Attachment_9_15-PS0005R_MUDJACKING.pdf

PDF 51 KB Posted

Attached to
FT. Riley Road Maintenance
Solicitation number
W911RX-18-B-0003
Issued by

About this file

Attachment 9

View the file

Other files

File Type Posted
W911RX-18-B-0003-0008_Amendment.pdf PDF
W911RX-18-B-0003_Ft_Riley_Exhibit_A__Bid_form_Amended_9APR18.xlsx XLSX spreadsheet
Amendment_0006_Solicitation_W911RX18B0003.pdf PDF
Attachment_2_Daily_Rate_of_Performance_REVISED_2018-4-4.pdf PDF
W911RX-18-B-0003_Questions_for_04-06-2018_FINAL.pdf PDF
SECTION_01_12_00_SPECIAL_REQUIREMENTS_REVISED_2018-3-13.pdf PDF
Attachment_15_Historic__Curb_and_Gutter_detail.pdf PDF
W911RX-18-B-0003_Ft_Riley_Exhibit_A__Bid_form_Amended_3APR18.xlsx XLSX spreadsheet
Attachment_14_Historic_Stone_Wall_Detail.pdf PDF
W911RX-18-B-0003-0005_Amendment_SF30.pdf PDF
Attachment_3_KDOT_Standard_TE_Drawings_2018-4-03.pdf PDF
Attachment_12_Approved_Airfield_Patch_Materials.pdf PDF
Attachment_16_Timber_Guardrail.pdf PDF
Attachment_8_KDOT_Dist_2_seed_mix.pdf PDF
Attachment_13_Airfield_Traffic_Control.pdf PDF
Attachment_11_Roadway_Lighting_Details_TE201.pdf PDF
W911RX-18-B-0003-0002,_Amendment_to_change_Contracting_Offices.pdf PDF
SECTION_02_41_00_DEMOLITION_AND_DECONSTRUCTION_REVISIONS_COMPLETE_2018-3-07.pdf PDF
SECTION_33_01_30_16_TV_Inspection_REVISIONS_COMPLETE_2018-03-12.pdf PDF
W911RX-18-B-0003-0004_Conformed_Copy_SF_1442.pdf PDF
SECTION_01_55_26_TRAFFIC_CONTROL_AND_SAFETY_REVISIONS_COMPLETE_2018-3-12.pdf PDF
Section_01_11_00_Summary_of_Work_Amended_29MAR18.pdf PDF
SECTION_01_45_00_QUALITY_CONTROL_REVISION_COMPLETE_2018-3-5.pdf PDF
W911RX18B00030004_Amendment.pdf PDF
Small_Business_Subcontracting_Plan_SAMPLE.pdf PDF
SECTION_33_01_30_17_Sewer_Line_Cleaning_REVISIONS_COMPLETE_2018-03-12.pdf PDF
DBA_Wage_Rates_for_Heavy_Construction_Riley_County.pdf PDF
DBA_Wage_Rates_for_Heavy_Construction_Geary_County.pdf PDF
Solicitation_Amendment_W911RX-18-B-0003.pdf PDF
W911TRX-18-B-0003_Site_visit_questions_and_answers_Review_13_March_18.pdf PDF
W911RX-18-B-0003-0001.pdf PDF
Fort_Riley_Roads_Site_Visit_SIgn_In.pdf PDF
Attachment_4_Borrow_Pits.pdf PDF
SECTION_01_33_00_SUBMITTALS_2018-01-16.docx DOCX document
SECTION_01_57_23_TEMPORARY_STORM_WATER_POLLUTION_CONTROL.docx DOCX document
SECTION_31_00_00_Earthwork_REVISED_2017-08-28.docx DOCX document
Attachment_7_KDOT_std_spec_special_prov_15-PS0007.pdf PDF
Attachment_2_Daily_Rate_of_Performance_REVISED_2018-1-09.xlsx XLSX spreadsheet
SECTION_32_01_16_COLD_MILLING_OF_BITUMINOUS_PAVEMENTS.docx DOCX document
Attachment_1_Construction_Staging_Area.pdf PDF
Attachment_5_As-built_example.pdf PDF
SECTION_01_12_00_SPECIAL_REQUIREMENTS_REVISED_2018-1-16.docx DOCX document
Attachment_3_KDOT_Standard_TE_Drawings.pdf PDF
SECTION_01_45_00_QUALITY_CONTROL_Revised_2018-1-16.docx DOCX document
W911RX-18-B-0003_Ft_Riley__Exhibit_A_through_E__Bid_form_REVISED_2018-1-17.xlsx XLSX spreadsheet
SECTION_32_31_13_CHAIN_LINK_SECURITY_FENCE.docx DOCX document
Attachment_6_KDOT_standard_sheets_613_and_613a.pdf PDF
Released_W911RX-18-B-0003__IFB_Ft_Riley_RM_12Feb_2018.pdf PDF
Kansas_State_Wage_Determination_KS180020_05_Jan_2018.pdf PDF
SECTION_02_41_00_DEMOLITION_AND_DECONSTRUCTION_Revised_2018-01-16.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15-PS0005

Sheet 1 of 4

800/1700

KANSAS DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISION TO THE

STANDARD SPECIFICATIONS, EDITION 2015

Add a new SECTION to DIVISION 800.

