 10 00 - SOLICITATION
The Issued By organization has changed from
MICC - FORT CARSON
ATTN: JAMES R. RUBY 1676 EVANS ST, BLDG 1220,
FORT CARSON CO 80913-5198
to
MICC - FORT CARSON-
1676 EVANS ST
ISSUING OFFICE
FORT CARSON CO 80913
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—
August 31, 2020 at 9:30 AM
(c) Participants will meet at BUILDING 1218, FORT CARSON CO 80913
Point of Contact Name: James R Ruby Address: 1676 Evans Street, Bldg 1220 3rd Floor Telephone: (719) 526-6623 Email: james.r.ruby.civ@mail.mil
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
SOW B 1218 2 JUNE 2020
AT-OPSEC COVER SHEET
2015_B1218_FINAL_REPORT_SHORT VERSION
2020-223MG_REC_DPW15-123
DPW15-123-RPR RENOVATION BLDG 1218 DRAWING COLOR
DPW15-123-RPR RENOVATION BLDG 1218 DRAWING GRAYSCALE
SUBMITTAL REGISTER
FORT CARSON FORM 2036-E
4ID & FORT CARSON COVID TRAVEL & LEAVE BUSINESS RULES SMART CARD
(End of clause)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .