TE7_Ch 1 - Job Orders (2020-06-24).pdf

PDF 1 MB Posted

Attached to
Fort Riley Custodial Services: Federal contract opportunity
Solicitation number
W911RX20R0003
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

View the file

Other files for this federal contract opportunity

Other files attached to Fort Riley Custodial Services:, newest first.
File Type Posted
AT 12 B Final Questions and answers.pdf PDF
AT 13 Sample Work Schedule.pdf PDF
AT 7 BS 20-24 Custodial Service (8-17-2020).xlsx XLSX spreadsheet
Amendment 4.pdf PDF
AT 7 updated_BS 20-24 Custod Serv (8-7-2020).xlsx XLSX spreadsheet
Amendment 3.pdf PDF
AT 12A Combi Site Vist nfo plus Q A.pdf PDF
TE 7 - Job Orders (6-24-2020).xlsx XLSX spreadsheet
Amendment _02.pdf PDF
AT 7_BS 20-24 Custodial Service (8-3-2020).xlsx XLSX spreadsheet
Questions from Site Visit (PW Reviewed).docx DOCX document
AT 11_Site Visit W911RX-20-R-0003.docx DOCX document
AT 7_Ch1 BS 20-24 Custodial(6-24-2020).xlsx XLSX spreadsheet
TE 7 - Job Orders (6-24-2020).docx DOCX document
Amendment_01.pdf PDF
AT 9 USA001557-20-DPC.PDF PDF
TE 6 - Floor Plan Drawings.docx DOCX document
00003.xlsx XLSX spreadsheet
AT 6 - PRS 2020-07-07.docx DOCX document
AT 5 - Deliverables 2020-07-07.docx DOCX document
AT 7 BS 20-24 Custodial Service (6-11-2020).xlsx XLSX spreadsheet
0003fp(1jun19).pdf PDF
TE 7 - Job Orders (6-11-2020).docx DOCX document
AT 3 - Samples of RRF.DOCX DOCX document
SF 1449 Solicitation.pdf PDF
AT 4 - CLS.PDF PDF
AT 1 Performance Work Statement.docx DOCX document
AT 8 Past Perf Questionaire.docx DOCX document
TE 1 - Location Maps.docx DOCX document
AT_2 Wage Determination.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Times Calculated

Para- Quan- Per Unit Price Per graph Freq tities Unit Month Price Month

3.4.1 1/wk 2 ea 4.33 $0.17 $1.47

3.4.2 1/wk 3,622 csf 4.33 $0.24 $37.64

3.4.4 1/wk 3,622 csf 4.33 $0.84 $131.74

3.4.8 AO 45 csf $4.72 $0.00

3.4.9 1/wk 767 csf 4.33 $0.51 $16.94

3.4.11 AO 767 csf $5.06 $0.00

3.4.12 AO 1,639 csf $3.03 $0.00

3.4.14 4,389 csf $0.07 $0.00

3.4.26 1 ea $0.67 $0.00

3.4.27 40 lf $0.34 $0.00

3.4.34 1/wk 3 ea 4.33 $0.67 $8.70

3.4.36 1/wk 2 ea 4.33 $0.93 $8.05

3.4.39 1/wk 142 csf 4.33 $1.35 $8.30

$212.85

1.00

$212.85

Take Off: Carpet V-Tile Wood RVSTL C-Tile Concrete

Basement: 0 0 0 0 2,080 0

1st Floor: 767 0 1,639 45 0 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 767 0 1,639 45 2,080 0

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 3, Barry Ave., Main Post Square Feet of Floor Area: 4,531

Clean and Rewax Wood Floor Surfaces

Price Calculation

St. Mary's Chapel

Custodial Tasks

Collect and Remove Trash (Rest Rooms Only)

Sweep and/or Dust Mop Floors and Stairways (Note 1)

Mop Floors and Stairways (Note 1)

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Clean Toilets and Seats

Scrub and Disinfect Rest Room Floors; 2 for

Subtotal

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Kitchen/Kitchenette Sink

Clean Countertop

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Custodial Service Cost Coefficient

Total Calculated Price Per Month

1. Includes Wood Strip Flooring.

Notes:

2/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 1/wk 2 ea 4.33 $0.17 $1.47

3.4.2 1/wk 2,260 csf 4.33 $0.24 $23.49

3.4.4 1/wk 2,260 csf 4.33 $0.84 $82.20

3.4.8 1/yr 361 csf 0.08 $4.72 $1.42

3.4.9 1/wk 4,296 csf 4.33 $0.51 $94.87

3.4.11 AO 407 csf $5.06 $0.00

3.4.11 AO 4,296 csf $5.06 $0.00

3.4.12 AO 2,039 csf $3.03 $0.00

3.4.14 6,556 csf $0.07 $0.00

3.4.26 1 ea $0.67 $0.00

3.4.27 6 lf $0.34 $0.00

3.4.34 1/wk 4 ea 4.33 $0.67 $11.60

3.4.36 1/wk 4 ea 4.33 $0.93 $16.11

3.4.37 1/wk 1 ea 4.33 $0.76 $3.29

3.4.39 1/wk 140 csf 4.33 $1.35 $8.18

$242.63

1.00

$242.63

Take Off: Carpet V-Tile Wood RVSTL C-Tile Concrete

Basement: 2,456 361 0 0 0 0

1st Floor: 1,840 0 2,039 0 0 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 4,296 361 2,039 0 0 02/yr = 2/12 = 0.1666 Times Per Month

Clean Carpets, Rugs and Throwrugs

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Clean Toilets and Seats

Clean Urinals

Clean Carpets, Rugs and Throwrugs (Child Care Room Only)

Clean and Rewax Wood Floor Surfaces

1. Includes Wood Strip Flooring.

Scrub and Disinfect Rest Room Floors; 2 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 6, Barry Ave., Main Post Square Feet of Floor Area: 6,696

Price Calculation

Notes:

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020

Main Post Chapel

Custodial Tasks

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Kitchen/Kitchenette Sink

Clean Countertop

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways (Note 1)

Mop Floors and Stairways (Note 1)

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs graph Freq tities Unit Month Price Month

3.4.1 1/wk 1 ea 4.33 $0.17 $0.74

3.4.2 1/wk 1,798 csf 4.33 $0.24 $18.68

3.4.4 1/wk 1,798 csf 4.33 $0.84 $65.40

3.4.9 1/wk 706 csf 4.33 $0.51 $15.59

3.4.11 AO 706 csf $5.06 $0.00

3.4.12 AO 2,318 csf $3.03 $0.00

3.4.14 2,318 csf $0.07 $0.00

3.4.34 1/wk 1 ea 4.33 $0.67 $2.90

3.4.36 1/wk 1 ea 4.33 $0.93 $4.03

3.4.39 1/wk 60 csf 4.33 $1.35 $3.51

$110.84

1.00

$110.84

Take Off: Carpet V-Tile Wood RVSTL C-Tile Concrete

Basement: 0 0 0 0 0 246

1st Floor: 463 0 923 0 0 0

2nd Floor: 243 0 689 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 706 0 1,612 0 0 246

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 24A, Sheridan Ave., Main Post Square Feet of Floor Area: 2,564

Price Calculation

Custer House Museum

Service is only provided from 1 May to 30 Sept.

