This is an amendment to a solicitation for interior improvements to Building 1218 at Fort Carson, Colorado. The amendment provides revised drawings, statements of work, submittal registers, and answers to bidders' questions to update the requirements. It also changes the bid opening date from September 18, 2020 to November 17, 2020 at 1:00 PM local time and specifies the outdoor location for public bid openings in response to COVID-19 restrictions. The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood is the contracting agency. The scope of work involves furnishing all labor, equipment, materials and performing all operations necessary for renovation in accordance with the updated statement of work and attachments.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DPW15-123
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PURPOSE IS TO REVISE SOLICITATION DOCUMENTS
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Nov-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911RZ20B0001
X 9B. DATED (SEE ITEM 11)
19-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Nov-2020
CODE
MICC - FORT CARSON-
1676 EVANS ST
ISSUING OFFICE
FORT CARSON CO 80913
W911RZ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911RZ20B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
CONTINUATION SHEET
THIS AMENDMENT (AMENDMENT NUMBER 0006) PROVIDES CHANGES TO THE EXISTING
STATEMENT OF WORK, SPECIFICATIONS AND / OR DRAWINGS. THIS AMENDMENT RESPONDS TO
REQUESTS FOR INFORMATION (RFIs). THIS AMENDMENT ALSO PROVIDES A BID OPENING DATE
CHANGE. IF THERE IS CONFLICTING INFORMATION AMONG AMENDMENT RESPONSES, THE MOST
RECENT AMENDMENT PERTAINING TO THAT SUBJECT DICTATES.
A. THE FOLLOWING IS A LIST OF DOCUMENTS THAT ARE REVISED OR ARE NEW DOCUMENTS
AND ARE INCORPORATED INTO THIS SOLICITION.
1. AMENDMENT 6 DPW15-123 Answers bidders’ questions B1218 27 OCT 2020
2. AMENDMENT 6 DPW15-123 B 1218 DRAWING COLOR 27 OCT 2020
3. AMENDMENT 6 DPW15-123 B 1218 DRAWING GRAYSCALE 27 OCT 2020
4. AMENDMENT 6 DPW15-123 furniture inventory B1218
5. AMENDMENT 6 DPW15-123 NEC DESIGN SUPPLEMENTAL Aug 2019 update
6. AMENDMENT 6 DPW15-123 REVISED SOW 1 B1218 27 OCT 2020
7. AMENDMENT 6 DPW15-123 REVISED Submittal Register 27 OCT 2020
8. AMENDMENT 6 DPW15-123 LATEST SOW 2 Furniture Move B1218
B. E. CHANGE OF BID OPENING DATE:
BLOCK 13 A OF THE STANDARD FORM 1442 IS CHANGED TO READ AS FOLLOWS:
“SEALED OFFERS IN ORIGINAL AND (1) COPY TO PERFORM THE WORK REQUIRED ARE DUE AT
THE PLACE SPECIFIED IN ITEM 8 BY 1:00 PM NOVEMBER 17, 2020 (date and local time). IF THIS IS A
SEALED BID SOLICITATION, OFFERS WILL BE PUBLICLY OPENED AT THAT TIME. SEALED
ENVELOPES CONTAINING OFFERS SHALL BE MARKED TO SHOW THE OFFEROR’S NAME AND
ADDRESS, THE SOLICITATION NUMBER, AND THE DATE AND TIME OFFERS
ARE DUE.”
C. THE FOLLOWING INFORMATION FOR BLOCK 8 OF THE STANDARD FORM 1442 IS REPEATED
FROM AMENDMENT 0005 FOR OFFERORS AWARENESS.
“IF OFFER IS MAILED, MAIL TO: MICC FORT CARSON,
1676 EVANS STREET, BUILDING 1220, 3RD FLOOR, ROOM 327A, FORT CARSON
CO 80913. MAILED OFFERS MUST BE RECEIVED NO LATER THAN THE DATE
AND TIME IDENTIFIED IN BLOCK 13A OF THE STANDARD FORM 1442. DUE TO
COVID19, THE LOCATION FOR THE BID OPENING WILL BE NEXT TO THE
“”STATUE OF KIT CARSON ASTRIDE A HORSE”” WEST OF THE VISITORS
CENTER BUILDING 6012, OFF OF THE ENTRANCE TO FORT CARSON GATE 1.
THE BID OPENING WILL BE OUTDOORS. THIS LOCATION DOES NOT REQUIRE
SPECIAL SECURITY ACCESS PERMISSIONS. THIS LOCATION IS THE FIRST
RIGHT TURN OFF OF THE ENTRANCE TO FORT CARSON GATE 1 FROM
COLORADO HIGHWAY 115. ALL TIMELY RECEIVED BIDS WILL BE OPENED AT
THIS LOCATION. ALL HAND CARRIED BIDS FOR THE BID OPENING MUST BE
RECEIVED AT THIS LOCATION NO LATER THAN THE DATE AND TIME CITED
IN BLOCK 13 OF THE STANDARD FORM 1442.”
D. REMINDER: OFFERORS, PLEASE ENSURE YOU ACKNOWLEDGE RECEIPT OF ALL AMENDMENTS
WITH THE SUBMISSION OF BIDS (REFERENCE STANDARD FORM 30, BLOCK 11). THIS IS
AMENDMENT NUMBER 0006.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 18-Sep-2020 11:00 AM to 17-Nov-2020 01:00 PM.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
1. REVISION SOW #1 B1218 2 OCTOBER 2020
2. NEW B1218 As‐built dwgs Combined 3 OCTOBER 2020
3. RFI Responses for B1218 3 OCTOBER 2020
4. ATTACHMENT FOR SOW #2 BLDG 1218 – 2nd Floor Plan – 7 OCT 2020
5. ATTACHMENT FOR SOW #2 BLDG 1218 – 3rd Floor Plan – 7 OCT 2020
6. AT-OPSEC COVER SHEET
7. 2015_B1218_FINAL_REPORT_SHORT VERSION
8. 2020-223MG_REC_DPW15-123
9. FORT CARSON FORM 2036-E
10. 4ID & FORT CARSON COVID TRAVEL & LEAVE BUSINESS RULES SMART CARD
11. AMENDMENT 6 DPW15‐123 Answers bidders’ RFI questions B1218 27 OCT 2020
12. AMENDMENT 6 DPW15‐123 B 1218 DRAWING COLOR 27 OCT 2020
13. AMENDMENT 6 DPW15‐123 B 1218 DRAWING GRAYSCALE 27 OCT 2020
14. AMENDMENT 6 DPW15‐123 furniture inventory B1218
15. AMENDMENT 6 DPW15‐123 NEC DESIGN SUPPLEMENTAL Aug 2019 update
16. AMENDMENT 6 DPW15‐123 REVISED SOW 1 B1218 27 OCT 2020
17. AMENDMENT 6 DPW15‐123 REVISED Submittal Register 27 OCT 2020
18. AMENDMENT 6 DPW15‐123 LATEST SOW 2 Furniture Move B1218 (End of clause)
(End of Summary of Changes)