PCCP MUDJACKING

1.0 DESCRIPTION

Raise and support the existing portland cement concrete pavement (PCCP) by drilling injection holes and pumping a grout or polyurethane material under the pavement slab as shown in the Contract Documents.

BID ITEMS UNITS

Cement (Mudjacking) Ton Fly Ash (Mudjacking) Ton Polyurethane (Mudjacking) Lbs

2.0 MATERIALS

a. Grout. Provide materials that comply with the applicable requirements.

Water ..................................................................................................................... DIVISION 2400 Portland Cement (Type I or II) .............................................................................. DIVISION 2000 Fly Ash .................................................................................................................. DIVISION 2000 Admixtures ............................................................................................................ DIVISION 1400 Non-Expansive Cementitious Grout ...................................................................... DIVISION 1700 Polyurethane .......................................................................................................... DIVISION 1700 (this specification)

Mix the water, portland cement (not less than 25% by volume of solids) and fly ash (75% by volume of solids) into a cement/fly ash grout complying with TABLE 1:

TABLE 1: GROUT FOR MUDJACKING

Property Test Method Value

Fluidity (efflux time) ASTM C939 16 to 36 seconds 7-Day Compressive Strength ASTM C942 600 psi minimum

Submit to the Engineer the results of tests conducted on the design mix by a certified testing laboratory.

Provide test results for 1, 3, and 7 day strengths, fluidity, time of initial set (ASTM C 266), and shrinkage and expansion observed (ASTM C 940).

Use admixtures only with written approval from the Engineer.

The Engineer will accept the fly ash grout on the results of the compressive strength and visual inspection of the mixture placed on the project.

3.0 CONSTRUCTION REQUIREMENTS

a. Polyurethane Contractor Approval. The Polyurethane Contractor must be regularly engaged in work similar to this project in difficulty and/or scope, and document that the company has performed a minimum of the following work in the United States:

• Provided all supervision, labor, material, and equipment necessary to successfully complete 10 separate projects.

• Provide contact names and their telephone numbers as part of this submittal.

scott.r.sutherland Line scott.r.sutherland Typewritten Text Revised 3-9-2018 scott.r.sutherland Typewritten Text

15-PS0005R

Sheet 2 of 4

800/1700

• Provide New York Department of Transportation Hydro-Insensitivity of High Density Polyurethane

Grout Panel Test (GTP-9) results.

Submit the Polyurethane Contractor’s qualifications to the Geotechnical Unit in the Bureau of Structures and Geotechnical Services for approval. The Geotechnical Unit will approve or deny the Polyurethane Contractor’s qualifications.

b. Weather and Seasonal Limitations. Do not mudjack the PCCP if the pavement surface temperatures are below 35°F, if the subgrade or base course is frozen, or if the subgrade is saturated from recent rainfall, as evidenced by standing water on the pavement or in the joints or cracks.

Mudjacking operations may start when the pavement surface temperature is above 35ºF, the ambient air temperature is 35ºF and rising and is expected to exceed 40ºF. Discontinue paving when the ambient air temperature falls below 40ºF. Do not place when it is raining or snowing.

c. Drilling Holes. Submit a hole pattern and pumping sequence to the Engineer. Do not damage the existing reinforcing steel in the pavement. Before drilling the holes, determine the location of reinforcing steel.

Drill holes vertically and round to the maximum diameter shown TABLE 2. Drill to a depth sufficient to penetrate the base and into the subgrade material. Holes may be washed to create a small cavity, allowing initial spread of material. Drill the holes in a manner preventing breakout at the bottom of the pavement. Do not put downward force on the drill that exceeds 200 lbf.

TABLE 2: DRILL HOLE DIAMETER

Type of Work Maximum Diameter

Fly Ash 1 to 1½ inches Polyurethane 5/8 inches

d. Pavement Mudjacking.

(1) General. Use a string line or monitoring equipment to create a smooth profile. Raise PCCP by injecting grout or polyurethane material within ± ¼ inch of adjacent unjacked PCCP as shown in the Contract Documents.

Replace all slabs raised more than ½ inch greater than adjacent PCCP. Grind all slabs raised more than ¼ inch and less than ½ inch. Grade tolerances are applicable to both transverse and longitudinal grades.

Begin the injection as soon as practicable after mixing the material. Do not use material held in the mixer or injection sump pump for more than 1 hour after mixing. Do not add water to the material after the initial mixing.

Inject the mudjacking material in the submitted pattern sequence, and in the quantity required to fill voids under the PCCP.

Cease injection when material appears at any joint, crack or adjacent hole, or when monitoring devices indicate slab movement.

Prevent grout or polyurethane material from being injected into any drainage facility or other open structure.

Prevent excessive loss of material through cracks, joints, other drilled holes or back pressure. KDOT will not pay for wasted material.

Replace slabs in which cracks emanate radially from the injection holes and in slabs where cracks develop between adjacent injection holes at no additional cost to KDOT. The Engineer may approve tie bar insertion (cross-stitching) of the cracks if the cracking is minor. Perform tie bar insertion according to 15-08003, latest revision at no additional cost to KDOT.

(2) Grout. Connect an expanding rubber packer, or other approved device, to the end of the grout plant discharge hose. Place the expanding rubber packer in the injection hole, being careful not to extend the discharge end of the rubber packer below the lower surface of the PCCP.

Produce grout slurry to a 12 second flow cone time. Pump the grout into the holes using an injection pump with a pressure capability of 250 to 300 psi when pumping grout slurry mixed to a 12 second flow cone time.

Cease injection at a hole when grout flow does not occur after 7 seconds of sustained 150 psi gauge pressure, and there is no indication of slab movement.

Prior to grout drying on the drilled holes, fill the holes with a fast setting sand/cement mixture or other patching material approved by the Engineer scott.r.sutherland Rectangle scott.r.sutherland Line scott.r.sutherland Typewritten Text Revision 3-9-2018 scott.r.sutherland

Sheet 3 of 4

800/1700

(3) Polyurethane. Submit a plan to verify the amount of material being injected, equipment, test methods, and procedures.

Demonstrate to the Engineer, using established industry practices, that the material is hydro-insensitive.

During the first day’s production, perform a product density test by injecting the polyurethane into a known volume cylinder (6-inch x 12-inch) or other suitable container. The density shall be in accordance with DIVISION 1700 this specification. Provide a ½ pint sample for each component. The Engineer will submit samples to Materials and Research Center for testing.

Pump the polyurethane into the holes using an injection pump with volumetric controls and pressure appropriate for the material. Equip the pumping unit with means to measure the material usage. Inject the polyurethane material according to the manufactures recommendations.

Remove excess polyurethane from the injection holes and fill the holes with a non-expansive cementitious grout or material approved by the Engineer

4.0 MEASUREMENT AND PAYMENT

The Engineer will measure cement and fly ash mudjacking by the ton and polyurethane mudjacking by the pound.

Monitoring for pavement lift and injection holes are subsidiary to the bid items mudjacking.

Payment for "Cement (Mudjacking)", "Fly Ash (Mudjacking)" and "Polyurethane (Mudjacking)" at the contract unit prices is full compensation for the specified work. No adjustment in contract unit prices will be made regardless of the amount of underruns or overruns.

scott.r.sutherland Line scott.r.sutherland

Sheet 4 of 4

800/1700 Add a new SECTION in DIVISION 1700.

POLYURETHANE

1.0 DESCRIPTION

This specification covers polyurethane material used for mudjacking.

2.0 REQUIREMENTS

a. Provide a high density, closed cell, hydro-insensitive polyurethane material complies with the following:

TABLE 1: POLYURETHANE PROPERTIES

Property Test Method Requirement

Compressive Strength (min) ASTM D 1621 45 psi Tensile Strength (min) ASTM D 1623 80 psi Elongation (max.) ASTM D 1623 5% Density (min) ASTM D 1622 4.0+/-0.5 pcf

3.0 TEST METHODS

Test as specified in subsection 2.0.

4.0 PREQUALIFICATION

a. Manufacturers interested in prequalifying material under subsection 2.0a. must submit the following to the Bureau of Construction and Materials:

(1) A complete description, literature, and set of instructions and recommendations,

(2) A copy of test results performed in accordance with the tests stated in subsection 2.0a.,

(3) Certificate stating results comply with subsection 2.0a., and

(4) Material Safety Data Sheets (MSDS).

(5) Submit New York Department of Transportation Hydro-Insensitivity of High Density Polyurethane

Grout Panel Test (GTP-9) results.

b. The Bureau of Construction and Materials will maintain a list of qualified materials. Products will remain on the list as long as field performance is satisfactory.

5.0 BASIS OF ACCEPTANCE

a. Prequalification as specified in subsection 4.0.

b. Receipt and approval of a Type D certification as specified in DIVISION 2600.

c. Visual inspection by the Field Engineer.

07-01-15 C&M scott.r.sutherland Line scott.r.sutherland Rectangle scott.r.sutherland Typewritten Text Revision 3-9-2018 scott.r.sutherland

PCCP MUDJACKING