Custodial Tasks

Sweep and/or Dust Mop Floors and Stairways (Note 1)

Mop Floors and Stairways (Note 1)

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Clean and Rewax Wood Floor Surfaces

Clean Toilets and Seats

Scrub and Disinfect Rest Room Floors; 1 for

Subtotal

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Custodial Service Cost Coefficient

Total Calculated Price Per Month

1. Includes Wood Strip Flooring.

Notes:

2/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 2/mo 1 ea 2.00 $0.17 $0.34

3.4.2 2/mo 1,190 csf 2.00 $0.24 $5.71

3.4.4 2/mo 1,190 csf 2.00 $0.84 $19.99

3.4.8 AO 295 csf $4.72 $0.00

3.4.9 2/mo 320 csf 2.00 $0.51 $3.26

3.4.11 AO 320 csf $5.06 $0.00

3.4.12 AO 760 csf $3.03 $0.00

3.4.14 1,510 csf $0.07 $0.00

3.4.34 2/mo 1 ea 2.00 $0.67 $1.34

3.4.36 2/mo 1 ea 2.00 $0.93 $1.86

3.4.38 2/mo 1 ea 2.00 $1.69 $3.38

3.4.39 2/mo 115 csf 2.00 $1.35 $3.11

$38.99

1.00

$38.99

Custodial tasks to be completed during the first and

Take Off: Carpet V-Tile Wood HP Lam C-Tile Concrete

Basement: 0 0 0 0 0 0

1st Floor: 320 180 602 250 0 0

2nd Floor: 0 115 158 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 320 295 760 250 0 0

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 24B, Sheridan Ave., Main Post Square Feet of Floor Area: 1,625

Price Calculation

Custer House Museum

Custodial Tasks

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways (Note 1)

Mop Floors and Stairways (Note 1)

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Clean and Rewax Wood Floor Surfaces

Clean Toilets and Seats

Clean Shower Stalls and/or Bathtubs

Scrub and Disinfect Rest Room Floors; 1 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Notes:

1. Includes Wood Strip Flooring.

third week of each month.

2/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 1/wk 5 ea 4.33 $0.17 $3.68

3.4.2 1/wk 128 csf 4.33 $0.24 $1.33

3.4.2 1/wk 280 csf 4.33 $0.24 $2.91

3.4.2 1/wk 588 csf 4.33 $0.24 $6.11

3.4.2 1/mo 4,579 csf 1.00 $0.24 $10.99

3.4.4 1/wk 128 csf 4.33 $0.84 $4.66

3.4.4 1/wk 280 csf 4.33 $0.84 $10.18

3.4.4 1/wk 588 csf 4.33 $0.84 $21.39

3.4.4 1/mo 4,579 csf 1.00 $0.84 $38.46

3.4.8 AO 84 csf $4.72 $0.00

3.4.9 1/wk 2,632 csf 4.33 $0.51 $58.12

3.4.11 AO 2,632 csf $5.06 $0.00

3.4.14 3,952 csf $0.07 $0.00

3.4.32 1/wk 8 ea 4.33 $0.67 $23.21

3.4.34 1/wk 1 ea 4.33 $0.67 $2.90

3.4.36 1/wk 1 ea 4.33 $0.93 $4.03

3.4.39 1/wk 40 csf 4.33 $1.35 $2.34

$190.31

1.00

$190.31

Take Off: Carpet V-Tile Wood Rubber Q-Tile Concrete

Basement: 0 40 0 280 0 4,503

1st Floor: 680 44 372 0 128 0

2nd Floor: 976 0 248 0 0 0

3rd Floor: 976 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 2,632 84 620 280 128 4,503

Collect and Remove Trash (Rest Room and Laundry Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 27, Arnold Ave., Main Post Square Feet of Floor Area: 8,247

Price Calculation

Arnold Hall, Bachelor Housing

Custodial Tasks

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Clothes Washer and Clothes Dryer

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways (Quarry Tile Entries)

Mop Floors and Stairways (Quarry Tile Entries)

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Sweep and/or Dust Mop Floors and Stairways (Basement Floors and Front Wood Stairs)

Mop Floors and Stairways (Basement Floors and Front Wood

Stairs)

Clean Toilets and Seats

Scrub and Disinfect Rest Room Floors; 1 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

2/yr = 2/12 = 0.1666 Times Per Month

Sweep and/or Dust Mop Floors and Stairways (Laundry Rooms)

Sweep and/or Dust Mop Floors and Stairways (Back Wood and

VCT Stairs)

Mop Floors and Stairways (Laundry Rooms)

Mop Floors and Stairways (Back Wood and VCT Stairs)

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 2/wk 2 ea 8.66 $0.17 $2.94

3.4.2 1/wk 120 csf 4.33 $0.24 $1.25

3.4.4 1/wk 120 csf 4.33 $0.84 $4.36

3.4.9 1/wk 2,239 csf 4.33 $0.51 $49.44

3.4.11 AO 2,239 csf $5.06 $0.00

3.4.14 2,359 csf $0.07 $0.00

3.4.25 45 ea $0.67 $0.00

3.4.26 1/wk 1 ea 4.33 $0.67 $2.90

3.4.27 1/wk 16 lf 4.33 $0.34 $23.56

3.4.34 2/wk 2 ea 8.66 $0.67 $11.60

3.4.36 2/wk 2 ea 8.66 $0.93 $16.11

3.4.38 2 ea $1.69 $0.00

3.4.39 1/wk 160 csf 4.33 $1.35 $9.35

$121.52

1.00

$121.52

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 0 0 0 0 0 0

1st Floor: 2,239 0 0 0 280 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 2,239 0 0 0 280 02/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Clean Toilets and Seats

