TE 6 - Floor Plan Drawings.docx

DOCX document 17 KB Posted

Attached to
Fort Riley Custodial Services: Federal contract opportunity
Solicitation number
W911RX20R0003
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

View the file

Other files for this federal contract opportunity

Other files attached to Fort Riley Custodial Services:, newest first.
File Type Posted
Amendment 4.pdf PDF
AT 13 Sample Work Schedule.pdf PDF
AT 7 BS 20-24 Custodial Service (8-17-2020).xlsx XLSX spreadsheet
AT 12 B Final Questions and answers.pdf PDF
AT 7 updated_BS 20-24 Custod Serv (8-7-2020).xlsx XLSX spreadsheet
Amendment 3.pdf PDF
AT 12A Combi Site Vist nfo plus Q A.pdf PDF
Questions from Site Visit (PW Reviewed).docx DOCX document
Amendment _02.pdf PDF
AT 7_BS 20-24 Custodial Service (8-3-2020).xlsx XLSX spreadsheet
TE 7 - Job Orders (6-24-2020).xlsx XLSX spreadsheet
AT 11_Site Visit W911RX-20-R-0003.docx DOCX document
TE7_Ch 1 - Job Orders (2020-06-24).pdf PDF
Amendment_01.pdf PDF
AT 9 USA001557-20-DPC.PDF PDF
AT 7_Ch1 BS 20-24 Custodial(6-24-2020).xlsx XLSX spreadsheet
TE 7 - Job Orders (6-24-2020).docx DOCX document
00003.xlsx XLSX spreadsheet
AT 6 - PRS 2020-07-07.docx DOCX document
TE 1 - Location Maps.docx DOCX document
AT_2 Wage Determination.pdf PDF
0003fp(1jun19).pdf PDF
TE 7 - Job Orders (6-11-2020).docx DOCX document
AT 3 - Samples of RRF.DOCX DOCX document
SF 1449 Solicitation.pdf PDF
AT 4 - CLS.PDF PDF
AT 1 Performance Work Statement.docx DOCX document
AT 8 Past Perf Questionaire.docx DOCX document
AT 5 - Deliverables 2020-07-07.docx DOCX document
AT 7 BS 20-24 Custodial Service (6-11-2020).xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 6

Building Floor Plan Drawings

1. General: This technical exhibit contains floor plans drawings for each building in the contract. Every effort has been made to provide accurate floor plan drawings for each building. Each room in each building was visited to verify architectural features of the buildings, types of floor coverings, locations of rest rooms and types and numbers of fixtures, and areas requiring custodial service. The following floor plans were drawn showing this information and square footage of each room was calculated and entered on the drawings.

2. Drawing Legend:

2.1 Type of Floor:

"A"
Resilient Athletic Surfacing
"B"
Rubber or Vinyl Stair Treads and Landings
"C"
Carpet or Rug
"CD"
Clothes Dryer
"CW"
Clothes Washer
"DSD"
Double Stacked Clothes Dryer
"E"
Elevator
"EG"
Entry Floor Grate
"EM"
Entry Mat
"FSS"
Floor Service Sink
"H"
High-Pressure Laminate Wood Flooring
"L"
Linoleum
"LS"
Laundry Sink
"MS"
Mud Sink
"MT"
Metal Stair Treads
"P"
Wood Parquet Dance Floor
"Q"
Quarry Tile
"R"
Raised Access Floor System
"RT"
Textured Rubber Tile
"S"
Seamless Vinyl Flooring
"T"
Vinyl Tile
"T/C"
Vinyl Tile with an Area Rug
"T/P"
Vinyl Tile with Wood Parquet Dance Floor
"U"
Bamboo Strip Flooring
"V"
Seamless Epoxy Flooring
"W"
Wood Strip or Parquet Flooring
"W/C"
Wood Strip or Parquet Flooring with an Area Rug
"X"
Plain Concrete
"X/C"
Plain Concrete with an Area Rug
"Y"
Terrazzo
"Y/C"
Terrazzo with an Area Rug
"Z"
Ceramic or Porcelain Tile

2.2 Location and Gender of Rest Rooms:

"MRR"
Men's Rest Room
"WRR"
Women's Rest Room
"URR"
Unisex Rest Room
"CRR"
Children's Rest Room

2.3 Number of Bathroom Fixtures in the Following Format:

"Number of Lavatories (Including Dispensers, Mirrors, and Shelves)/ Number of Toilets/Number of Urinals/Number of Showers or Bathtubs"

Example: 8 Lavatories, 6 Toilets, 3 Urinals, and 1 Shower would be "8/6/3/1"

2.4 Location of Drinking Fountains: Marked with a "DF".

2.5 Location of Janitors Closets: Marked with a "JC".

2.6 Location of Service Sinks: Marked with a "SS".

2.7 Location of Elevators: Marked with an "E".

File details come from the government source that posted it. Updated .