Attachment_11_Roadway_Lighting_Details_TE201.pdf

PDF 328 KB Posted

Attached to
FT. Riley Road Maintenance
Solicitation number
W911RX-18-B-0003
Issued by

About this file

Attachment 11

View the file

Other files

File Type Posted
W911RX-18-B-0003-0008_Amendment.pdf PDF
Attachment_2_Daily_Rate_of_Performance_REVISED_2018-4-4.pdf PDF
Amendment_0006_Solicitation_W911RX18B0003.pdf PDF
W911RX-18-B-0003_Ft_Riley_Exhibit_A__Bid_form_Amended_9APR18.xlsx XLSX spreadsheet
SECTION_01_45_00_QUALITY_CONTROL_Amended_9APR18.pdf PDF
W911RX-18-B-0003_Questions_for_04-06-2018_FINAL.pdf PDF
Attachment_8_KDOT_Dist_2_seed_mix.pdf PDF
Attachment_16_Timber_Guardrail.pdf PDF
Attachment_13_Airfield_Traffic_Control.pdf PDF
Attachment_15_Historic__Curb_and_Gutter_detail.pdf PDF
W911RX-18-B-0003_Ft_Riley_Exhibit_A__Bid_form_Amended_3APR18.xlsx XLSX spreadsheet
Attachment_9_15-PS0005R_MUDJACKING.pdf PDF
Attachment_14_Historic_Stone_Wall_Detail.pdf PDF
W911RX-18-B-0003-0005_Amendment_SF30.pdf PDF
Attachment_10_Std_Spec_817_Pipe_Excavation_Payment_Line.pdf PDF
Attachment_12_Approved_Airfield_Patch_Materials.pdf PDF
Attachment_3_KDOT_Standard_TE_Drawings_2018-4-03.pdf PDF
SECTION_01_12_00_SPECIAL_REQUIREMENTS_REVISED_2018-3-13.pdf PDF
W911RX-18-B-0003-0002,_Amendment_to_change_Contracting_Offices.pdf PDF
SECTION_01_55_26_TRAFFIC_CONTROL_AND_SAFETY_REVISIONS_COMPLETE_2018-3-12.pdf PDF
Section_01_11_00_Summary_of_Work_Amended_29MAR18.pdf PDF
SECTION_33_01_30_17_Sewer_Line_Cleaning_REVISIONS_COMPLETE_2018-03-12.pdf PDF
SECTION_02_41_00_DEMOLITION_AND_DECONSTRUCTION_REVISIONS_COMPLETE_2018-3-07.pdf PDF
DBA_Wage_Rates_for_Heavy_Construction_Riley_County.pdf PDF
DBA_Wage_Rates_for_Heavy_Construction_Geary_County.pdf PDF
SECTION_31_00_00_Earthwork_REVISION_COMPLETE_2018-3-12.pdf PDF
SECTION_33_01_30_16_TV_Inspection_REVISIONS_COMPLETE_2018-03-12.pdf PDF
W911RX-18-B-0003-0004_Conformed_Copy_SF_1442.pdf PDF
SECTION_01_45_00_QUALITY_CONTROL_REVISION_COMPLETE_2018-3-5.pdf PDF
W911RX18B00030004_Amendment.pdf PDF
Small_Business_Subcontracting_Plan_SAMPLE.pdf PDF
Solicitation_Amendment_W911RX-18-B-0003.pdf PDF
W911TRX-18-B-0003_Site_visit_questions_and_answers_Review_13_March_18.pdf PDF
W911RX-18-B-0003-0001.pdf PDF
Fort_Riley_Roads_Site_Visit_SIgn_In.pdf PDF
Attachment_7_KDOT_std_spec_special_prov_15-PS0007.pdf PDF
Attachment_5_As-built_example.pdf PDF
SECTION_32_31_13_CHAIN_LINK_SECURITY_FENCE.docx DOCX document
Attachment_6_KDOT_standard_sheets_613_and_613a.pdf PDF
Attachment_4_Borrow_Pits.pdf PDF
SECTION_01_12_00_SPECIAL_REQUIREMENTS_REVISED_2018-1-16.docx DOCX document
Released_W911RX-18-B-0003__IFB_Ft_Riley_RM_12Feb_2018.pdf PDF
Kansas_State_Wage_Determination_KS180020_05_Jan_2018.pdf PDF
SECTION_01_33_00_SUBMITTALS_2018-01-16.docx DOCX document
SECTION_02_41_00_DEMOLITION_AND_DECONSTRUCTION_Revised_2018-01-16.docx DOCX document
SECTION_01_57_23_TEMPORARY_STORM_WATER_POLLUTION_CONTROL.docx DOCX document
SECTION_31_00_00_Earthwork_REVISED_2017-08-28.docx DOCX document
SECTION_01_45_00_QUALITY_CONTROL_Revised_2018-1-16.docx DOCX document
Attachment_3_KDOT_Standard_TE_Drawings.pdf PDF
SECTION_01_55_26_TRAFFIC_CONTROL_AND_SAFETY_Revised_2018-01-16.docx DOCX document
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUNDATION DETAIL

FRANGIBLE BASE

FLAT WASHERS

HANDHOLE

24" RADIUS

PVC CONDUIT BEND

3"-90 DEGREE SCHEDULE 40

FOR TOP OF FRANGIBLE BASE

RUBBER SEALANT IS REQUIRED

TOP VIEW FOUNDATION

24"

IN FRANGIBLE BASE

ALL SPLICES TO BE MADE

24" X 24" AT TOP OF BASE

A MIN. OF 6" TO BE FORMED

SCREW-IN BASE

#10 AWG CABLES

MESH GRIP

LUMINAIRE ARM

SUPPORT GRIP

HOOK FOR CABLE

ABOVE.

WITHIN THE LIGHT POLE AS SHOWN

INSTALLED ON THE HOOK SUPPLIED

THE CABLE SUPPORT GRIP SHALL BE

NOTE:

CABLE SUPPORT GRIP

PLATE REQUIRED

18" ABOVE BASE

4" X 6" HANDHOLE

FRANGIBLE BASE

FOUNDATION

CABLE SUPPORT GRIP

HOOK PROVIDED FOR

M I N X .5

F

O R

M

T G

H T A

L U

M I N

U M

X .3

X

F

O R

M T

G

H T S

T E

E L

M O

U N

T I N

G H

E I G

H T T

O L I G

H T C

E N

T E

R

M I N

A B

O V

E G

R A

D E

PLAN SHEET

AS DESIGNATED ON

STUB OF BREAKAWAY SUPPORT

CENTERLINE FOOTING

4" MAX.

ANCHOR BOLTS.

SUPPORT STUB CLEARANCE OF 4" MAXIMUM, TO INCLUDE

THE FOUNDATION SHALL BE INSTALLED TO MEET THE BREAKAWAY

NOTE:

STUB CLEARANCE DIAGRAM

BREAKAWAY SUPPORT

REBAR DETAIL

GALVANIZED

20" DIA.

1"

4" 10"

4"

I N F

O U

N D

A T I O

N B

A S

E

FRANGIBLE BASE

#4 REBAR

OR WIRE

SPOT WELD

M

I N

DETAIL

ANCHOR BOLT

TOP AND BOTTOM VIEW

SIDE VIEW

M A

X

AND TRAFFIC SIGNALS (NO. 12.5.3).

FOR STRUCTURAL SUPPORTS FOR HIGHWAY SIGNS, LUMINAIRES

IN THE LATEST EDITION OF AASHTO STANDARD SPECIFICATIONS

THE 4" MAX. IS A REQUIREMENT OF THE BREAKAWAY CRITERIA

LIGHTING SYSTEM.

VERTICAL ALIGNMENT UPON COMPLETION OF THE

BE PERMITTED. THEY SHALL BE RAKED TO PROVIDE A

IS ESSENTIAL AND NO PERCEPTIBLE TOLERANCE WILL

CAREFUL ALIGNMENT AND GRADING OF STANDARDS

CENTERS AT A MINIMUM OF 40� ABOVE GRADE. THE

ALL LUMINAIRES SHALL BE SUPPORTED WITH LIGHT

NOTE:

MEANS OF A GROUND ROD CLAMP WITH AN EXOTHERMIC CONNECTION.

WIRE SHALL BE CONNECTED TO THE COPPERCLAD GROUND ROD BY

" GROUNDING NUT. GROUND2

THE LIGHT STANDARD SHAFT WITH A 1

SOLID BARE COPPER GROUND WIRE BOLTED TO THE INSIDE OF

LIGHT STANDARDS SHALL BE GROUNDED BY MEANS OF A NO.6 AWG

GROUNDING NOTE:

SCREW-IN FOUNDATIONS SHALL NOT BE INSTALLED IN DISTRICT ONE.

MEADE, CLARK, COMANCHE, KIOWA, BARBER, HARPER, AND KINGMAN.

SAFETY & TECHNOLOGY: BOURBON, CRAWFORD, CHEROKEE, LABETTE,

DEPARTMENT OF TRANSPORTATION BUREAU OF TRANSPORTATION

USED FOR ROADWAY LIGHTING UPON APPROVAL BY THE KANSAS

COUNTIES, SCREW-IN LIGHT POLE FOUNDATIONS MAY ONLY BE

DUE TO SOIL CONDITIONS IN ALL OR PART OF THE FOLLOWING

NOTE:

Sh. No.

XXXXXX-XX XX-XXXX-XX XXXXXX

XXX

* SEE NOTE BELOW

UP TO A 15" BOTTOM BOLT CIRCLE.

THE FRANGIBLE BASE MUST ACCOMMODATE

NOTE:

D ra w n B y

F il e c o n n ie e

P lo tt e d te .d g n te

-J

A N -2

:3

T ra ff ic

1 2/4/11

2/25/11

1/12/12 B.D.G.

B.D.G.

J.F.F.

C.E.

V.H.

V.H.

REVISIONS BY APP’DDATENO.

TRACED

TRACE CK.

APP’D

QUANTITIES

QUAN. CK.

DETAILED

DETAIL CK.

FHWA APPROVAL

DESIGNED

DESIGN CK.

KANSAS

STATE PROJECT NO. YEAR

TOTAL

SHEETS

SHEET NO.

KANSAS DEPARTMENT OF TRANSPORTATION

TE201

12/15/2011

C.E.

B.D.G. B.D.G.

C.E.

Brian D. Gower

Chg’d Foundation Detail to show 1" PVC Cond

Modify Bolt Circle Note

Chg’d Bolt Circle Diameter

LIGHTING DETAILS

ROADWAY

2’

GROUND ROD

" X 10’-0"4

ON VOLTAGE DROP

GROUND IN DUCT - AWG BASED

2/C SECONDARY CABLE WITH

GROUND WIRE

1/C #6 BARE COPPER

FROM EDGE OF FOUNDATION

TO PROVIDE 2" MINIMUM CLEARANCE

REINFORCING STEEL SHALL BE INSTALLED

PVC CONDUIT BEND 24" RADIUS

1"-90 DEGREE SCHEDULE 40

ANCHOR BOLTS

4-1" X 40"

K D

O T G r a p h ic s C e r ti fi e d

KDOT Graphics Certified 01-12-2012

File details come from the government source that posted it.