AMENDMENT 6 DPW15-123 LATEST SOW 2 FURNITURE MOVE B1218.pdf

PDF 808 KB Posted

Attached to
DPW15-123 Interior Improvement B1218
Solicitation number
W911RZ-20-B-0001
Issued by

About this file

This statement of work outlines requirements for moving furniture from Building 1218 at Fort Carson as part of an interior improvement project. The selected contractor must remove all furniture items from Building 1218 according to the provided inventory and relocate qualifying pieces to Buildings 1011 and 1012 to facilitate temporary office space for human resources staff during renovations. Ineligible items will be disposed of properly. The contractor must track and account for all furniture by type and unit, noting any damage, and complete the work within two weeks according to specified access and work hours. Safety standards and security requirements including training must be followed.

View the file

Other files

File Type Posted
RELEASED AMENDMENT 0007 20-B-0001-0007 .pdf PDF
GENERAL WAGE DECISION BUILDING CO20200022 MODIFICATION 4 10-30-2020.pdf PDF
AMENDMENT 6 DPW15-123 furniture inventory B1218.pdf PDF
AMENDMENT 6 DPW15-123 REVISED SOW 1 B1218 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 Answers bidders questions B1218 27 OCT 2020.pdf PDF
AMENDMENT 6 DPW15-123 B 1218 DRAWING COLOR 27 OCT 2020.pdf PDF
RELEASED AMENDMENT 20-B-0001-0006.pdf PDF
AMENDMENT 6 DPW15-123 NEC DESIGN SUPPLEMENTAL Aug 2019 update.pdf PDF
AMENDMENT 6 DPW15-123 REVISED Submittal Register 27 OCT 2020.xls XLS spreadsheet
AMENDMENT 6 DPW15-123 B 1218 DRAWING GRAYSCALE 27 OCT 2020.pdf PDF
RFI Responses for B1218 3 OCTOBER 2020.pdf PDF
REVISION DPW15-123 RPR B1218 DWG GRAYSCALE 3 OCT 2020.pdf PDF
REVISION Submittal Register 3 OCTOBER 2020.xls XLS spreadsheet
SOW 2 Furniture Move B1218 7 OCTOBER 2020.pdf PDF
RELEASED AMENDMENT W911RZ-20-B-0001-0005.pdf PDF
REVISION DPW15-123-RPR B1218 DWG COLOR 3 OCT 2020.pdf PDF
ATTACHMENT FOR SOW 2 furniture inventory B1218 7 OCTOBER .pdf PDF
ATTACHMENT FOR SOW 2 BLDG 1218 - 2nd Floor plan - 7 OCT 2020 .pdf PDF
NEW B1218 Asbuilts Combined 3 OCTOBER 2020.pdf PDF
REVISION SOW 1 B1218 2 OCTOBER 2020.pdf PDF
ATTACHMENT FOR SOW 2 BLDG 1218 - 3rd Floor plan - 7 OCT 2020.pdf PDF
20-B-0001-0004 solicitation amendment.pdf PDF
WAGE DECISION CO20200022 BUILDING 8-28-2020.txt TXT text file
Bid Opening location W911RZ-20-B-0001.pdf PDF
W911RZ-20-B-0001-0003 amendment.pdf PDF
WAGE DECISION CO20200008 8-28-2020 HIGHWAY.txt TXT text file
RELEASED SOLICITATION 20-B-0001-0002.pdf PDF
DPW15-123 SOLICITATION MOD SF30.pdf PDF
Fort Carson COVID Travel and Leave Business Rules Smart Card 4AUG20.pdf PDF
Fort Carson Form 2036 March 2020.pdf PDF
RELEASED SOLICITATION 20-B-0001.pdf PDF
Wage Decision Number CO20200022 january 2020.docx DOCX document
DPW15-123-RPR RENOVATION BLDG 1218 DRAWING COLOR.pdf PDF
AT-OPSEC Cover Sheet (Interior improvements for B1218).pdf PDF
2015_B1218_FINAL_Report_Short Version.pdf PDF
SOW B1218 2 June 2020.pdf PDF
Submittal Register.xls XLS spreadsheet
DPW15-123-RPR RENOVATION BLDG 1218 DRAWING GRAYSCALE.pdf PDF
DRAFT 20-B-0001 SUN AUG 16 245PM.pdf PDF
2020-223mg_REC_DPW15-123.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e Fort Carson

“The Best Hometown in the Army-Home of America’s Best!”

STATEMENT OF WORK

(SOW) 2

Furniture Move from B1218

DPW Project Manager:

James E. Schloss, RA, LEED GA

2 November 2020

Directorate of Public Works

Fort Carson, CO 80913

Table of Contents

1. Background

2 | P a g e

“The Best Hometown in the Army-Home of America’s Best!”

2. Project Description

3. Period of Performance, Work Hours, and Phasing

4. General

5. Attachments

1. Background

1.1. This Statement of Work is in addition to the Statement of Work for the renovation of

B1218. This Statement of Work is to provide for the movement, storage and disposal of furniture located in B1218. B1218 is a three story building with a small elevator, two interior stairways, two exterior stairways and accessible ramps at the main entry doors.

The furniture must be moved into B1011 and B1012 so that the Human Resources function can be maintained. B1012 is a three story building, but only the first and second floor will be used as the interim Human Resources function. Finally, unneeded furniture items shall be disposed of. B1012 has a concrete ramp serving the first floor.

2. Project Description

2.1. The Contractor shall furnish all labor and equipment and perform all operations necessary to accomplish the following in accordance with the Statement of Work and

Enclosures:

2.2 Access

2.2.1 The Contractor shall coordinate access to buildings 1218, 1011 and 1012 with the Contracting Officer’s Representative (COR).

2.3 Inventory

2.3.1 The Contractor shall be given an inventory of the furniture in B11218

(attached).

2.3.2 The inventory shall note the floor, room name and number from which the furniture is to be removed from in B1218. The Government Contracting Officer’s Representative (COR) shall coordinate the floor, room name and number the furniture to be moved into in B1011 and B1012 and any furniture to be disposed of.

2.3.3 The Contractor shall note any damage to the furniture prior to moving it out of the building. This information shall be forwarded to the Contracting Officer’s

Representative (COR).

2.4 Furniture Units

2.4.1 Furniture units shall be accounted for as follows:

Desks – number of desks

3 | P a g e

Work desks with attached wall and cabinets – number of work desks with attached wall and cabinets

Chairs - number of chairs

Conference tables – number of conference tables

Multipurpose tables – number of multipurpose tables

Credenzas – number of credenzas

Bookcases - number book cases

2 drawer file cabinets - number of 2 drawer file cabinets

3 drawer file cabinets - number of 3 drawer file cabinets

4 drawer file cabinets – number of 4 drawer file cabinets

5 drawer file cabinets – number of 5 drawer file cabinets

Multipurpose file cabinets – number of multipurpose file cabinets

2 drawer lateral file cabinets – number of 2 drawer lateral file cabinets

4 drawer lateral file cabinets – number of 4 drawer lateral file cabinets

Refrigerators – number of refrigerators

Wall boards – number of wall boards

Microwave – number of microwaves

Podium – number of podiums

Stand – number of stands

Stool – number of stools

Sofas – number of sofas

TVs – number of TVs

Lamps – number of lamps

2.5 Basis of Payment

2.5.1 The basis of payment for the task order shall be based on the following:

(1) furniture items (type and number of units)

(2) hauling distance/time required for placement/disposition

2.8 Movement of Furniture

2.8.1 The Contractor shall remove the identified furniture out of B1218 and relocate these items into B1011, B1012 and disposed of , as directed by the Contracting

Officer’s Representative (COR).