Clean Shower Stalls and/or Bathtubs

Scrub and Disinfect Rest Room Floors; 2 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Exterior Door Glass

Clean Kitchen/Kitchenette Sink

Clean Countertop

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Price Calculation

SWCPOC Administrative

Custodial Tasks

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 29, Arnold Ave., Main Post Square Feet of Floor Area: 2,519 graph Freq tities Unit Month Price Month

3.4.1 2/wk 7 ea 8.66 $0.17 $10.31

3.4.2 1/wk 13,017 csf 4.33 $0.24 $135.27

3.4.2 AO 1,618 csf $0.24 $0.00

3.4.4 1/wk 13,017 csf 4.33 $0.84 $473.45

3.4.4 AO 1,618 csf $0.84 $0.00

3.4.8 1/yr 12,968 csf 0.08 $4.72 $50.99

3.4.8 AO 1,618 csf $4.72 $0.00

3.4.9 1/wk 19,548 csf 4.33 $0.51 $431.68

3.4.9 AO 1,230 csf $0.51 $0.00

3.4.11 AO 20,778 csf $5.06 $0.00

3.4.14 35,030 csf $0.07 $0.00

3.4.17 2 ea $1.69 $0.00

3.4.23 24 sf $0.02 $0.00

3.4.25 2/wk 5 ea 8.66 $0.67 $29.01

3.4.34 2/wk 16 ea 8.66 $0.67 $92.84

3.4.36 2/wk 17 ea 8.66 $0.93 $136.91

3.4.37 2/wk 8 ea 8.66 $0.76 $52.65

3.4.39 1/wk 1,309 csf 4.33 $1.35 $76.52

$1,489.63

1.00

$1,489.63

Take Off: Carpet V-Tile Terraz Linol C-Tile Concrete

Basement: 1,238 0 6,024 0 236 30

Base Corr: 0 0 1,156 0 0 0

1st Floor: 9,490 801 0 0 279 24

1st Corr: 0 303 2,172 0 0 0

2nd Floor: 10,050 0 1,618 140 460 49

2nd Corr: 0 0 2,372 0 0 0

Totals: 20,778 1,104 13,342 140 975 103

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 200, Henry Ave., Main Post Square Feet of Floor Area: 36,442

Price Calculation

Patton Hall - NEC Administrative

Custodial Tasks

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways (All Except

Auditorium)

Mop Floors and Stairways (All Except Auditorium)

Vacuum Carpets, Rugs and Throwrugs (All Except Auditorium)

Clean Carpets, Rugs and Throwrugs

Strip and Rewax Resilient and Terrazzo Floor Surfaces

(Auditorium Only)

Vacuum Carpets, Rugs and Throwrugs (Auditorium Only)

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 7 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Frequency/Times Per Month Relationship:

Sweep and/or Dust Mop Floors and Stairways (Auditorium Only)

Mop Floors and Stairways (Auditorium Only)

Strip and Rewax Resilient and Terrazzo Floor Surfaces (All Except

Auditorium)

Polish Metal Work (In All Public Spaces)

Clean Exterior Door Glass

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

2/yr = 2/12 = 0.1666 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 2/wk 6 ea 8.66 $0.17 $8.83

3.4.2 1/wk 5,234 csf 4.33 $0.24 $54.39

3.4.4 1/wk 5,219 csf 4.33 $0.84 $189.83

3.4.4 AO 15 csf $0.84 $0.00

3.4.9 1/wk 253 csf 4.33 $0.51 $5.59

3.4.11 AO 147 csf $5.06 $0.00

3.4.11 AO 106 csf $5.06 $0.00

3.4.14 5,447 csf $0.07 $0.00

3.4.25 2/wk 2 ea 8.66 $0.67 $11.60

3.4.26 1/wk 3 ea 4.33 $0.67 $8.70

3.4.27 1/wk 55 lf 4.33 $0.34 $80.97

3.4.34 2/wk 8 ea 8.66 $0.67 $46.42

3.4.36 2/wk 8 ea 8.66 $0.93 $64.43

3.4.37 2/wk 3 ea 8.66 $0.76 $19.74

3.4.39 1/wk 462 csf 4.33 $1.35 $27.01

$517.52

1.00

$517.52

Take Off: Carpet C-Tile LV-Tile Wood Epoxy RVSTL

Basement: 0 0 0 0 0 0

1st Floor: 253 999 4,682 15 0 0

2nd Floor: 0 0 0 0 0 0

Corridors 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 253 999 4,682 15 0 0

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways (All Including

Stairway)

Mop Floors and Stairways (All Except Stairway)

Clean Carpets, Rugs and Throwrugs (Entrance Mat)

Clean Kitchen/Kitchenette Sink

Clean Countertop

Vacuum Carpets, Rugs and Throwrugs (Carpet and Entrance Mat)

Clean Carpets, Rugs and Throwrugs (All Except Entrance Mat)

Mop Floors and Stairways (Stairway Only)

Total Calculated Price Per Month

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 206, Custer Ave., Main Post Square Feet of Floor Area: 5,949

Price Calculation

Collect and Remove Trash (Rest Rooms, Break Room and

Student/Teacher Lounge Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020

Custodial Tasks

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Custodial Service Cost Coefficient

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 4 for

Subtotal

2/yr = 2/12 = 0.1666 Times Per Month

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Notes:

Frequency/Times Per Month Relationship:

2. The Second Floor Is Not Included In This Task.

1. Coffee Shop Is Not Included In This Task.

graph Freq tities Unit Month Price Month

3.4.1 2/wk 8 ea 8.66 $0.17 $11.78

3.4.2 1/wk 15,294 csf 4.33 $0.24 $158.94

3.4.4 1/wk 14,822 csf 4.33 $0.84 $539.11

3.4.8 1/yr 13,588 csf 0.08 $4.72 $53.42

3.4.9 1/wk 8,394 csf 4.33 $0.51 $185.36

3.4.11 AO 8,394 csf $5.06 $0.00

3.4.14 23,658 csf $0.07 $0.00

3.4.25 2/wk 6 ea 8.66 $0.67 $34.81

3.4.26 1/wk 2 ea 4.33 $0.67 $5.80

3.4.27 1/wk 12 lf 4.33 $0.34 $17.67

3.4.34 2/wk 12 ea 8.66 $0.67 $69.63

3.4.36 2/wk 15 ea 8.66 $0.93 $120.81

3.4.37 2/wk 3 ea 8.66 $0.76 $19.74

3.4.39 1/wk 1,404 csf 4.33 $1.35 $82.07

$1,299.14

1.00

$1,299.14

Take Off: Carpet V-Tile Terraz RVSTL C-Tile Epoxy

Basement: 2,136 2,549 1,550 0 498 140

1st Floor: 4,274 3,416 2,137 160 602 280

2nd Floor: 1,984 2,428 1,508 160 602 256

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 8,394 8,393 5,195 320 1,702 6762/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Note:

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 211, Custer Ave., Main Post Square Feet of Floor Area: 25,152

Price Calculation

Collect and Remove Trash (Rest Rooms and Breakrooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020

Wainwright Hall - Administrative

Custodial Tasks

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces (Note 1)

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

1. Strip and Rewax Resilient Tile Floor Surfaces Only. Do Not Strip and Rewax Terrazzo Floor

Surfaces or Rubber Stair Treads. Strip and Reseal Terrazzo Floor Surfaces.

Clean Kitchen/Kitchenette Sink

Clean Countertop

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 6 for

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Subtotal graph Freq tities Unit Month Price Month

3.4.1 2/wk 8 ea 8.66 $0.17 $11.78

3.4.2 1/wk 9,728 csf 4.33 $0.24 $101.09

3.4.4 1/wk 9,728 csf 4.33 $0.84 $353.83

3.4.8 1/yr 9,594 csf 0.08 $4.72 $37.72

3.4.9 1/wk 14,303 csf 4.33 $0.51 $315.85

3.4.11 AO 14,303 csf $5.06 $0.00

3.4.14 24,031 csf $0.07 $0.00

3.4.25 2/wk 6 ea 8.66 $0.67 $34.81

3.4.26 6 ea $0.67 $0.00

3.4.27 30 lf $0.34 $0.00

3.4.34 2/wk 15 ea 8.66 $0.67 $87.03

3.4.36 2/wk 13 ea 8.66 $0.93 $104.70

3.4.37 2/wk 5 ea 8.66 $0.76 $32.91

3.4.38 4 ea $1.69 $0.00

3.4.39 1/wk 922 csf 4.33 $1.35 $53.90

$1,133.62

1.00

$1,133.62

Take Off: Carpet V-Tile Terraz RVSTL C-Tile Concrete

Basement: 5,116 1,227 0 0 266 0

1st Floor: 7,448 1,251 134 0 328 0

2nd Floor: 1,739 7,116 0 0 328 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 14,303 9,594 134 0 922 02/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Subtotal

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Kitchen/Kitchenette Sink

Clean Countertop

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Clean Toilets and Seats

Clean Urinals

Clean Shower Stalls and/or Bathtubs

Scrub and Disinfect Rest Room Floors; 8 for

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 212, Custer Ave., Main Post Square Feet of Floor Area: 24,953

Price Calculation

DHR - Administrative

Custodial Tasks graph Freq tities Unit Month Price Month

3.4.1 2/wk 2 ea 8.66 $0.17 $2.94

3.4.2 1/wk 4,594 csf 4.33 $0.24 $47.74

3.4.4 1/wk 4,594 csf 4.33 $0.84 $167.09

3.4.8 1/yr 4,594 csf 0.08 $4.72 $18.06

3.4.14 4,594 csf $0.07 $0.00

3.4.25 2/wk 1 ea 8.66 $0.67 $5.80

3.4.26 1/wk 1 ea 4.33 $0.67 $2.90

3.4.27 1/wk 19 lf 4.33 $0.34 $27.97

3.4.34 2/wk 5 ea 8.66 $0.67 $29.01

3.4.36 2/wk 4 ea 8.66 $0.93 $32.22

3.4.37 2/wk 2 ea 8.66 $0.76 $13.16

3.4.39 1/wk 245 csf 4.33 $1.35 $14.32

$361.23

1.00

$361.23

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 0 4,594 0 0 245 0

1st Floor: 0 0 0 0 0 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 0 4,594 0 0 245 02/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 2 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Kitchen/Kitchenette Sink

Clean Countertop

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Price Calculation

Enlisted Barracks and Administrative

Custodial Tasks

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 214, Custer Ave., Main Post Square Feet of Floor Area: 4,839 graph Freq tities Unit Month Price Month

3.4.1 2/wk 11 ea 8.66 $0.17 $16.19

3.4.2 2/wk 5,630 csf 8.66 $0.24 $117.01

3.4.2 1/wk 2,389 csf 4.33 $0.24 $24.83

3.4.4 2/wk 5,630 csf 8.66 $0.84 $409.55

3.4.4 1/wk 2,389 csf 4.33 $0.84 $86.89

3.4.6 8/yr 5,630 csf 0.67 $1.08 $40.74

3.4.7 3/yr 5,630 csf 0.83 $2.70 $126.17

3.4.8 1/yr 8,019 csf 0.17 $4.72 $64.34

3.4.9 2/wk 1,906 csf 8.66 $0.51 $84.18

3.4.9 1/wk 12,347 csf 4.33 $0.51 $272.66

3.4.11 AO 14,253 csf $5.06 $0.00

3.4.14 19,821 csf $0.07 $0.00

3.4.14 1/wk 2,382 csf 4.33 $0.07 $7.22

3.4.25 2/wk 4 ea 8.66 $0.67 $23.21

3.4.26 1/wk 3 ea 4.33 $0.67 $8.70

3.4.27 1/wk 44 lf 4.33 $0.34 $64.78

3.4.34 2/wk 15 ea 8.66 $0.67 $87.03

3.4.36 2/wk 16 ea 8.66 $0.93 $128.86

3.4.37 2/wk 2 ea 8.66 $0.76 $13.16

3.4.38 2/wk 3 ea 8.66 $1.69 $43.91

3.4.39 1/wk 1,072 csf 4.33 $1.35 $62.66

$1,682.10

1.00

$1,682.10

Take Off: Carpet V-Tile RVSTL E-Mat C-Tile Concrete

L Level: 6,255 818 0 0 619 38

LL Corr: 1,669 1,878 0 0 0 0

U Level: 6,092 1,502 0 0 453 31

UL Corr. 180 3,386 366 57 0 0

0 0 0 0 0 0

Totals: 14,196 7,584 366 57 1,072 692/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Clean Toilets and Seats

Clean Urinals

Clean Shower Stalls and/or Bathtubs

Scrub and Disinfect Rest Room Floors; 9 for

Subtotal

4. 2 Pair Main Entry Door Glass, 14 Secondary Entry Door Glass (18 Doors).

5. All Exterior Prime Window Glass (18 Windows).

Notes:

1. All Except Administrative Areas.

2. Administrative Areas Only.

3. All Interior Door and Window Glass (21 Doors, 24 Windows)

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways (Corridors and

Stairways Only).

Mop Floors and Stairways (Corridors and Stairways Only).

Strip and Rewax Resilient and Terrazzo Floor Surfaces (All Areas)

Vacuum Carpets, Rugs and Throwrugs (Corridors Only)

Clean Carpets, Rugs and Throwrugs

Sweep and/or Dust Mop Floors and Stairways (All Except

Corridors and Stairways).

Mop Floors and Stairways (All Except Corridors and Stairways).

Vacuum Carpets, Rugs and Throwrugs (All Except Corridors)

Scrub and Rewax Resilient and Terrazzo Floor Surfaces

(Corridors and Stairways Only)

Dust Furnishings/Structural Elements < 7-1/2' AFF (Courtrooms

Only)

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Kitchen/Kitchenette Sink

Clean Countertop

Sprayand Buff Resilientand Terrazzo Floor Surfaces (Corridors and Stairways Only)

Collect and Remove Trash (Rest Rooms and Break Room Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 216, Custer Ave., Main Post Square Feet of Floor Area: 23,344

Price Calculation

SJA Courtrooms and Administrative graph Freq tities Unit Month Price Month

3.4.1 2/wk 4 ea 8.66 $0.17 $5.89

3.4.2 1/wk 12,826 csf 4.33 $0.24 $133.29

3.4.4 1/wk 12,826 csf 4.33 $0.84 $466.51

3.4.8 1/yr 12,620 csf 0.08 $4.72 $49.62

3.4.9 1/wk 1,675 csf 4.33 $0.51 $36.99

3.4.11 AO 1,675 csf $5.06 $0.00

3.4.14 14,185 csf $0.07 $0.00

3.4.25 2/wk 3 ea 8.66 $0.67 $17.41

3.4.26 1/wk 2 ea 4.33 $0.67 $5.80

3.4.27 1/wk 4 lf 4.33 $0.34 $5.89

3.4.34 2/wk 8 ea 8.66 $0.67 $46.42

3.4.36 2/wk 9 ea 8.66 $0.93 $72.48

3.4.37 2/wk 2 ea 8.66 $0.76 $13.16

3.4.39 1/wk 635 csf 4.33 $1.35 $37.12

$890.57

1.00

$890.57

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 0 3,052 0 206 525 0

1st Floor: 1,675 2,797 0 0 0 0

2nd Floor: 0 5,183 0 0 0 0

Corridors 0 1,588 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 1,675 12,620 0 206 525 0

Frequency/Times Per Month Relationship:

2/yr = 2/12 = 0.1666 Times Per Month

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Custodial Service Cost Coefficient

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 3 for

Subtotal

Notes:

1. Barton County Community College Spaces Are Still Included In This Task.

Total Calculated Price Per Month

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 217, Custer Ave., Main Post Square Feet of Floor Area: 15,026

Price Calculation

Collect and Remove Trash (Rest Rooms and Break Room Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020

ACES Facility and G1/USAG DHR CPC

Custodial Tasks

Sweep and/or Dust Mop Floors and Stairways (Corridors and

Stairways Only)

Mop Floors and Stairways (Corridors and Stairways Only)

Strip and Rewax Resilient and Terrazzo Floor Surfaces (All

Spaces)

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Clean Kitchen/Kitchenette Sink

Clean Countertop graph Freq tities Unit Month Price Month

3.4.1 2/wk 6 ea 8.66 $0.17 $8.83

3.4.2 1/wk 11,895 csf 4.33 $0.24 $123.61

3.4.2 3/wk 1,021 csf 13.00 $0.24 $31.86

3.4.2 1/mo 696 csf 1.00 $0.24 $1.67

3.4.4 1/wk 11,895 csf 4.33 $0.84 $432.64

3.4.4 3/wk 884 csf 13.00 $0.84 $96.53

3.4.4 1/mo 696 csf 1.00 $0.84 $5.85

3.4.8 1/yr 10,172 csf 0.08 $4.72 $39.99

3.4.9 1/wk 1,180 csf 4.33 $0.51 $26.06

3.4.11 AO 1,180 csf $5.06 $0.00

3.4.14 14,154 csf $0.07 $0.00

3.4.25 2/wk 2 ea 8.66 $0.67 $11.60

3.4.26 1/wk 2 ea 4.33 $0.67 $5.80

3.4.27 1/wk 12 lf 4.33 $0.34 $17.67

3.4.34 2/wk 7 ea 8.66 $0.67 $40.62

3.4.34 3/wk 1 ea 13.00 $0.67 $8.71

3.4.36 2/wk 6 ea 8.66 $0.93 $48.32

3.4.36 3/wk 1 ea 13.00 $0.93 $12.09

3.4.37 2/wk 1 ea 8.66 $0.76 $6.58

3.4.38 1/wk 3 ea 4.33 $1.69 $21.95

3.4.39 1/wk 581 csf 4.33 $1.35 $33.96

$974.36

1.00

$974.36

Take Off: Carpet V-Tile RAFS RVSTL C-Tile Other

Basement: 0 3,339 0 0 285 60

1st Floor: 0 4,324 137 138 512 72

2nd Floor: 1,180 2,509 0 138 190 1,726

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 1,180 10,172 137 276 987 1,858

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 219, Custer Ave., Main Post Square Feet of Floor Area: 14,610

Price Calculation

Daniel-Sabast Hall - DES Administrative

Custodial Tasks

Sweep and/or Dust Mop Floors and Stairways (See Note 1)

Mop Floors and Stairways (See Note 1)

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Subtotal

Clean Drinking Fountains

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Kitchen/Kitchenette Sink

Clean Countertop

Clean Lavatories, Vanities, Dispensers, Mirrors (See Note 1)

Clean Toilets and Seats (See Note 1)

Clean Urinals

Clean Shower Stalls and/or Bathtubs

Scrub and Disinfect Rest Room Floors; 6 for

Custodial Service Cost Coefficient

Notes:

1. All except MP Desk Operations and SRT Spaces.

2. MP Desk Operations Spaces Only.

Total Calculated Price Per Month

3. SRT Spaces Only.

2/yr = 2/12 = 0.1666 Times Per Month

Sweep and/or Dust Mop Floors and Stairways (See Note 2)

Sweep and/or Dust Mop Floors and Stairways (See Note 3)

Mop Floors and Stairways (See Note 2)

Mop Floors and Stairways (See Note 3)

Clean Lavatories, Vanities, Dispensers, Mirrors (See Note 2)

Clean Toilets and Seats (See Note 2)

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 2/wk 4 ea 8.66 $0.17 $5.89

3.4.2 1/wk 3,770 csf 4.33 $0.24 $39.18

3.4.4 1/wk 3,770 csf 4.33 $0.84 $137.12

3.4.8 1/yr 3,986 csf 0.08 $4.72 $15.67

3.4.9 1/wk 5,790 csf 4.33 $0.51 $127.86

3.4.11 AO 5,790 csf $5.06 $0.00

3.4.14 9,560 csf $0.07 $0.00

3.4.25 2/wk 2 ea 8.66 $0.67 $11.60

3.4.34 2/wk 7 ea 8.66 $0.67 $40.62

3.4.36 2/wk 9 ea 8.66 $0.93 $72.48

3.4.37 2/wk 3 ea 8.66 $0.76 $19.74

3.4.38 2 ea $1.69 $0.00

3.4.39 1/wk 651 csf 4.33 $1.35 $38.05

$508.22

1.00

$508.22

Take Off: Carpet V-Tile RVSTL Wood C-Tile Concrete

Basement: 0 1,799 0 0 0 0

1st Floor: 492 2,014 0 159 0 138

2nd Floor: 5,298 173 138 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 5,790 3,986 138 159 0 1382/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Clean Drinking Fountains

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Clean Toilets and Seats

Clean Urinals

Clean Shower Stalls and/or Bathtubs

Scrub and Disinfect Rest Room Floors; 4 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Dust Furnishings/Structural Elements < 7-1/2' AFF

Price Calculation

DES Administrative

Custodial Tasks

Collect and Remove Trash (Rest Rooms Only)

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 221, Custer Ave., Main Post Square Feet of Floor Area: 10,211 graph Freq tities Unit Month Price Month

3.4.1 2/wk 5 ea 8.66 $0.17 $7.36

3.4.2 1/wk 10,654 csf 4.33 $0.24 $110.72

3.4.4 1/wk 10,654 csf 4.33 $0.84 $387.51

3.4.8 1/yr 9,304 csf 0.08 $4.72 $36.58

3.4.9 1/wk 1,962 csf 4.33 $0.51 $43.33

3.4.11 AO 1,962 csf $5.06 $0.00

3.4.14 12,616 csf $0.07 $0.00

3.4.25 2/wk 2 ea 8.66 $0.67 $11.60

3.4.34 2/wk 6 ea 8.66 $0.67 $34.81

3.4.36 2/wk 6 ea 8.66 $0.93 $48.32

3.4.37 2/wk 3 ea 8.66 $0.76 $19.74

3.4.39 1/wk 462 csf 4.33 $1.35 $27.01

$726.98

1.00

$726.98

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 0 0 0 0 0 0

1st Floor: 1,720 9,514 0 0 0 0

2nd Floor: 242 1,602 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 1,962 11,116 0 0 0 02/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 5 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 222, Custer Ave., Main Post Square Feet of Floor Area: 13,078

Price Calculation

DPTMS Visual Information Support Center and SJA Trail Defense Services graph Freq tities Unit Month Price Month

3.4.1 4/wk 4 ea 17.33 $0.17 $11.78

3.4.2 4/wk 16,847 csf 17.33 $0.24 $700.70

3.4.2 0 csf $0.24 $0.00

3.4.4 4/wk 16,847 csf 17.33 $0.84 $2,452.45

3.4.4 0 csf $0.84 $0.00

3.4.8 0 csf $4.72 $0.00

3.4.14 16,847 csf $0.07 $0.00

3.4.25 4/wk 5 ea 17.33 $0.67 $58.06

3.4.34 4/wk 15 ea 17.33 $0.67 $174.17

3.4.36 4/wk 11 ea 17.33 $0.93 $177.29

3.4.37 4/wk 5 ea 17.33 $0.76 $65.85

3.4.39 4/wk 1,064 ea 17.33 $1.35 $248.93

$3,889.23

1.00

$3,889.23

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 0 0 0 0 0 0

1st Floor: 0 0 35 17,876 0 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 0 0 35 17,876 0 02/yr = 2/12 = 0.1666 Times Per Month

Sweep and/or Dust Mop Floors and Stairways (Note 2)

Mop Floors and Stairways (Note 2)

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Notes:

1. All SRP Spaces.

2. TISA Offices Only.

Scrub and Disinfect Rest Room Floors; 4 for

Subtotal

Clean Toilets and Seats

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Clean Urinals

Sweep and/or Dust Mop Floors and Stairways (Note 1)

Mop Floors and Stairways (Note 1)

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 229, Custer Ave., Main Post Square Feet of Floor Area: 17,911

Price Calculation

Polk Hall - SRP and TISA Facilitiy graph Freq tities Unit Month Price Month

3.4.1 1/mo 2 ea 1.00 $0.17 $0.34

3.4.2 1/mo 2,631 csf 1.00 $0.24 $6.31

3.4.4 1/mo 2,631 csf 1.00 $0.84 $22.10

3.4.8 1/yr 2,201 csf 0.08 $4.72 $8.65

3.4.14 2,631 csf $0.07 $0.00

3.4.25 1/mo 1 ea 1.00 $0.67 $0.67

3.4.34 1/mo 4 ea 1.00 $0.67 $2.68

3.4.36 1/mo 4 ea 1.00 $0.93 $3.72

3.4.37 1/mo 1 ea 1.00 $0.76 $0.76

3.4.39 1/mo 206 csf 1.00 $1.35 $2.78

$48.02

1.00

$48.02

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 0 162 0 0 0 380

1st Floor: 0 2,039 0 0 0 256

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 0 2,201 0 0 0 636

Price Calculation

ACES Facility

Custodial Tasks

1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 240, Beeman Pl., Main Post Square Feet of Floor Area: 2,837

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 2 for

Subtotal

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Custodial Service Cost Coefficient

Total Calculated Price Per Month

2/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 2/wk 2 ea 8.66 $0.17 $2.94

3.4.2 1/wk 3,824 csf 4.33 $0.24 $39.74

3.4.4 1/wk 3,824 csf 4.33 $0.84 $139.09

3.4.9 1/wk 550 csf 4.33 $0.51 $12.15

3.4.11 AO 550 csf $5.06 $0.00

3.4.14 4,374 csf $0.07 $0.00

3.4.25 0 ea $0.67 $0.00

3.4.34 2/wk 2 ea 8.66 $0.67 $11.60

3.4.36 2/wk 2 ea 8.66 $0.93 $16.11

3.4.37 0 ea $0.76 $0.00

3.4.39 1/wk 251 csf 4.33 $1.35 $14.67

$236.30

1.00

$236.30

Take Off: Carpet S-Vinyl RVSTL Epoxy V-Tile Concrete

Basement: 0 0 0 0 0 0

1st Floor: 550 4,075 0 0 0 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 550 4,075 0 0 0 02/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Clean Drinking Fountains

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 1 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Dust Furnishings/Structural Elements < 7-1/2' AFF

Price Calculation

DFMWR Administrative

Custodial Tasks

Collect and Remove Trash (Rest Rooms Only)

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 247, Cameron Ave., Main Post Square Feet of Floor Area: 4,625 graph Freq tities Unit Month Price Month

3.4.1 2/wk 2 ea 8.66 $0.17 $2.94

3.4.2 1/wk 1,772 csf 4.33 $0.24 $18.41

3.4.4 1/wk 518 csf 4.33 $0.84 $18.84

3.4.8 1/yr 624 csf 0.08 $4.72 $2.45

3.4.14 518 csf $0.07 $0.00

3.4.25 2/wk 1 ea 8.66 $0.67 $5.80

3.4.34 2/wk 2 ea 8.66 $0.67 $11.60

3.4.36 2/wk 2 ea 8.66 $0.93 $16.11

3.4.37 2/wk 1 ea 8.66 $0.76 $6.58

3.4.38 2 ea $1.69 $0.00

3.4.39 1/wk 106 csf 4.33 $1.35 $6.20

$88.95

1.00

$88.95

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 0 0 0 0 0 0

1st Floor: 0 624 0 0 0 1,254

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 0 624 0 0 0 1,2542/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Subtotal

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Clean Toilets and Seats

Clean Urinals

Clean Shower Stalls and/or Bathtubs

Scrub and Disinfect Rest Room Floors; 2 for

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 248, Stuart Ave., Main Post Square Feet of Floor Area: 1,878

Price Calculation

DES Equipment Maintenance and Storage graph Freq tities Unit Month Price Month

3.4.1 2/wk 4 ea 8.66 $0.17 $5.89

3.4.2 1/wk 229 csf 4.33 $0.24 $2.38

3.4.4 1/wk 229 csf 4.33 $0.84 $8.33

3.4.9 1/wk 8,752 csf 4.33 $0.51 $193.27

3.4.11 AO 8,752 csf $5.06 $0.00

3.4.14 8,981 csf $0.07 $0.00

3.4.25 2/wk 1 ea 8.66 $0.67 $5.80

3.4.26 1 ea $0.67 $0.00

3.4.27 6 lf $0.34 $0.00

3.4.34 2/wk 5 ea 8.66 $0.67 $29.01

3.4.36 2/wk 5 ea 8.66 $0.93 $40.27

3.4.37 2/wk 1 ea 8.66 $0.76 $6.58

3.4.39 1/wk 337 csf 4.33 $1.35 $19.70

$311.23

1.00

$311.23

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 0 0 0 0 0 0

1st Floor: 8,752 0 507 59 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 8,752 0 0 507 59 0

Collect and Remove Trash (Rest Rooms and Break Room Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020

DFMWR Administrative

Custodial Tasks

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Kitchen/Kitchenette Sink

Clean Countertop

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 253, Cameron Ave., Main Post Square Feet of Floor Area: 9,318

Price Calculation

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 3 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

2/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 1/wk 2 ea 4.33 $0.17 $1.47

3.4.2 1/wk 770 csf 4.33 $0.24 $8.00

3.4.4 1/wk 770 csf 4.33 $0.84 $28.01

3.4.8 1/yr 160 csf 0.08 $4.72 $0.63

3.4.14 770 csf $0.07 $0.00

3.4.25 1/wk 1 ea 4.33 $0.67 $2.90

3.4.34 1/wk 2 ea 4.33 $0.67 $5.80

3.4.36 1/wk 2 ea 4.33 $0.93 $8.05

3.4.37 1/wk 1 ea 4.33 $0.76 $3.29

3.4.39 1/wk 160 csf 4.33 $1.35 $9.35

$67.51

1.00

$67.51

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 0 0 0 0 0 0

1st Floor: 0 160 0 770 0 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 0 160 0 770 0 0

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 289, Cameron Ave., Main Post Square Feet of Floor Area: 930

Price Calculation

DES Equipment Maintenance and Storage

Custodial Tasks

Subtotal

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 2 for

Custodial Service Cost Coefficient

Total Calculated Price Per Month

2/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 2/wk 5 ea 8.66 $0.17 $7.36

3.4.2 1/wk 3,147 csf 4.33 $0.24 $32.70

3.4.4 1/wk 3,147 csf 4.33 $0.84 $114.46

3.4.9 1/wk 15,215 csf 4.33 $0.51 $335.99

3.4.11 AO 15,215 csf $5.06 $0.00

3.4.14 18,361 csf $0.07 $0.00

3.4.25 2/wk 4 ea 8.66 $0.67 $23.21

3.4.26 1/wk 1 ea 4.33 $0.67 $2.90

3.4.27 1/wk 5 lf 4.33 $0.34 $7.36

3.4.34 2/wk 5 ea 8.66 $0.67 $29.01

3.4.36 2/wk 8 ea 8.66 $0.93 $64.43

3.4.37 2/wk 1 ea 8.66 $0.76 $6.58

3.4.39 1/wk 463 csf 4.33 $1.35 $27.06

$651.08

1.00

$651.08

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 6,310 0 0 0 2,005 0

1st Floor: 8,905 0 96 0 1,605 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 15,215 0 96 0 3,610 0

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 301, Marshall Ave., Main Post Square Feet of Floor Area: 18,921

Price Calculation

CHRA-SW Administrative

Custodial Tasks

Collect and Remove Trash (Rest Rooms Only)

