TE7_Ch 1 - Job Orders (2020-06-24).pdf
PDF 1 MB Posted
- Attached to
- Fort Riley Custodial Services: Federal contract opportunity
- Solicitation number
- W911RX20R0003
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS Times Calculated
Para- Quan- Per Unit Price Per graph Freq tities Unit Month Price Month
3.4.1 1/wk 2 ea 4.33 $0.17 $1.47
3.4.2 1/wk 3,622 csf 4.33 $0.24 $37.64
3.4.4 1/wk 3,622 csf 4.33 $0.84 $131.74
3.4.8 AO 45 csf $4.72 $0.00
3.4.9 1/wk 767 csf 4.33 $0.51 $16.94
3.4.11 AO 767 csf $5.06 $0.00
3.4.12 AO 1,639 csf $3.03 $0.00
3.4.14 4,389 csf $0.07 $0.00
3.4.26 1 ea $0.67 $0.00
3.4.27 40 lf $0.34 $0.00
3.4.34 1/wk 3 ea 4.33 $0.67 $8.70
3.4.36 1/wk 2 ea 4.33 $0.93 $8.05
3.4.39 1/wk 142 csf 4.33 $1.35 $8.30
$212.85
1.00
$212.85
Take Off: Carpet V-Tile Wood RVSTL C-Tile Concrete
Basement: 0 0 0 0 2,080 0
1st Floor: 767 0 1,639 45 0 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 767 0 1,639 45 2,080 0
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 3, Barry Ave., Main Post Square Feet of Floor Area: 4,531
Clean and Rewax Wood Floor Surfaces
Price Calculation
St. Mary's Chapel
Custodial Tasks
Collect and Remove Trash (Rest Rooms Only)
Sweep and/or Dust Mop Floors and Stairways (Note 1)
Mop Floors and Stairways (Note 1)
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Clean Toilets and Seats
Scrub and Disinfect Rest Room Floors; 2 for
Subtotal
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Kitchen/Kitchenette Sink
Clean Countertop
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Custodial Service Cost Coefficient
Total Calculated Price Per Month
1. Includes Wood Strip Flooring.
Notes:
2/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 1/wk 2 ea 4.33 $0.17 $1.47
3.4.2 1/wk 2,260 csf 4.33 $0.24 $23.49
3.4.4 1/wk 2,260 csf 4.33 $0.84 $82.20
3.4.8 1/yr 361 csf 0.08 $4.72 $1.42
3.4.9 1/wk 4,296 csf 4.33 $0.51 $94.87
3.4.11 AO 407 csf $5.06 $0.00
3.4.11 AO 4,296 csf $5.06 $0.00
3.4.12 AO 2,039 csf $3.03 $0.00
3.4.14 6,556 csf $0.07 $0.00
3.4.26 1 ea $0.67 $0.00
3.4.27 6 lf $0.34 $0.00
3.4.34 1/wk 4 ea 4.33 $0.67 $11.60
3.4.36 1/wk 4 ea 4.33 $0.93 $16.11
3.4.37 1/wk 1 ea 4.33 $0.76 $3.29
3.4.39 1/wk 140 csf 4.33 $1.35 $8.18
$242.63
1.00
$242.63
Take Off: Carpet V-Tile Wood RVSTL C-Tile Concrete
Basement: 2,456 361 0 0 0 0
1st Floor: 1,840 0 2,039 0 0 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 4,296 361 2,039 0 0 02/yr = 2/12 = 0.1666 Times Per Month
Clean Carpets, Rugs and Throwrugs
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Clean Toilets and Seats
Clean Urinals
Clean Carpets, Rugs and Throwrugs (Child Care Room Only)
Clean and Rewax Wood Floor Surfaces
1. Includes Wood Strip Flooring.
Scrub and Disinfect Rest Room Floors; 2 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 6, Barry Ave., Main Post Square Feet of Floor Area: 6,696
Price Calculation
Notes:
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020
Main Post Chapel
Custodial Tasks
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Kitchen/Kitchenette Sink
Clean Countertop
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways (Note 1)
Mop Floors and Stairways (Note 1)
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs graph Freq tities Unit Month Price Month
3.4.1 1/wk 1 ea 4.33 $0.17 $0.74
3.4.2 1/wk 1,798 csf 4.33 $0.24 $18.68
3.4.4 1/wk 1,798 csf 4.33 $0.84 $65.40
3.4.9 1/wk 706 csf 4.33 $0.51 $15.59
3.4.11 AO 706 csf $5.06 $0.00
3.4.12 AO 2,318 csf $3.03 $0.00
3.4.14 2,318 csf $0.07 $0.00
3.4.34 1/wk 1 ea 4.33 $0.67 $2.90
3.4.36 1/wk 1 ea 4.33 $0.93 $4.03
3.4.39 1/wk 60 csf 4.33 $1.35 $3.51
$110.84
1.00
$110.84
Take Off: Carpet V-Tile Wood RVSTL C-Tile Concrete
Basement: 0 0 0 0 0 246
1st Floor: 463 0 923 0 0 0
2nd Floor: 243 0 689 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 706 0 1,612 0 0 246
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 24A, Sheridan Ave., Main Post Square Feet of Floor Area: 2,564
Price Calculation
Custer House Museum
Service is only provided from 1 May to 30 Sept.