2.8.1 The Contractor shall be permitted to use the elevators in B1218 and B1012, provided necessary protection is provided for the elevators.

2.9 Disposal of Furniture

2.9.1 The Contractor shall dispose the furniture items identified by the Contracting

Officer’s Representative (COR) for disposal.

4 | P a g e

3. Period of Performance, Work Hours, and Phasing

3.1 The performance period for this work shall be two weeks (M-F).

3.2 Normal operating hours are from weekdays, 7:00 am to 5:00 pm. The Contractor must arrange and obtain approval from the Contracting Officer Representative (COR) to schedule work and facility access outside these hours.

3.3 Traffic control measures and phasing shall allow for continuous access to all facilities and parking lots.

3.4 Contractor shall not work during any federal holidays.

4. General

4.1. Existing Conditions: The Contractor shall verify conditions prior to start of work and bring any concerns to the attention of the Contracting Officer’s Representative (COR).

4.2. Working with Other Agencies/Contractors: Other construction agencies/contractors may working in the vicinity of the project. The Contractor shall conduct work so as to not interfere with or hinder the progress of the completion of work being performed by other agencies/ contractors.

4.3. Restrooms: The Contractor will be authorized the use of government restrooms in

B1011 and B1012.

4.4. Safety: The Contractor must comply with EM 385-1-1, AR 385-10, OSHA 29 CFR

1910/1926, EPA & NFPA standards.

5. Security Requirements

5.1. General. Contractor personnel performing work under this Contract must be able to document appropriate vehicle registration and insurance, as well as driver identification at time of the proposal submission, and must maintain the level of security required for the life of the Contract. The Contractor shall maintain vehicle registration, insurance, and driver certifications for the duration of the Contract.

5.2. Access and General Protection/Security Policy and Procedures. This standard language is for Contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of

Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity

Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy.

In addition to the changes otherwise authorized by the changes clause of this Contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

5 | P a g e

5.3. AT Level I Training. The Contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete

AT Level I awareness training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil . Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training.

5.4. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the

COR. This training shall be completed within 60 calendar days of contract award and within 60 calendar days of new employees commencing performance with the results reported to the COR NLT 90 calendar days after contract award.

5.5. Access Cards. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime

Information Center Interstate Identification Index (NCIC-III) – This is done by completing a REQUEST FOR A FORT CARSON INSTALLATION ACCESS

CONTROL CARD (FC Form FC FORM 2036-E) and Terrorist Screening Database

(TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures

(provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. The process for obtaining an access pass is as follows:

5.5.1. The COR will pre‐fill out FC Form 2036‐E Request for Fort Carson Installation

Access Control Card, with all relevant contract information and provide to the

Contractor Project Manager or designated POC.

5.5.2. The Contractor will provide the completed form in PDF format electronically by email to the COR for approval and digital signature. (The sponsor can be a contractor employee).

5.5.3. The COR will verify need for Fort Carson access, digitally sign and email back to the Contractor employee.

5.5.4. Contractors will go directly to Gate 1 Visitor Center with their signed FC Form

2036‐E and credentials for a one‐stop NCIC III check and Access Card with photo issue.

5.6. One Day Passes

http://jko.jten.mil/

6 | P a g e

5.6.1. Commercial vehicles and vendors’ will use Gate 3 where the NCIC check will be done “in‐lane” and a Day Pass will be issued.

5.6.2. For Visitor access, use Gate 1 Visitor Center where the NCIC check will be done and a Day Pass issued. This also applies to all those who have a valid ID, but have temporarily misplaced it.

6. Attachments

6.1 Ft. Carson Specific Regulations, Guidance, and Forms:

6.1.1 FC Form 2036-E, Request for a Fort Carson Installation Access Control Card

5.2 Drawings

6.2.1 Floor plans for B1117 and B1012

5.3 Inventory

6.3.1 Furniture items

File details come from the government source that posted it. Updated .