AT 12A Combi Site Vist nfo plus Q A.pdf

PDF 466 KB Posted

Attached to
Fort Riley Custodial Services: Federal contract opportunity
Solicitation number
W911RX20R0003
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

View the file

Other files for this federal contract opportunity

Other files attached to Fort Riley Custodial Services:, newest first.
File Type Posted
Amendment 4.pdf PDF
AT 12 B Final Questions and answers.pdf PDF
AT 13 Sample Work Schedule.pdf PDF
AT 7 BS 20-24 Custodial Service (8-17-2020).xlsx XLSX spreadsheet
Amendment 3.pdf PDF
AT 7 updated_BS 20-24 Custod Serv (8-7-2020).xlsx XLSX spreadsheet
Questions from Site Visit (PW Reviewed).docx DOCX document
TE 7 - Job Orders (6-24-2020).xlsx XLSX spreadsheet
Amendment _02.pdf PDF
AT 7_BS 20-24 Custodial Service (8-3-2020).xlsx XLSX spreadsheet
TE7_Ch 1 - Job Orders (2020-06-24).pdf PDF
Amendment_01.pdf PDF
AT 9 USA001557-20-DPC.PDF PDF
AT 11_Site Visit W911RX-20-R-0003.docx DOCX document
AT 7_Ch1 BS 20-24 Custodial(6-24-2020).xlsx XLSX spreadsheet
TE 7 - Job Orders (6-24-2020).docx DOCX document
TE 1 - Location Maps.docx DOCX document
AT_2 Wage Determination.pdf PDF
TE 6 - Floor Plan Drawings.docx DOCX document
00003.xlsx XLSX spreadsheet
AT 6 - PRS 2020-07-07.docx DOCX document
AT 5 - Deliverables 2020-07-07.docx DOCX document
AT 7 BS 20-24 Custodial Service (6-11-2020).xlsx XLSX spreadsheet
0003fp(1jun19).pdf PDF
TE 7 - Job Orders (6-11-2020).docx DOCX document
AT 3 - Samples of RRF.DOCX DOCX document
SF 1449 Solicitation.pdf PDF
AT 4 - CLS.PDF PDF
AT 1 Performance Work Statement.docx DOCX document
AT 8 Past Perf Questionaire.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit Briefing/Q&A

W911RX-20-R-0003

Custodial Services 3 August 2020 10:00AM CST

Fort Riley Kansas 66442

The Custodial Site Visit Q&A was conducted on 3 August 2020 at 10:00 AM CST. The following administrative information, questions and answers were provided to the attendees.

A. Attendees

1. There were a total of 12 vendors in attendance during the meeting that were represented by personnel at different levels of their firms.

2. The government was represented by Mission and Installation Contracting Command

Contracting Officer and Specialist as well as the requiring activity representatives from Fort

Riley Public Works Engineering Division.

B. Relevant Administrative Information

1. The original SF form 1149 and all subsequent amendments require completion and signatures to be considered:

a. SF 1449 requires completion of blocks 30 A, B, and C.

b. All SF 30 Amendments requires completion of blocks 15 A, B, and C.

2. Contract to person visits can be accomplished between 3 August and 12 August 2020.

Discussed that this is by appointment only, and contractors should contact selvena.b.carter.civ@mail.mil.

a. Explained that the in person visit does not include the activity moving around to different buildings on Fort Riley.

b. In person visit would entail reviewing certain documents such as maps, drawings, job orders, and to review Exhibit 7.

3. Advised contractor to pay attention to section L & M of the solicitation. Explained page limits and coefficients.

4. Outlined that it is the contractor’s responsibility to get the solicitations in on time. Advised contractors to send a test page and to receive acknowledgment from selvena.b.carter.civ@mail.mil. Advised contractors no one is at the office BLDG 1792 12th

Street to receive any mail so please use email only! due to COVID-19.

a. Reiterated section L&M is critical for solicitation proposal.

b. Discuss requirement for contractors to meet the terms and conditions of the solicitation as outlined in L&M to be considered responsible.

C. Bid Schedule

1. Discussed of the three CLINS associated with the pricing sheet or bid schedule.

2. Explained that this is a Firm Fixed Price (FFP) Requirements mailto:selvena.b.carter.civ@mail.mil mailto:selvena.b.carter.civ@mail.mil

3. Discuss that contract manpower reporting is being revamped at the moment however the

CLIN still remains.

4. Activity explained costs associated with prepriced custodial service task unit prices in bid schedule paragraphs 2.1.1, 2.1.2, and 2.1.3 and how the custodial service task unit prices were used to generate the building prices per month in Technical Exhibit 7.

D. Coefficients clarification

1. Explained how the coefficient relates to custodial service task unit prices and building prices per month. The coefficient shall be represented "net" (e.g., 1.0), a "decrease from" (e.g., 0.95), or an "increase to" (e.g., 1.05).

2. When a contractor proposes a coefficient that is less than 1.0 they make it much more difficult for them to accomplish the task under this contract. They are saying that they can do the work for less than what the government deems necessary and could cause you to fail.

Explained that the contractors should pay attention to all the things that should be included in your coefficient in your price. Please refer to bid schedule paragraph 4.

E. Questions.

1. Regarding the prices contained in Technical Exhibit 7, are they historical government estimate or current?

a. No, the building prices per month are not historical. The building prices per month were generated using the custodial service task unit prices which developed as described in bid schedule paragraph 1.

b. The building prices per month shown are based on a coefficient of 1.0.

c. The price for a particular building, for example building 3 is $212.85. If that cost is multiplied that by 12 (months), that is the total contract period price for that building.

d. Further explained that since the building prices per month were generated using a coefficient of 1.0, if the contractor decided his coefficient was going to be 1.05, then you would multiply the $212.85 by 1.05 and that would generate the price that the contractor would be paid for that building per month or $223.50.

e. On the other hand if the contractor feels that, he can do it for less and your coefficient is

0.95, then you would multiply the building price $212.85 by 0.95 and that would make it less than $212.85 or $202.21.

2. Does the current prices that are included on the pricing sheet takes into account the current COVID-19 environment or not?

a. No, the only COVID-19 consideration in this contract is the personal protective equipment that your employees are required to wear, i.e face masks.

b. The government doesn’t intend do any type of special cleaning for COVID-19 under this contract, i.e hydrostatic disinfectant spraying or deep cleaning.

c. Follow up question: Do you see us having to provide COVID-19 cleaning in the future? Answer is no, if there is COVID-19 contamination in a building going forward we would either request quotes from a different contractor, or we may offer the work to the current contract and ask them to provide a proposal to clean that building separately, and we would pay for the cleaning using a credit card.

1) Note 1: a reiteration that a coefficient of less than 1.0 will almost be considered a failure and that the contractors need to be careful when submitting their quotes was provided by the contracting officer. If the contractor look in Technical Exhibit 7, it can be seen the where and how the coefficient is applied to be able to come up with the price.

2) Note 2. PW provided clarification that on the pricing sheet, when the contractor enters the coefficient, it does not have to be the same for each contract period. It can be different coefficient for each option year.

3. Should the coefficient change based on the level of effort for cleaning each building?

No, the coefficient does not change based on the building cleaned regardless of the level of effort for each building being cleaned. The single coefficient bid for each contract period is applied to custodial service task unit prices for as ordered items and building prices per month.

4. Where is the masters summary?

a. I’m not sure what you are referring to. Technical Exhibit 7 provides a summary of quantities of the 39 cleaning tasks, a summary of the monthly price, contract period price, estimated monthly man-hours, and total square feet to be cleaned for each building. The individual job orders provide the custodial service tasks, the quantities for the tasks, and frequencies of service for all 120 buildings.

b. We will make take Technical Exhibit 7 available in MS Excel .xlsx format when we send out the amendment so you can use the data to help you prepare your proposals.

c. This is a requirements contract, which means not all the buildings shown in Technical

Exhibit will be ordered each month. Buildings may be added, deleted, suspended, and/or changed month to month. Generally speaking, the buildings and their associated prices remain the same month to month.

d. Please do not manipulate the information that we have in the bid schedule to assist yourself.

e. Clarified that the building price per month shown for each building is based on the current status of each building. A list of buildings to be cleaned is sent out each month for the following month. You will receive the list of buildings each month, and if there is any change for the buildings, the price for the buildings will be adjusted based on the change.

1) Note 1. The floor plan drawing for that building will change as well. The building prices per month listed in Technical Exhibit 7 may change each month, however, you should also know that there will be some months where there will be no changes. The building changes are minor. This month there be may be a change in one building, next month there may be no changes, and next month there may be a change in two buildings.

2) Note 2. Example of reasons for changes in buildings include:

i. Changes in square feet to be cleaned.

ii. Changes in the quantity or type of floor surfaces.

iii. Changes in the quantity or type of plumbing fixtures.

5. Please clarify if this is a FFP contract as an IDIQ type.

a. Answer yes.

b. Indefinite because, on CLIN 0001, for example, the price may vary due to the job order that month.

c. Explained the importance of CLIN 0002.

1) Required to have a Quality Control Manager, and at a minimum of one Quality Control (QC).

2) Price will be a constant each month. For example, if we only were to order two buildings for the month then CLIN 0001 will change but CLIN 0002 will not change.

6. In your CLIN 0002 description, there are bullets that indicates what should be included in that price, it also includes in the description that Performance Bonds should be included in the price. Does this project require any type of bonds?

a. Following additional research it was determined that the Government cannot require performance and payment bonds for this type of contract.

b. All references to bid performance, and payment bonds will be deleted from the CLIN 0002 description in the amendment. No bid, performance, and payment bonds will be required.

1) Note 1. The price that is proposed for CLIN 0002 will be divided by 12 to be invoiced for each month.

2) Note 2. The contractor will not be invoicing for the entire amount for the year they will be invoicing for 1/12th of that amount.

7. Please clarify the fluctuations in the number of buildings that would be ordered each month, for example you may have a certain number of buildings one month and a reduced number of buildings the following month, is there a guarantee minimum building?

a. No, there is no minimum guarantee that the same number of buildings will be cleaned every month,

b. Activity noted fluctuation is minimal each month.

8. What causes the fluctuation in buildings?

Examples of fluctuations in the number of buildings include, new construction, building renovations, building additions, building demolition, unit deployment, and mission changes Reference: RFQ Page 36 Section L: part a. (iii).

9. Ref: (iii) other provisions and clauses required in this solicitation will not count towards the page limit identified in paragraph e., of this document. Since this is a section L-

Instructions, Conditions and Notices to Bidders requirement exactly what other provisions and clauses are required to be included in the proposal to address this reference?

We are referring to ANY clause if none apply DO NOT submit any.

10. Reference: RFQ Page 39 Section L: part e, In order to provide the detail required by the RFQ for the quality plan would the government please consider exempting the quality plan from page count?

No the Quality plan shall not be exempt from page count, however, the page limit is increased to no more than 50 pages.

11. Reference: RFQ Page 39 Section L: part e, In order to provide the detail required by the RFQ would the government please consider exempting fold outs used for charts, tables, and figures?

No, foldouts are not mandatory and shall not be used to determine responsibility of offers/quotes, however, exempting this may prevent others from providing their best proposals.

12. What is the name of the current contractor and the current contract amount?

All government spending is public information. This can be found at USAspending.gov.

13. Has the scope of work under the new solicitation remained the same, decreased or increased compared to the current solicitation contract?

The scope of work for the new solicitation is the same as the current contract.

14. Can you give us the current supply, estimated cost, including paper products and chemicals?

Information unavailable. Refer to the answer to question 16.

15. Will there be an extension for the due date of this solicitation?

Yes the due date of this solicitation is extended to 31 August 12 PM CST.

16. Please provide product descriptions and usage history for all consumable supplies such as toilet paper, hand towels, seat covers, sanitary products, hand soap, and trash can liners.

The Government (building occupants) will supply all rest room consumables for all the rest rooms serviced. Refer to PWS paragraph 7.4.9. The Contractor will provide all plastic trash receptacle liners for trash receptacles the Contractor is responsible for emptying up to and including 32-gallon trash cans. Refer to PWS paragraph 7.5.8.2.

17. Will the contractor/team be required to possess a current ISSA CIMS-GB certification or equivalent at contract’s start date and maintain certification or equivalent throughout the contract period?

NO

18. Can invoices be submitted every two weeks? As a small business, under FAR 52-

232.1(b) we can invoice twice monthly to allow for better cash flow.

This contract will be invoiced once monthly.

19. Has the square footage increased or decreased? If so, how much?

The square footage of floor area to be cleaned for the new solicitation is the same as the current contract.

20. Is the contractor supposed to fill out SF 1449 Item CLINS?

YES

21. Is this contract required to be a Union based contract? If so, will the awardee be required to join the Union?

No

22. Would you be able to clarify the key positions that must be included in this contract?

Refer to PWS paragraph 2.4.3.

23. For Quality and Satisfaction Rating in Part IV of the solicitation - Will Past

Performance Questionnaires suffice for this requirement? As it currently stands, the verbiage states that contractor must “Provide any information currently available

(letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of completed product for same or similar type contract.”

Yes.

24. We have a concern on the Standard Form 1449 Bid Schedule. Ex. CLIN 0001 quantity is twelve. and we have to multiply the quantity by the unit price which will not give us the answer for the total estimated amount. On CLIN 0002 the quantity is 12and for the option years CLINS 1002, 2002, 3002 has a quantity of 1, how do we calculate CLIN

0002 quantity for the base year? We are confused and need your assistance please.

Under amendment 3, the SF Form 1449 is corrected to reflect a QTY of 12 months for those

CLINS (reflecting the number of months in the year). Please note: The Bid Schedule/AT 7 and the SF 1449 are two separate documents.

File details come from the government source that posted it. Updated .