Custodial Tasks
Sweep and/or Dust Mop Floors and Stairways (Note 1)
Mop Floors and Stairways (Note 1)
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Clean and Rewax Wood Floor Surfaces
Clean Toilets and Seats
Scrub and Disinfect Rest Room Floors; 1 for
Subtotal
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Custodial Service Cost Coefficient
Total Calculated Price Per Month
1. Includes Wood Strip Flooring.
Notes:
2/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 2/mo 1 ea 2.00 $0.17 $0.34
3.4.2 2/mo 1,190 csf 2.00 $0.24 $5.71
3.4.4 2/mo 1,190 csf 2.00 $0.84 $19.99
3.4.8 AO 295 csf $4.72 $0.00
3.4.9 2/mo 320 csf 2.00 $0.51 $3.26
3.4.11 AO 320 csf $5.06 $0.00
3.4.12 AO 760 csf $3.03 $0.00
3.4.14 1,510 csf $0.07 $0.00
3.4.34 2/mo 1 ea 2.00 $0.67 $1.34
3.4.36 2/mo 1 ea 2.00 $0.93 $1.86
3.4.38 2/mo 1 ea 2.00 $1.69 $3.38
3.4.39 2/mo 115 csf 2.00 $1.35 $3.11
$38.99
1.00
$38.99
Custodial tasks to be completed during the first and
Take Off: Carpet V-Tile Wood HP Lam C-Tile Concrete
Basement: 0 0 0 0 0 0
1st Floor: 320 180 602 250 0 0
2nd Floor: 0 115 158 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 320 295 760 250 0 0
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 24B, Sheridan Ave., Main Post Square Feet of Floor Area: 1,625
Price Calculation
Custer House Museum
Custodial Tasks
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways (Note 1)
Mop Floors and Stairways (Note 1)
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Clean and Rewax Wood Floor Surfaces
Clean Toilets and Seats
Clean Shower Stalls and/or Bathtubs
Scrub and Disinfect Rest Room Floors; 1 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Notes:
1. Includes Wood Strip Flooring.
third week of each month.
2/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 1/wk 5 ea 4.33 $0.17 $3.68
3.4.2 1/wk 128 csf 4.33 $0.24 $1.33
3.4.2 1/wk 280 csf 4.33 $0.24 $2.91
3.4.2 1/wk 588 csf 4.33 $0.24 $6.11
3.4.2 1/mo 4,579 csf 1.00 $0.24 $10.99
3.4.4 1/wk 128 csf 4.33 $0.84 $4.66
3.4.4 1/wk 280 csf 4.33 $0.84 $10.18
3.4.4 1/wk 588 csf 4.33 $0.84 $21.39
3.4.4 1/mo 4,579 csf 1.00 $0.84 $38.46
3.4.8 AO 84 csf $4.72 $0.00
3.4.9 1/wk 2,632 csf 4.33 $0.51 $58.12
3.4.11 AO 2,632 csf $5.06 $0.00
3.4.14 3,952 csf $0.07 $0.00
3.4.32 1/wk 8 ea 4.33 $0.67 $23.21
3.4.34 1/wk 1 ea 4.33 $0.67 $2.90
3.4.36 1/wk 1 ea 4.33 $0.93 $4.03
3.4.39 1/wk 40 csf 4.33 $1.35 $2.34
$190.31
1.00
$190.31
Take Off: Carpet V-Tile Wood Rubber Q-Tile Concrete
Basement: 0 40 0 280 0 4,503
1st Floor: 680 44 372 0 128 0
2nd Floor: 976 0 248 0 0 0
3rd Floor: 976 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 2,632 84 620 280 128 4,503
Collect and Remove Trash (Rest Room and Laundry Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 27, Arnold Ave., Main Post Square Feet of Floor Area: 8,247
Price Calculation
Arnold Hall, Bachelor Housing
Custodial Tasks
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Clothes Washer and Clothes Dryer
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways (Quarry Tile Entries)
Mop Floors and Stairways (Quarry Tile Entries)
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Sweep and/or Dust Mop Floors and Stairways (Basement Floors and Front Wood Stairs)
Mop Floors and Stairways (Basement Floors and Front Wood
Stairs)
Clean Toilets and Seats
Scrub and Disinfect Rest Room Floors; 1 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
2/yr = 2/12 = 0.1666 Times Per Month
Sweep and/or Dust Mop Floors and Stairways (Laundry Rooms)
Sweep and/or Dust Mop Floors and Stairways (Back Wood and
VCT Stairs)
Mop Floors and Stairways (Laundry Rooms)
Mop Floors and Stairways (Back Wood and VCT Stairs)
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 2/wk 2 ea 8.66 $0.17 $2.94
3.4.2 1/wk 120 csf 4.33 $0.24 $1.25
3.4.4 1/wk 120 csf 4.33 $0.84 $4.36
3.4.9 1/wk 2,239 csf 4.33 $0.51 $49.44
3.4.11 AO 2,239 csf $5.06 $0.00
3.4.14 2,359 csf $0.07 $0.00
3.4.25 45 ea $0.67 $0.00
3.4.26 1/wk 1 ea 4.33 $0.67 $2.90
3.4.27 1/wk 16 lf 4.33 $0.34 $23.56
3.4.34 2/wk 2 ea 8.66 $0.67 $11.60
3.4.36 2/wk 2 ea 8.66 $0.93 $16.11
3.4.38 2 ea $1.69 $0.00
3.4.39 1/wk 160 csf 4.33 $1.35 $9.35
$121.52
1.00
$121.52
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 0 0 0 0 0 0
1st Floor: 2,239 0 0 0 280 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 2,239 0 0 0 280 02/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Clean Toilets and Seats
Clean Shower Stalls and/or Bathtubs
Scrub and Disinfect Rest Room Floors; 2 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Exterior Door Glass
Clean Kitchen/Kitchenette Sink
Clean Countertop
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Price Calculation
SWCPOC Administrative
Custodial Tasks
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 29, Arnold Ave., Main Post Square Feet of Floor Area: 2,519 graph Freq tities Unit Month Price Month
3.4.1 2/wk 7 ea 8.66 $0.17 $10.31
3.4.2 1/wk 13,017 csf 4.33 $0.24 $135.27
3.4.2 AO 1,618 csf $0.24 $0.00
3.4.4 1/wk 13,017 csf 4.33 $0.84 $473.45
3.4.4 AO 1,618 csf $0.84 $0.00
3.4.8 1/yr 12,968 csf 0.08 $4.72 $50.99