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 5 for

Subtotal

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Kitchen/Kitchenette Sink

Clean Countertop

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Custodial Service Cost Coefficient

Total Calculated Price Per Month

2/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 2/wk 4 ea 8.66 $0.17 $5.89

3.4.2 1/wk 1,013 csf 4.33 $0.24 $10.53

3.4.4 1/wk 1,013 csf 4.33 $0.84 $36.84

3.4.8 AO 723 csf $4.72 $0.00

3.4.9 1/wk 8,284 csf 4.33 $0.51 $182.94

3.4.11 AO 8,284 csf $5.06 $0.00

3.4.14 8,642 csf $0.07 $0.00

3.4.25 2/wk 2 ea 8.66 $0.67 $11.60

3.4.26 1/wk 1 ea 4.33 $0.67 $2.90

3.4.27 1/wk 4 lf 4.33 $0.34 $5.89

3.4.34 2/wk 8 ea 8.66 $0.67 $46.42

3.4.36 2/wk 9 ea 8.66 $0.93 $72.48

3.4.37 2/wk 2 ea 8.66 $0.76 $13.16

3.4.39 1/wk 644 csf 4.33 $1.35 $37.65

$426.30

1.00

$426.30

Take Off: Carpet V-Tile RAF Wood C-Tile Concrete

Basement: 3,714 35 620 0 334 0

1st Floor: 4,570 68 0 51 549 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 8,284 103 620 51 883 0

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020

CHRA-SW Administrative

Custodial Tasks

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Kitchen/Kitchenette Sink

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 302, Marshall Ave., Main Post Square Feet of Floor Area: 9,941

Price Calculation

Clean Countertop

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 4 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

2/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 2/wk 4 ea 8.66 $0.17 $5.89

3.4.2 1/wk 475 csf 4.33 $0.24 $4.94

3.4.4 1/wk 475 csf 4.33 $0.84 $17.28

3.4.8 AO 221 csf $4.72 $0.00

3.4.9 1/wk 10,465 csf 4.33 $0.51 $231.10

3.4.11 AO 10,465 csf $5.06 $0.00

3.4.14 10,896 csf $0.07 $0.00

3.4.25 2/wk 2 ea 8.66 $0.67 $11.60

3.4.34 2/wk 8 ea 8.66 $0.67 $46.42

3.4.36 2/wk 10 ea 8.66 $0.93 $80.54

3.4.37 2/wk 2 ea 8.66 $0.76 $13.16

3.4.39 1/wk 470 csf 4.33 $1.35 $27.47

$438.40

1.00

$438.40

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 4,879 74 0 0 375 0

1st Floor: 5,586 147 0 0 349 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 10,465 221 0 0 724 0

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020 Page 1 of 1

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 303, Marshall Ave., Main Post Square Feet of Floor Area: 11,410

Price Calculation

CHRA-SW Administrative

Custodial Tasks

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 4 for

Subtotal

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Custodial Service Cost Coefficient

Total Calculated Price Per Month

2/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month graph Freq tities Unit Month Price Month

3.4.1 2/wk 2 ea 8.66 $0.17 $2.94

3.4.2 1/wk 3,480 csf 4.33 $0.24 $36.16

3.4.4 1/wk 3,480 csf 4.33 $0.84 $126.57

3.4.8 AO 48 csf $4.72 $0.00

3.4.9 1/wk 6,268 csf 4.33 $0.51 $138.42

3.4.11 AO 6,268 csf $5.06 $0.00

3.4.14 9,700 csf $0.07 $0.00

3.4.25 2/wk 2 ea 8.66 $0.67 $11.60

3.4.26 1/wk 1 ea 4.33 $0.67 $2.90

3.4.27 1/wk 8 lf 4.33 $0.34 $11.78

3.4.34 2/wk 6 ea 8.66 $0.67 $34.81

3.4.36 2/wk 7 ea 8.66 $0.93 $56.38

3.4.37 2/wk 1 ea 8.66 $0.76 $6.58

3.4.39 1/wk 392 csf 4.33 $1.35 $22.91

$451.07

1.00

$451.07

Take Off: Carpet V-Tile RVSTL Epoxy C-Tile Concrete

Basement: 0 0 0 0 0 0

1st Floor: 6,268 48 0 0 3,824 0

2nd Floor: 0 0 0 0 0 0

3rd Floor: 0 0 0 0 0 0

4th Floor: 0 0 0 0 0 0

Totals: 6,268 48 0 0 3,824 02/yr = 2/12 = 0.1666 Times Per Month

Frequency/Times Per Month Relationship:

1/wk = 52(1)/12 = 4.33 Times Per Month

2/wk = 52(2)/12 = 8.66 Times Per Month

EOD = 52(2.5)/12 = 10.833 Times Per Month

5/wk = 52(5)/12 = 21.66 Times Per Month

1/yr = 1/12 = 0.0833 Times Per Month

Clean Countertop

Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves

Clean Toilets and Seats

Clean Urinals

Scrub and Disinfect Rest Room Floors; 2 for

Subtotal

Custodial Service Cost Coefficient

Total Calculated Price Per Month

Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0000 / Custodial Service for Fort Riley, Kansas

Building & Location: 304, Marshall Ave., Main Post Square Feet of Floor Area: 10,140

Price Calculation

Collect and Remove Trash (Rest Rooms Only)

CUSTODIAL SERVICE JOB ORDER 1 December 2020

CHRA-SW Administrative

Custodial Tasks

Sweep and/or Dust Mop Floors and Stairways

Mop Floors and Stairways

Strip and Rewax Resilient and Terrazzo Floor Surfaces

Vacuum Carpets, Rugs and Throwrugs

Clean Carpets, Rugs and Throwrugs

Dust Furnishings/Structural Elements < 7-1/2' AFF

Clean Drinking Fountains

Clean Kitchen/Kitchenette Sink graph Freq tities Unit Month Price Month

3.4.1 2/wk 3 ea 8.66 $0.17 $4.42

3.4.2 1/wk 1,728 csf 4.33 $0.24 $17.96

3.4.4 1/wk 1,728 csf 4.33 $0.84 $62.85

3.4.9 1/wk 872 csf 4.33 $0.51 $19.26

3.4.11 AO 872 csf $5.06 $0.00

3.4.14 2,600 csf $0.07 $0.00

3.4.26 1/wk 1 ea 4.33 $0.67 $2.90

3.4.27 1/wk 8 lf 4.33…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .