SECTION_01_33_00_SUBMITTALS_2018-01-16.docx

DOCX document 31 KB Posted

Attached to
FT. Riley Road Maintenance
Solicitation number
W911RX-18-B-0003
Issued by

About this file

SOW Section 01 33 00 Submittals

View the file

Other files

File Type Posted
W911RX-18-B-0003-0008_Amendment.pdf PDF
Attachment_2_Daily_Rate_of_Performance_REVISED_2018-4-4.pdf PDF
SECTION_01_45_00_QUALITY_CONTROL_Amended_9APR18.pdf PDF
W911RX-18-B-0003_Ft_Riley_Exhibit_A__Bid_form_Amended_9APR18.xlsx XLSX spreadsheet
Amendment_0006_Solicitation_W911RX18B0003.pdf PDF
W911RX-18-B-0003_Questions_for_04-06-2018_FINAL.pdf PDF
Attachment_16_Timber_Guardrail.pdf PDF
Attachment_8_KDOT_Dist_2_seed_mix.pdf PDF
Attachment_13_Airfield_Traffic_Control.pdf PDF
Attachment_9_15-PS0005R_MUDJACKING.pdf PDF
Attachment_11_Roadway_Lighting_Details_TE201.pdf PDF
Attachment_10_Std_Spec_817_Pipe_Excavation_Payment_Line.pdf PDF
SECTION_01_12_00_SPECIAL_REQUIREMENTS_REVISED_2018-3-13.pdf PDF
Attachment_15_Historic__Curb_and_Gutter_detail.pdf PDF
W911RX-18-B-0003_Ft_Riley_Exhibit_A__Bid_form_Amended_3APR18.xlsx XLSX spreadsheet
Attachment_14_Historic_Stone_Wall_Detail.pdf PDF
W911RX-18-B-0003-0005_Amendment_SF30.pdf PDF
W911RX-18-B-0003-0002,_Amendment_to_change_Contracting_Offices.pdf PDF
DBA_Wage_Rates_for_Heavy_Construction_Geary_County.pdf PDF
SECTION_31_00_00_Earthwork_REVISION_COMPLETE_2018-3-12.pdf PDF
SECTION_01_45_00_QUALITY_CONTROL_REVISION_COMPLETE_2018-3-5.pdf PDF
W911RX18B00030004_Amendment.pdf PDF
Small_Business_Subcontracting_Plan_SAMPLE.pdf PDF
SECTION_02_41_00_DEMOLITION_AND_DECONSTRUCTION_REVISIONS_COMPLETE_2018-3-07.pdf PDF
SECTION_33_01_30_16_TV_Inspection_REVISIONS_COMPLETE_2018-03-12.pdf PDF
W911RX-18-B-0003-0004_Conformed_Copy_SF_1442.pdf PDF
SECTION_01_55_26_TRAFFIC_CONTROL_AND_SAFETY_REVISIONS_COMPLETE_2018-3-12.pdf PDF
Section_01_11_00_Summary_of_Work_Amended_29MAR18.pdf PDF
SECTION_33_01_30_17_Sewer_Line_Cleaning_REVISIONS_COMPLETE_2018-03-12.pdf PDF
DBA_Wage_Rates_for_Heavy_Construction_Riley_County.pdf PDF
Solicitation_Amendment_W911RX-18-B-0003.pdf PDF
W911TRX-18-B-0003_Site_visit_questions_and_answers_Review_13_March_18.pdf PDF
Fort_Riley_Roads_Site_Visit_SIgn_In.pdf PDF
Attachment_6_KDOT_standard_sheets_613_and_613a.pdf PDF
Released_W911RX-18-B-0003__IFB_Ft_Riley_RM_12Feb_2018.pdf PDF
Kansas_State_Wage_Determination_KS180020_05_Jan_2018.pdf PDF
SECTION_02_41_00_DEMOLITION_AND_DECONSTRUCTION_Revised_2018-01-16.docx DOCX document
SECTION_01_55_26_TRAFFIC_CONTROL_AND_SAFETY_Revised_2018-01-16.docx DOCX document
Attachment_2_Daily_Rate_of_Performance_REVISED_2018-1-09.xlsx XLSX spreadsheet
SECTION_32_01_16_COLD_MILLING_OF_BITUMINOUS_PAVEMENTS.docx DOCX document
Attachment_1_Construction_Staging_Area.pdf PDF
Attachment_5_As-built_example.pdf PDF
Attachment_4_Borrow_Pits.pdf PDF
SECTION_01_57_23_TEMPORARY_STORM_WATER_POLLUTION_CONTROL.docx DOCX document
SECTION_31_00_00_Earthwork_REVISED_2017-08-28.docx DOCX document
Attachment_7_KDOT_std_spec_special_prov_15-PS0007.pdf PDF
SECTION_01_12_00_SPECIAL_REQUIREMENTS_REVISED_2018-1-16.docx DOCX document
Attachment_3_KDOT_Standard_TE_Drawings.pdf PDF
SECTION_01_45_00_QUALITY_CONTROL_Revised_2018-1-16.docx DOCX document
W911RX-18-B-0003_Ft_Riley__Exhibit_A_through_E__Bid_form_REVISED_2018-1-17.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 33 00 SUBMITTALS