3.4.8 AO 1,618 csf $4.72 $0.00
3.4.9 1/wk 19,548 csf 4.33 $0.51 $431.68
3.4.9 AO 1,230 csf $0.51 $0.00
3.4.11 AO 20,778 csf $5.06 $0.00
3.4.14 35,030 csf $0.07 $0.00
3.4.17 2 ea $1.69 $0.00
3.4.23 24 sf $0.02 $0.00
3.4.25 2/wk 5 ea 8.66 $0.67 $29.01
3.4.34 2/wk 16 ea 8.66 $0.67 $92.84
3.4.36 2/wk 17 ea 8.66 $0.93 $136.91
3.4.37 2/wk 8 ea 8.66 $0.76 $52.65
3.4.39 1/wk 1,309 csf 4.33 $1.35 $76.52
$1,489.63
1.00
$1,489.63
Take Off: Carpet V-Tile Terraz Linol C-Tile Concrete
Basement: 1,238 0 6,024 0 236 30
Base Corr: 0 0 1,156 0 0 0
1st Floor: 9,490 801 0 0 279 24
1st Corr: 0 303 2,172 0 0 0
2nd Floor: 10,050 0 1,618 140 460 49
2nd Corr: 0 0 2,372 0 0 0
Totals: 20,778 1,104 13,342 140 975 103
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 200, Henry Ave., Main Post Square Feet of Floor Area: 36,442
Price Calculation
Patton Hall - NEC Administrative
Custodial Tasks
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways (All Except
Auditorium)
Mop Floors and Stairways (All Except Auditorium)
Vacuum Carpets, Rugs and Throwrugs (All Except Auditorium)
Clean Carpets, Rugs and Throwrugs
Strip and Rewax Resilient and Terrazzo Floor Surfaces
(Auditorium Only)
Vacuum Carpets, Rugs and Throwrugs (Auditorium Only)
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 7 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Frequency/Times Per Month Relationship:
Sweep and/or Dust Mop Floors and Stairways (Auditorium Only)
Mop Floors and Stairways (Auditorium Only)
Strip and Rewax Resilient and Terrazzo Floor Surfaces (All Except
Auditorium)
Polish Metal Work (In All Public Spaces)
Clean Exterior Door Glass
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
2/yr = 2/12 = 0.1666 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 2/wk 6 ea 8.66 $0.17 $8.83
3.4.2 1/wk 5,234 csf 4.33 $0.24 $54.39
3.4.4 1/wk 5,219 csf 4.33 $0.84 $189.83
3.4.4 AO 15 csf $0.84 $0.00
3.4.9 1/wk 253 csf 4.33 $0.51 $5.59
3.4.11 AO 147 csf $5.06 $0.00
3.4.11 AO 106 csf $5.06 $0.00
3.4.14 5,447 csf $0.07 $0.00
3.4.25 2/wk 2 ea 8.66 $0.67 $11.60
3.4.26 1/wk 3 ea 4.33 $0.67 $8.70
3.4.27 1/wk 55 lf 4.33 $0.34 $80.97
3.4.34 2/wk 8 ea 8.66 $0.67 $46.42
3.4.36 2/wk 8 ea 8.66 $0.93 $64.43
3.4.37 2/wk 3 ea 8.66 $0.76 $19.74
3.4.39 1/wk 462 csf 4.33 $1.35 $27.01
$517.52
1.00
$517.52
Take Off: Carpet C-Tile LV-Tile Wood Epoxy RVSTL
Basement: 0 0 0 0 0 0
1st Floor: 253 999 4,682 15 0 0
2nd Floor: 0 0 0 0 0 0
Corridors 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 253 999 4,682 15 0 0
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways (All Including
Stairway)
Mop Floors and Stairways (All Except Stairway)
Clean Carpets, Rugs and Throwrugs (Entrance Mat)
Clean Kitchen/Kitchenette Sink
Clean Countertop
Vacuum Carpets, Rugs and Throwrugs (Carpet and Entrance Mat)
Clean Carpets, Rugs and Throwrugs (All Except Entrance Mat)
Mop Floors and Stairways (Stairway Only)
Total Calculated Price Per Month
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 206, Custer Ave., Main Post Square Feet of Floor Area: 5,949
Price Calculation
Collect and Remove Trash (Rest Rooms, Break Room and
Student/Teacher Lounge Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020
Custodial Tasks
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Custodial Service Cost Coefficient
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 4 for
Subtotal
2/yr = 2/12 = 0.1666 Times Per Month
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Notes:
Frequency/Times Per Month Relationship:
2. The Second Floor Is Not Included In This Task.
1. Coffee Shop Is Not Included In This Task.
graph Freq tities Unit Month Price Month
3.4.1 2/wk 8 ea 8.66 $0.17 $11.78
3.4.2 1/wk 15,294 csf 4.33 $0.24 $158.94
3.4.4 1/wk 14,822 csf 4.33 $0.84 $539.11
3.4.8 1/yr 13,588 csf 0.08 $4.72 $53.42
3.4.9 1/wk 8,394 csf 4.33 $0.51 $185.36
3.4.11 AO 8,394 csf $5.06 $0.00
3.4.14 23,658 csf $0.07 $0.00
3.4.25 2/wk 6 ea 8.66 $0.67 $34.81
3.4.26 1/wk 2 ea 4.33 $0.67 $5.80
3.4.27 1/wk 12 lf 4.33 $0.34 $17.67
3.4.34 2/wk 12 ea 8.66 $0.67 $69.63
3.4.36 2/wk 15 ea 8.66 $0.93 $120.81
3.4.37 2/wk 3 ea 8.66 $0.76 $19.74
3.4.39 1/wk 1,404 csf 4.33 $1.35 $82.07
$1,299.14
1.00
$1,299.14
Take Off: Carpet V-Tile Terraz RVSTL C-Tile Epoxy
Basement: 2,136 2,549 1,550 0 498 140
1st Floor: 4,274 3,416 2,137 160 602 280
2nd Floor: 1,984 2,428 1,508 160 602 256
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 8,394 8,393 5,195 320 1,702 6762/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Note:
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 211, Custer Ave., Main Post Square Feet of Floor Area: 25,152
Price Calculation
Collect and Remove Trash (Rest Rooms and Breakrooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020
Wainwright Hall - Administrative
Custodial Tasks
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces (Note 1)
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
1. Strip and Rewax Resilient Tile Floor Surfaces Only. Do Not Strip and Rewax Terrazzo Floor
Surfaces or Rubber Stair Treads. Strip and Reseal Terrazzo Floor Surfaces.
Clean Kitchen/Kitchenette Sink
Clean Countertop
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 6 for
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Subtotal graph Freq tities Unit Month Price Month
3.4.1 2/wk 8 ea 8.66 $0.17 $11.78
3.4.2 1/wk 9,728 csf 4.33 $0.24 $101.09
3.4.4 1/wk 9,728 csf 4.33 $0.84 $353.83
3.4.8 1/yr 9,594 csf 0.08 $4.72 $37.72
3.4.9 1/wk 14,303 csf 4.33 $0.51 $315.85
3.4.11 AO 14,303 csf $5.06 $0.00
3.4.14 24,031 csf $0.07 $0.00
3.4.25 2/wk 6 ea 8.66 $0.67 $34.81
3.4.26 6 ea $0.67 $0.00
3.4.27 30 lf $0.34 $0.00
3.4.34 2/wk 15 ea 8.66 $0.67 $87.03
3.4.36 2/wk 13 ea 8.66 $0.93 $104.70
3.4.37 2/wk 5 ea 8.66 $0.76 $32.91
3.4.38 4 ea $1.69 $0.00
3.4.39 1/wk 922 csf 4.33 $1.35 $53.90
$1,133.62
1.00
$1,133.62
Take Off: Carpet V-Tile Terraz RVSTL C-Tile Concrete
Basement: 5,116 1,227 0 0 266 0
1st Floor: 7,448 1,251 134 0 328 0
2nd Floor: 1,739 7,116 0 0 328 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 14,303 9,594 134 0 922 02/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Subtotal
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Kitchen/Kitchenette Sink
Clean Countertop
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Clean Toilets and Seats
Clean Urinals
Clean Shower Stalls and/or Bathtubs
Scrub and Disinfect Rest Room Floors; 8 for
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 212, Custer Ave., Main Post Square Feet of Floor Area: 24,953
Price Calculation
DHR - Administrative
Custodial Tasks graph Freq tities Unit Month Price Month
3.4.1 2/wk 2 ea 8.66 $0.17 $2.94
3.4.2 1/wk 4,594 csf 4.33 $0.24 $47.74
3.4.4 1/wk 4,594 csf 4.33 $0.84 $167.09
3.4.8 1/yr 4,594 csf 0.08 $4.72 $18.06
3.4.14 4,594 csf $0.07 $0.00
3.4.25 2/wk 1 ea 8.66 $0.67 $5.80
3.4.26 1/wk 1 ea 4.33 $0.67 $2.90
3.4.27 1/wk 19 lf 4.33 $0.34 $27.97
3.4.34 2/wk 5 ea 8.66 $0.67 $29.01
3.4.36 2/wk 4 ea 8.66 $0.93 $32.22
3.4.37 2/wk 2 ea 8.66 $0.76 $13.16
3.4.39 1/wk 245 csf 4.33 $1.35 $14.32
$361.23
1.00
$361.23
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 0 4,594 0 0 245 0
1st Floor: 0 0 0 0 0 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 0 4,594 0 0 245 02/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 2 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Kitchen/Kitchenette Sink
Clean Countertop
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Price Calculation
Enlisted Barracks and Administrative
Custodial Tasks
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 214, Custer Ave., Main Post Square Feet of Floor Area: 4,839 graph Freq tities Unit Month Price Month
3.4.1 2/wk 11 ea 8.66 $0.17 $16.19
3.4.2 2/wk 5,630 csf 8.66 $0.24 $117.01
3.4.2 1/wk 2,389 csf 4.33 $0.24 $24.83
3.4.4 2/wk 5,630 csf 8.66 $0.84 $409.55
3.4.4 1/wk 2,389 csf 4.33 $0.84 $86.89
3.4.6 8/yr 5,630 csf 0.67 $1.08 $40.74
3.4.7 3/yr 5,630 csf 0.83 $2.70 $126.17
3.4.8 1/yr 8,019 csf 0.17 $4.72 $64.34
3.4.9 2/wk 1,906 csf 8.66 $0.51 $84.18
3.4.9 1/wk 12,347 csf 4.33 $0.51 $272.66
3.4.11 AO 14,253 csf $5.06 $0.00
3.4.14 19,821 csf $0.07 $0.00
3.4.14 1/wk 2,382 csf 4.33 $0.07 $7.22
3.4.25 2/wk 4 ea 8.66 $0.67 $23.21
3.4.26 1/wk 3 ea 4.33 $0.67 $8.70
3.4.27 1/wk 44 lf 4.33 $0.34 $64.78
3.4.34 2/wk 15 ea 8.66 $0.67 $87.03
3.4.36 2/wk 16 ea 8.66 $0.93 $128.86
3.4.37 2/wk 2 ea 8.66 $0.76 $13.16
3.4.38 2/wk 3 ea 8.66 $1.69 $43.91
3.4.39 1/wk 1,072 csf 4.33 $1.35 $62.66
$1,682.10
1.00
$1,682.10
Take Off: Carpet V-Tile RVSTL E-Mat C-Tile Concrete
L Level: 6,255 818 0 0 619 38
LL Corr: 1,669 1,878 0 0 0 0
U Level: 6,092 1,502 0 0 453 31
UL Corr. 180 3,386 366 57 0 0
0 0 0 0 0 0
Totals: 14,196 7,584 366 57 1,072 692/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Clean Toilets and Seats
Clean Urinals
Clean Shower Stalls and/or Bathtubs
Scrub and Disinfect Rest Room Floors; 9 for
Subtotal
4. 2 Pair Main Entry Door Glass, 14 Secondary Entry Door Glass (18 Doors).
5. All Exterior Prime Window Glass (18 Windows).
Notes:
1. All Except Administrative Areas.
2. Administrative Areas Only.
3. All Interior Door and Window Glass (21 Doors, 24 Windows)
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways (Corridors and
Stairways Only).
Mop Floors and Stairways (Corridors and Stairways Only).
Strip and Rewax Resilient and Terrazzo Floor Surfaces (All Areas)
Vacuum Carpets, Rugs and Throwrugs (Corridors Only)
Clean Carpets, Rugs and Throwrugs
Sweep and/or Dust Mop Floors and Stairways (All Except
Corridors and Stairways).
Mop Floors and Stairways (All Except Corridors and Stairways).