PART 1 GENERAL

1.1 SCOPE: This section and KDOT Part V along with the KDOT Standard Specifications provide a summary of submittals that are required in various sections of the specifications, and is provided for the convenience of the Contractor and the Government in the administration of the Contract. Any omission of a submittal in this summary, but required elsewhere in the specifications, shall not relieve the Contractor of the responsibility of furnishing the requested submittal.

1.2 DEFINITION: The term "submittal" includes, but is not limited to catalog cuts and samples; certificates of compliance; certified lists of major equipment and materials; installation, application, and finishing instructions; keying schedules; manufacturer's descriptive literature; operation and maintenance instructions; repair parts lists; shop drawings; test reports and results; batch and weigh tickets; applications for authorizations or permits; and other related information to be furnished by the Contractor to describe, in detail, specific portions of the work and materials required by the plans and specifications.

1.2.1 Certified Lists of Materials: The Contractor shall submit a certified list of materials in accordance with the Fort Riley and KDOT Standard Specifications. See KDOT Part V along with the KDOT Standard Specifications for further information.

1.2.2 KDOT Pre-Qualified Materials List (PQL): Materials referenced within the KDOT specifications that are contained within the PQL shall be identified and referenced by the Contractor on the ENG 4025 form. All other materials shall comply with this specification for review and approval. The PQL may be found at: http://www.ksdot.org/bureaus/burMatrRes/PQL/default.asp ENG Form 4025-R can be found at: http://www.publications.usace.army.mil/USACE-Publications/Engineer-Forms/

1.2.3 Installation Instructions: Manufacturer's written installation, application and finishing instructions that are required in various sections of the specifications, includes all installation, application and finishing instructions, recommendations, suggestions, and guidance, whether published separately, noted on the manufacturer's shop drawings, or printed on the product or its packaging.

1.2.4 Samples: Samples of materials proposed for use in the project shall be furnished to the Contracting Officer, if requested.

1.2.5 Test Reports: Test reports, or other technical analyses proving that materials proposed for use in the project conform to the requirements specified, shall be furnished to the Contracting Officer, if requested. See KDOT Part V along with the Standard Specifications.

1.2.6 Applications for DA Radiation Authorizations or Permits: The Contractor or their testing laboratory shall not operate nuclear density testing equipment without obtaining a Radiation Permit from the Fort Riley Radiation Protection Officer at 785-239-0517. The Contractor shall prepare and submit DA Form 3337, Application for Department of the Army Radiation Authorization or Permit, 60 days before use of nuclear density testing equipment. Form can be found at: http://www.apd.army.mil/ProductMaps/PubForm/DAForm.aspx

1.2.7 Obtain KDHE Authorization under Construction Storm water General Permit: Earthwork projects that disturb more than one acre of land shall obtain authorization from the Kansas Department of Health and Environment to discharge construction storm water runoff under the State’s general permit. The Contractor shall submit a complete application package to KDHE including completed forms, site map with contours and erosion control measures, erosion control report, etc. KDHE will invoice the Contractor annually for the permit fee. Once construction is completed and final stabilization is achieved, a Notice of Termination shall be submitted to KDHE to terminate the permit coverage and annual fee. The Contractor shall submit all construction storm water permit information to the Contracting Officer for the Government records. The KDHE website is located at this address: http://www.kdheks.gov/stormwater/#construct

1.2.8 Construction Schedules: The Contractor shall submit a construction schedule IAW paragraph 1.5.12 of Section 01 11 00 in four (4) printed copies. After approval by the Contracting Officer, one (1) copy shall be returned to the Contractor. Updates to the approved construction schedule shall be submitted in four (4) printed copies for review and approval on a weekly basis throughout contract performance.

1.3 GENERAL: Submittals shall be adequate, in themselves, to decide conformance with the Contract plans and specifications. Certificates of compliance submitted shall be notarized. The Contractor shall coordinate all submittals and review them for accuracy, completeness, and compliance with contract requirements, and show their approval thereon as evidence of such coordination and review. Submittals submitted to the Contracting Officer without evidence of the Contractor's approval will be returned without action for resubmission. The Contracting Officer will show their approval or disapproval of the submittals, and if not approved as submitted, show their reasons for disapproval. No material for which a submittal is required shall be incorporated into the work without prior approval of the submittal. Any materials incorporated into the work or purchased before approval of submittals shall be at the Contractor's own risk. Approval by the Contracting Officer will not relieve the Contractor from responsibility for any errors or omissions in shop drawings, or from responsibility for complying with the requirements of this Contract, except with respect to variations described and approved according to the following paragraph.

1.4 VARIATIONS: If submittals show variations from the Contract requirements, the Contractor shall describe the variations in writing, separate from the basic submittal document, at the time of submission.

1.5 DEVIATIONS: Contractor is not authorized to deviate from the approved specifications or approved materials without authorization from the Contracting Officer. Contractor’s failure to obtain authorization prior to commencing work may result in re-performance of work at contractor’s own expense or deduction in payment.

PART 2 PRODUCTS (not used)

PART 3 EXECUTION

3.1 SUBMITTAL SUBMISSION:

3.1.1 Where to Submit: Submission of submittals shall be to the Contracting Officer, Mission and Installation Contracting Command, Building 1792, Fort Riley, Kansas 66442-0248.

3.1.2 When to Submit: All submittals for a project shall be submitted at the same time, whenever possible. Submittals shall be submitted a minimum of 15 business days prior to commencement of work on an individual task order. No work shall commence on an individual task order until all submittals are approved. The Government will process the initial submittal within 10 business days after receipt from the Contractor.

3.1.3 What to Submit: The Contractor shall submit for approval one (1) electronic copy of all submittals, permits, and applications for radiation authorization DA Form 3337. The Contracting Officer will sign and return the accompanying ENG Form 4025-R to the Contractor. The Contractor shall submit one (1) physical material sample as required by the Contract, KDOT Standard Specifications, or Part V to the Contracting Officer unless stated otherwise:

http://www.publications.usace.army.mil/USACE-Publications/Engineer-Forms/

3.2 SUBMITTAL SUMMARY: Along with KDOT Std. Spec. and Part V submittal requirements, some submittals required by various Fort Riley sections of the are summarized as follows:

Referenced Section and Description of Submittal Section 01 11 00, Asphalt Equipment Backup Plan.

Section 01 45 00, Contractor Quality Control Plan.

Section 01 55 26, List of Materials. Traffic Control Plan

Section 01 57 23, List of Materials & Construction Storm water Permit.

Section 02 41 00, Receipts & DD Form 1348-1A.

Section 31 00 00, Test Results & Application for DA Radiation Authorization or Permit.

Section 32 31 13, List of Materials & Application Instructions.

File details come from the government source that posted it.