Vacuum Carpets, Rugs and Throwrugs (All Except Corridors)
Scrub and Rewax Resilient and Terrazzo Floor Surfaces
(Corridors and Stairways Only)
Dust Furnishings/Structural Elements < 7-1/2' AFF (Courtrooms
Only)
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Kitchen/Kitchenette Sink
Clean Countertop
Sprayand Buff Resilientand Terrazzo Floor Surfaces (Corridors and Stairways Only)
Collect and Remove Trash (Rest Rooms and Break Room Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 216, Custer Ave., Main Post Square Feet of Floor Area: 23,344
Price Calculation
SJA Courtrooms and Administrative graph Freq tities Unit Month Price Month
3.4.1 2/wk 4 ea 8.66 $0.17 $5.89
3.4.2 1/wk 12,826 csf 4.33 $0.24 $133.29
3.4.4 1/wk 12,826 csf 4.33 $0.84 $466.51
3.4.8 1/yr 12,620 csf 0.08 $4.72 $49.62
3.4.9 1/wk 1,675 csf 4.33 $0.51 $36.99
3.4.11 AO 1,675 csf $5.06 $0.00
3.4.14 14,185 csf $0.07 $0.00
3.4.25 2/wk 3 ea 8.66 $0.67 $17.41
3.4.26 1/wk 2 ea 4.33 $0.67 $5.80
3.4.27 1/wk 4 lf 4.33 $0.34 $5.89
3.4.34 2/wk 8 ea 8.66 $0.67 $46.42
3.4.36 2/wk 9 ea 8.66 $0.93 $72.48
3.4.37 2/wk 2 ea 8.66 $0.76 $13.16
3.4.39 1/wk 635 csf 4.33 $1.35 $37.12
$890.57
1.00
$890.57
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 0 3,052 0 206 525 0
1st Floor: 1,675 2,797 0 0 0 0
2nd Floor: 0 5,183 0 0 0 0
Corridors 0 1,588 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 1,675 12,620 0 206 525 0
Frequency/Times Per Month Relationship:
2/yr = 2/12 = 0.1666 Times Per Month
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Custodial Service Cost Coefficient
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 3 for
Subtotal
Notes:
1. Barton County Community College Spaces Are Still Included In This Task.
Total Calculated Price Per Month
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 217, Custer Ave., Main Post Square Feet of Floor Area: 15,026
Price Calculation
Collect and Remove Trash (Rest Rooms and Break Room Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020
ACES Facility and G1/USAG DHR CPC
Custodial Tasks
Sweep and/or Dust Mop Floors and Stairways (Corridors and
Stairways Only)
Mop Floors and Stairways (Corridors and Stairways Only)
Strip and Rewax Resilient and Terrazzo Floor Surfaces (All
Spaces)
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Clean Kitchen/Kitchenette Sink
Clean Countertop graph Freq tities Unit Month Price Month
3.4.1 2/wk 6 ea 8.66 $0.17 $8.83
3.4.2 1/wk 11,895 csf 4.33 $0.24 $123.61
3.4.2 3/wk 1,021 csf 13.00 $0.24 $31.86
3.4.2 1/mo 696 csf 1.00 $0.24 $1.67
3.4.4 1/wk 11,895 csf 4.33 $0.84 $432.64
3.4.4 3/wk 884 csf 13.00 $0.84 $96.53
3.4.4 1/mo 696 csf 1.00 $0.84 $5.85
3.4.8 1/yr 10,172 csf 0.08 $4.72 $39.99
3.4.9 1/wk 1,180 csf 4.33 $0.51 $26.06
3.4.11 AO 1,180 csf $5.06 $0.00
3.4.14 14,154 csf $0.07 $0.00
3.4.25 2/wk 2 ea 8.66 $0.67 $11.60
3.4.26 1/wk 2 ea 4.33 $0.67 $5.80
3.4.27 1/wk 12 lf 4.33 $0.34 $17.67
3.4.34 2/wk 7 ea 8.66 $0.67 $40.62
3.4.34 3/wk 1 ea 13.00 $0.67 $8.71
3.4.36 2/wk 6 ea 8.66 $0.93 $48.32
3.4.36 3/wk 1 ea 13.00 $0.93 $12.09
3.4.37 2/wk 1 ea 8.66 $0.76 $6.58
3.4.38 1/wk 3 ea 4.33 $1.69 $21.95
3.4.39 1/wk 581 csf 4.33 $1.35 $33.96
$974.36
1.00
$974.36
Take Off: Carpet V-Tile RAFS RVSTL C-Tile Other
Basement: 0 3,339 0 0 285 60
1st Floor: 0 4,324 137 138 512 72
2nd Floor: 1,180 2,509 0 138 190 1,726
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 1,180 10,172 137 276 987 1,858
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 219, Custer Ave., Main Post Square Feet of Floor Area: 14,610
Price Calculation
Daniel-Sabast Hall - DES Administrative
Custodial Tasks
Sweep and/or Dust Mop Floors and Stairways (See Note 1)
Mop Floors and Stairways (See Note 1)
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Subtotal
Clean Drinking Fountains
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Kitchen/Kitchenette Sink
Clean Countertop
Clean Lavatories, Vanities, Dispensers, Mirrors (See Note 1)
Clean Toilets and Seats (See Note 1)
Clean Urinals
Clean Shower Stalls and/or Bathtubs
Scrub and Disinfect Rest Room Floors; 6 for
Custodial Service Cost Coefficient
Notes:
1. All except MP Desk Operations and SRT Spaces.
2. MP Desk Operations Spaces Only.
Total Calculated Price Per Month
3. SRT Spaces Only.
2/yr = 2/12 = 0.1666 Times Per Month
Sweep and/or Dust Mop Floors and Stairways (See Note 2)
Sweep and/or Dust Mop Floors and Stairways (See Note 3)
Mop Floors and Stairways (See Note 2)
Mop Floors and Stairways (See Note 3)
Clean Lavatories, Vanities, Dispensers, Mirrors (See Note 2)
Clean Toilets and Seats (See Note 2)
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 2/wk 4 ea 8.66 $0.17 $5.89
3.4.2 1/wk 3,770 csf 4.33 $0.24 $39.18
3.4.4 1/wk 3,770 csf 4.33 $0.84 $137.12
3.4.8 1/yr 3,986 csf 0.08 $4.72 $15.67
3.4.9 1/wk 5,790 csf 4.33 $0.51 $127.86
3.4.11 AO 5,790 csf $5.06 $0.00
3.4.14 9,560 csf $0.07 $0.00
3.4.25 2/wk 2 ea 8.66 $0.67 $11.60
3.4.34 2/wk 7 ea 8.66 $0.67 $40.62
3.4.36 2/wk 9 ea 8.66 $0.93 $72.48
3.4.37 2/wk 3 ea 8.66 $0.76 $19.74
3.4.38 2 ea $1.69 $0.00
3.4.39 1/wk 651 csf 4.33 $1.35 $38.05
$508.22
1.00
$508.22
Take Off: Carpet V-Tile RVSTL Wood C-Tile Concrete
Basement: 0 1,799 0 0 0 0
1st Floor: 492 2,014 0 159 0 138
2nd Floor: 5,298 173 138 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 5,790 3,986 138 159 0 1382/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Clean Drinking Fountains
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Clean Toilets and Seats
Clean Urinals
Clean Shower Stalls and/or Bathtubs
Scrub and Disinfect Rest Room Floors; 4 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Dust Furnishings/Structural Elements < 7-1/2' AFF
Price Calculation
DES Administrative
Custodial Tasks
Collect and Remove Trash (Rest Rooms Only)
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 221, Custer Ave., Main Post Square Feet of Floor Area: 10,211 graph Freq tities Unit Month Price Month
3.4.1 2/wk 5 ea 8.66 $0.17 $7.36
3.4.2 1/wk 10,654 csf 4.33 $0.24 $110.72
3.4.4 1/wk 10,654 csf 4.33 $0.84 $387.51
3.4.8 1/yr 9,304 csf 0.08 $4.72 $36.58
3.4.9 1/wk 1,962 csf 4.33 $0.51 $43.33
3.4.11 AO 1,962 csf $5.06 $0.00
3.4.14 12,616 csf $0.07 $0.00
3.4.25 2/wk 2 ea 8.66 $0.67 $11.60
3.4.34 2/wk 6 ea 8.66 $0.67 $34.81
3.4.36 2/wk 6 ea 8.66 $0.93 $48.32
3.4.37 2/wk 3 ea 8.66 $0.76 $19.74
3.4.39 1/wk 462 csf 4.33 $1.35 $27.01
$726.98
1.00
$726.98
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 0 0 0 0 0 0
1st Floor: 1,720 9,514 0 0 0 0
2nd Floor: 242 1,602 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 1,962 11,116 0 0 0 02/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 5 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 222, Custer Ave., Main Post Square Feet of Floor Area: 13,078
Price Calculation
DPTMS Visual Information Support Center and SJA Trail Defense Services graph Freq tities Unit Month Price Month
3.4.1 4/wk 4 ea 17.33 $0.17 $11.78
3.4.2 4/wk 16,847 csf 17.33 $0.24 $700.70
3.4.2 0 csf $0.24 $0.00
3.4.4 4/wk 16,847 csf 17.33 $0.84 $2,452.45
3.4.4 0 csf $0.84 $0.00
3.4.8 0 csf $4.72 $0.00
3.4.14 16,847 csf $0.07 $0.00
3.4.25 4/wk 5 ea 17.33 $0.67 $58.06
3.4.34 4/wk 15 ea 17.33 $0.67 $174.17
3.4.36 4/wk 11 ea 17.33 $0.93 $177.29
3.4.37 4/wk 5 ea 17.33 $0.76 $65.85
3.4.39 4/wk 1,064 ea 17.33 $1.35 $248.93
$3,889.23
1.00
$3,889.23
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 0 0 0 0 0 0
1st Floor: 0 0 35 17,876 0 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 0 0 35 17,876 0 02/yr = 2/12 = 0.1666 Times Per Month
Sweep and/or Dust Mop Floors and Stairways (Note 2)
Mop Floors and Stairways (Note 2)
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Notes:
1. All SRP Spaces.
2. TISA Offices Only.
Scrub and Disinfect Rest Room Floors; 4 for
Subtotal
Clean Toilets and Seats
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Clean Urinals
Sweep and/or Dust Mop Floors and Stairways (Note 1)
Mop Floors and Stairways (Note 1)
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 229, Custer Ave., Main Post Square Feet of Floor Area: 17,911
Price Calculation
Polk Hall - SRP and TISA Facilitiy graph Freq tities Unit Month Price Month
3.4.1 1/mo 2 ea 1.00 $0.17 $0.34
3.4.2 1/mo 2,631 csf 1.00 $0.24 $6.31
3.4.4 1/mo 2,631 csf 1.00 $0.84 $22.10
3.4.8 1/yr 2,201 csf 0.08 $4.72 $8.65
3.4.14 2,631 csf $0.07 $0.00
3.4.25 1/mo 1 ea 1.00 $0.67 $0.67
3.4.34 1/mo 4 ea 1.00 $0.67 $2.68
3.4.36 1/mo 4 ea 1.00 $0.93 $3.72
3.4.37 1/mo 1 ea 1.00 $0.76 $0.76
3.4.39 1/mo 206 csf 1.00 $1.35 $2.78
$48.02
1.00
$48.02
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 0 162 0 0 0 380
1st Floor: 0 2,039 0 0 0 256
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 0 2,201 0 0 0 636
Price Calculation
ACES Facility
Custodial Tasks
1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 240, Beeman Pl., Main Post Square Feet of Floor Area: 2,837
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 2 for
Subtotal
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Custodial Service Cost Coefficient
Total Calculated Price Per Month
2/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 2/wk 2 ea 8.66 $0.17 $2.94
3.4.2 1/wk 3,824 csf 4.33 $0.24 $39.74
3.4.4 1/wk 3,824 csf 4.33 $0.84 $139.09
3.4.9 1/wk 550 csf 4.33 $0.51 $12.15
3.4.11 AO 550 csf $5.06 $0.00
3.4.14 4,374 csf $0.07 $0.00
3.4.25 0 ea $0.67 $0.00
3.4.34 2/wk 2 ea 8.66 $0.67 $11.60
3.4.36 2/wk 2 ea 8.66 $0.93 $16.11
3.4.37 0 ea $0.76 $0.00
3.4.39 1/wk 251 csf 4.33 $1.35 $14.67
$236.30
1.00
$236.30
Take Off: Carpet S-Vinyl RVSTL Epoxy V-Tile Concrete
Basement: 0 0 0 0 0 0
1st Floor: 550 4,075 0 0 0 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 550 4,075 0 0 0 02/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Clean Drinking Fountains
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 1 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Dust Furnishings/Structural Elements < 7-1/2' AFF
Price Calculation
DFMWR Administrative
Custodial Tasks
Collect and Remove Trash (Rest Rooms Only)
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 247, Cameron Ave., Main Post Square Feet of Floor Area: 4,625 graph Freq tities Unit Month Price Month
3.4.1 2/wk 2 ea 8.66 $0.17 $2.94
3.4.2 1/wk 1,772 csf 4.33 $0.24 $18.41
3.4.4 1/wk 518 csf 4.33 $0.84 $18.84
3.4.8 1/yr 624 csf 0.08 $4.72 $2.45
3.4.14 518 csf $0.07 $0.00
3.4.25 2/wk 1 ea 8.66 $0.67 $5.80
3.4.34 2/wk 2 ea 8.66 $0.67 $11.60
3.4.36 2/wk 2 ea 8.66 $0.93 $16.11
3.4.37 2/wk 1 ea 8.66 $0.76 $6.58
3.4.38 2 ea $1.69 $0.00
3.4.39 1/wk 106 csf 4.33 $1.35 $6.20
$88.95
1.00
$88.95
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 0 0 0 0 0 0
1st Floor: 0 624 0 0 0 1,254
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 0 624 0 0 0 1,2542/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Subtotal
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Clean Toilets and Seats
Clean Urinals
Clean Shower Stalls and/or Bathtubs
Scrub and Disinfect Rest Room Floors; 2 for
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 248, Stuart Ave., Main Post Square Feet of Floor Area: 1,878
Price Calculation
DES Equipment Maintenance and Storage graph Freq tities Unit Month Price Month
3.4.1 2/wk 4 ea 8.66 $0.17 $5.89
3.4.2 1/wk 229 csf 4.33 $0.24 $2.38
3.4.4 1/wk 229 csf 4.33 $0.84 $8.33
3.4.9 1/wk 8,752 csf 4.33 $0.51 $193.27
3.4.11 AO 8,752 csf $5.06 $0.00
3.4.14 8,981 csf $0.07 $0.00
3.4.25 2/wk 1 ea 8.66 $0.67 $5.80
3.4.26 1 ea $0.67 $0.00
3.4.27 6 lf $0.34 $0.00
3.4.34 2/wk 5 ea 8.66 $0.67 $29.01
3.4.36 2/wk 5 ea 8.66 $0.93 $40.27
3.4.37 2/wk 1 ea 8.66 $0.76 $6.58
3.4.39 1/wk 337 csf 4.33 $1.35 $19.70
$311.23
1.00
$311.23
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 0 0 0 0 0 0
1st Floor: 8,752 0 507 59 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 8,752 0 0 507 59 0
Collect and Remove Trash (Rest Rooms and Break Room Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020
DFMWR Administrative
Custodial Tasks
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Kitchen/Kitchenette Sink
Clean Countertop
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 253, Cameron Ave., Main Post Square Feet of Floor Area: 9,318
Price Calculation
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 3 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
2/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 1/wk 2 ea 4.33 $0.17 $1.47
3.4.2 1/wk 770 csf 4.33 $0.24 $8.00
3.4.4 1/wk 770 csf 4.33 $0.84 $28.01
3.4.8 1/yr 160 csf 0.08 $4.72 $0.63
3.4.14 770 csf $0.07 $0.00
3.4.25 1/wk 1 ea 4.33 $0.67 $2.90
3.4.34 1/wk 2 ea 4.33 $0.67 $5.80
3.4.36 1/wk 2 ea 4.33 $0.93 $8.05
3.4.37 1/wk 1 ea 4.33 $0.76 $3.29
3.4.39 1/wk 160 csf 4.33 $1.35 $9.35
$67.51
1.00
$67.51
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 0 0 0 0 0 0
1st Floor: 0 160 0 770 0 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 0 160 0 770 0 0
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 289, Cameron Ave., Main Post Square Feet of Floor Area: 930
Price Calculation
DES Equipment Maintenance and Storage
Custodial Tasks
Subtotal
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 2 for
Custodial Service Cost Coefficient
Total Calculated Price Per Month
2/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 2/wk 5 ea 8.66 $0.17 $7.36
3.4.2 1/wk 3,147 csf 4.33 $0.24 $32.70
3.4.4 1/wk 3,147 csf 4.33 $0.84 $114.46
3.4.9 1/wk 15,215 csf 4.33 $0.51 $335.99
3.4.11 AO 15,215 csf $5.06 $0.00
3.4.14 18,361 csf $0.07 $0.00
3.4.25 2/wk 4 ea 8.66 $0.67 $23.21
3.4.26 1/wk 1 ea 4.33 $0.67 $2.90
3.4.27 1/wk 5 lf 4.33 $0.34 $7.36
3.4.34 2/wk 5 ea 8.66 $0.67 $29.01
3.4.36 2/wk 8 ea 8.66 $0.93 $64.43
3.4.37 2/wk 1 ea 8.66 $0.76 $6.58
3.4.39 1/wk 463 csf 4.33 $1.35 $27.06
$651.08
1.00
$651.08
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 6,310 0 0 0 2,005 0
1st Floor: 8,905 0 96 0 1,605 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 15,215 0 96 0 3,610 0
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 301, Marshall Ave., Main Post Square Feet of Floor Area: 18,921
Price Calculation
CHRA-SW Administrative
Custodial Tasks
Collect and Remove Trash (Rest Rooms Only)
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 5 for
Subtotal
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Kitchen/Kitchenette Sink
Clean Countertop
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Custodial Service Cost Coefficient
Total Calculated Price Per Month
2/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 2/wk 4 ea 8.66 $0.17 $5.89
3.4.2 1/wk 1,013 csf 4.33 $0.24 $10.53
3.4.4 1/wk 1,013 csf 4.33 $0.84 $36.84
3.4.8 AO 723 csf $4.72 $0.00
3.4.9 1/wk 8,284 csf 4.33 $0.51 $182.94
3.4.11 AO 8,284 csf $5.06 $0.00
3.4.14 8,642 csf $0.07 $0.00
3.4.25 2/wk 2 ea 8.66 $0.67 $11.60
3.4.26 1/wk 1 ea 4.33 $0.67 $2.90
3.4.27 1/wk 4 lf 4.33 $0.34 $5.89
3.4.34 2/wk 8 ea 8.66 $0.67 $46.42
3.4.36 2/wk 9 ea 8.66 $0.93 $72.48
3.4.37 2/wk 2 ea 8.66 $0.76 $13.16
3.4.39 1/wk 644 csf 4.33 $1.35 $37.65
$426.30
1.00
$426.30
Take Off: Carpet V-Tile RAF Wood C-Tile Concrete
Basement: 3,714 35 620 0 334 0
1st Floor: 4,570 68 0 51 549 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 8,284 103 620 51 883 0
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020
CHRA-SW Administrative
Custodial Tasks
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Kitchen/Kitchenette Sink
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 302, Marshall Ave., Main Post Square Feet of Floor Area: 9,941
Price Calculation
Clean Countertop
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 4 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
2/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 2/wk 4 ea 8.66 $0.17 $5.89
3.4.2 1/wk 475 csf 4.33 $0.24 $4.94
3.4.4 1/wk 475 csf 4.33 $0.84 $17.28
3.4.8 AO 221 csf $4.72 $0.00
3.4.9 1/wk 10,465 csf 4.33 $0.51 $231.10
3.4.11 AO 10,465 csf $5.06 $0.00
3.4.14 10,896 csf $0.07 $0.00
3.4.25 2/wk 2 ea 8.66 $0.67 $11.60
3.4.34 2/wk 8 ea 8.66 $0.67 $46.42
3.4.36 2/wk 10 ea 8.66 $0.93 $80.54
3.4.37 2/wk 2 ea 8.66 $0.76 $13.16
3.4.39 1/wk 470 csf 4.33 $1.35 $27.47
$438.40
1.00
$438.40
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 4,879 74 0 0 375 0
1st Floor: 5,586 147 0 0 349 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 10,465 221 0 0 724 0
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 303, Marshall Ave., Main Post Square Feet of Floor Area: 11,410
Price Calculation
CHRA-SW Administrative
Custodial Tasks
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 4 for
Subtotal
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Custodial Service Cost Coefficient
Total Calculated Price Per Month
2/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month
3.4.1 2/wk 2 ea 8.66 $0.17 $2.94
3.4.2 1/wk 3,480 csf 4.33 $0.24 $36.16
3.4.4 1/wk 3,480 csf 4.33 $0.84 $126.57
3.4.8 AO 48 csf $4.72 $0.00
3.4.9 1/wk 6,268 csf 4.33 $0.51 $138.42
3.4.11 AO 6,268 csf $5.06 $0.00
3.4.14 9,700 csf $0.07 $0.00
3.4.25 2/wk 2 ea 8.66 $0.67 $11.60
3.4.26 1/wk 1 ea 4.33 $0.67 $2.90
3.4.27 1/wk 8 lf 4.33 $0.34 $11.78
3.4.34 2/wk 6 ea 8.66 $0.67 $34.81
3.4.36 2/wk 7 ea 8.66 $0.93 $56.38
3.4.37 2/wk 1 ea 8.66 $0.76 $6.58
3.4.39 1/wk 392 csf 4.33 $1.35 $22.91
$451.07
1.00
$451.07
Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete
Basement: 0 0 0 0 0 0
1st Floor: 6,268 48 0 0 3,824 0
2nd Floor: 0 0 0 0 0 0
3rd Floor: 0 0 0 0 0 0
4th Floor: 0 0 0 0 0 0
Totals: 6,268 48 0 0 3,824 02/yr = 2/12 = 0.1666 Times Per Month
Frequency/Times Per Month Relationship:
1/wk = 52(1)/12 = 4.33 Times Per Month
2/wk = 52(2)/12 = 8.66 Times Per Month
EOD = 52(2.5)/12 = 10.833 Times Per Month
5/wk = 52(5)/12 = 21.66 Times Per Month
1/yr = 1/12 = 0.0833 Times Per Month
Clean Countertop
Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves
Clean Toilets and Seats
Clean Urinals
Scrub and Disinfect Rest Room Floors; 2 for
Subtotal
Custodial Service Cost Coefficient
Total Calculated Price Per Month
Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas
Building & Location: 304, Marshall Ave., Main Post Square Feet of Floor Area: 10,140
Price Calculation
Collect and Remove Trash (Rest Rooms Only)
CUSTODIAL SERVICE JOB ORDER 1 December 2020
CHRA-SW Administrative
Custodial Tasks
Sweep and/or Dust Mop Floors and Stairways
Mop Floors and Stairways
Strip and Rewax Resilient and Terrazzo Floor Surfaces
Vacuum Carpets, Rugs and Throwrugs
Clean Carpets, Rugs and Throwrugs
Dust Furnishings/Structural Elements < 7-1/2' AFF
Clean Drinking Fountains
Clean Kitchen/Kitchenette Sink graph Freq tities Unit Month Price Month
3.4.1 2/wk 3 ea 8.66 $0.17 $4.42
3.4.2 1/wk 1,728 csf 4.33 $0.24 $17.96
3.4.4 1/wk 1,728 csf 4.33 $0.84 $62.85
3.4.9 1/wk 872 csf 4.33 $0.51 $19.26
3.4.11 AO 872 csf $5.06 $0.00
3.4.14 2,600 csf $0.07 $0.00
3.4.26 1/wk 1 ea 4.33 $0.67 $2.90
3.4.27 1/wk 8 lf 4.33…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .