SECTION_01_12_00_SPECIAL_REQUIREMENTS_REVISED_2018-1-16.docx

DOCX document 39 KB Posted

Attached to
FT. Riley Road Maintenance
Solicitation number
W911RX-18-B-0003
Issued by

About this file

SOW 01 12 00 Special Requirements

View the file

Other files

File Type Posted
W911RX-18-B-0003-0008_Amendment.pdf PDF
W911RX-18-B-0003_Ft_Riley_Exhibit_A__Bid_form_Amended_9APR18.xlsx XLSX spreadsheet
Amendment_0006_Solicitation_W911RX18B0003.pdf PDF
Attachment_2_Daily_Rate_of_Performance_REVISED_2018-4-4.pdf PDF
W911RX-18-B-0003_Questions_for_04-06-2018_FINAL.pdf PDF
SECTION_01_12_00_SPECIAL_REQUIREMENTS_REVISED_2018-3-13.pdf PDF
Attachment_15_Historic__Curb_and_Gutter_detail.pdf PDF
W911RX-18-B-0003_Ft_Riley_Exhibit_A__Bid_form_Amended_3APR18.xlsx XLSX spreadsheet
Attachment_14_Historic_Stone_Wall_Detail.pdf PDF
W911RX-18-B-0003-0005_Amendment_SF30.pdf PDF
Attachment_3_KDOT_Standard_TE_Drawings_2018-4-03.pdf PDF
Attachment_12_Approved_Airfield_Patch_Materials.pdf PDF
Attachment_16_Timber_Guardrail.pdf PDF
Attachment_8_KDOT_Dist_2_seed_mix.pdf PDF
Attachment_13_Airfield_Traffic_Control.pdf PDF
Attachment_9_15-PS0005R_MUDJACKING.pdf PDF
Attachment_11_Roadway_Lighting_Details_TE201.pdf PDF
W911RX-18-B-0003-0002,_Amendment_to_change_Contracting_Offices.pdf PDF
SECTION_02_41_00_DEMOLITION_AND_DECONSTRUCTION_REVISIONS_COMPLETE_2018-3-07.pdf PDF
SECTION_33_01_30_16_TV_Inspection_REVISIONS_COMPLETE_2018-03-12.pdf PDF
W911RX-18-B-0003-0004_Conformed_Copy_SF_1442.pdf PDF
SECTION_01_55_26_TRAFFIC_CONTROL_AND_SAFETY_REVISIONS_COMPLETE_2018-3-12.pdf PDF
Section_01_11_00_Summary_of_Work_Amended_29MAR18.pdf PDF
SECTION_01_45_00_QUALITY_CONTROL_REVISION_COMPLETE_2018-3-5.pdf PDF
W911RX18B00030004_Amendment.pdf PDF
Small_Business_Subcontracting_Plan_SAMPLE.pdf PDF
SECTION_33_01_30_17_Sewer_Line_Cleaning_REVISIONS_COMPLETE_2018-03-12.pdf PDF
DBA_Wage_Rates_for_Heavy_Construction_Riley_County.pdf PDF
DBA_Wage_Rates_for_Heavy_Construction_Geary_County.pdf PDF
Solicitation_Amendment_W911RX-18-B-0003.pdf PDF
W911TRX-18-B-0003_Site_visit_questions_and_answers_Review_13_March_18.pdf PDF
W911RX-18-B-0003-0001.pdf PDF
Fort_Riley_Roads_Site_Visit_SIgn_In.pdf PDF
Attachment_4_Borrow_Pits.pdf PDF
SECTION_01_33_00_SUBMITTALS_2018-01-16.docx DOCX document
SECTION_01_57_23_TEMPORARY_STORM_WATER_POLLUTION_CONTROL.docx DOCX document
SECTION_31_00_00_Earthwork_REVISED_2017-08-28.docx DOCX document
Attachment_7_KDOT_std_spec_special_prov_15-PS0007.pdf PDF
Attachment_2_Daily_Rate_of_Performance_REVISED_2018-1-09.xlsx XLSX spreadsheet
SECTION_32_01_16_COLD_MILLING_OF_BITUMINOUS_PAVEMENTS.docx DOCX document
Attachment_1_Construction_Staging_Area.pdf PDF
Attachment_5_As-built_example.pdf PDF
Attachment_3_KDOT_Standard_TE_Drawings.pdf PDF
SECTION_01_45_00_QUALITY_CONTROL_Revised_2018-1-16.docx DOCX document
W911RX-18-B-0003_Ft_Riley__Exhibit_A_through_E__Bid_form_REVISED_2018-1-17.xlsx XLSX spreadsheet
SECTION_32_31_13_CHAIN_LINK_SECURITY_FENCE.docx DOCX document
Attachment_6_KDOT_standard_sheets_613_and_613a.pdf PDF
Released_W911RX-18-B-0003__IFB_Ft_Riley_RM_12Feb_2018.pdf PDF
Kansas_State_Wage_Determination_KS180020_05_Jan_2018.pdf PDF
SECTION_02_41_00_DEMOLITION_AND_DECONSTRUCTION_Revised_2018-01-16.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 12 00 SPECIAL REQUIREMENTS

Part 1 GENERAL

1.1 PERMITS:

1.1.1 The Contractor shall contact Kansas One-Call at phone number 811 for utility location services. If utility services, such as communication lines and/or local utility lines are within the work area(s), it shall be the Contractor's responsibility to coordinate with them.

1.1.2 The following are known to have active utility services on Ft. Riley:

WaterFt. Riley (PW)
Sanitary SewerFt. Riley (PW)
Industrial SewerFt. Riley (PW)
Storm SewerFt. Riley (PW)
Fuel Oil & PropaneFt. Riley (PW)
SteamFt. Riley (PW)
Refrigerators, Chilled WaterFt. Riley (PW)
Diesel Fuel, GasolineFt. Riley (PW) Training Ranges Target SystemsFt. Riley (DPTM) Natural GasFt. Riley (PW),KGS
Electric PowerFt. Riley (PW), KGS
Cable TVContractor Vye 855-367-8983
Telephone, Wire & Fiber OpticsFt. Riley (NEC) 785-239-2406

1.2 STAKING:

1.2.1 The Contractor shall be responsible for the staking of privately owned utility services.

1.2.2 The Contractor shall be responsible for all construction surveying required for completion of an individual task order. Costs associated with construction staking shall be paid for under the bid item Contractor Construction Staking General or Bridge detailed in KDOT Std. Spec. 802.3c. General category shall be measured and paid for by the square yard amount of constructed concrete or asphalt paved surface including curb and gutter. Bridge category shall be paid for by the square yard amount of completed bridge surface between the two edge of wear surfaces on the bridge. Benchmark Monuments shall be paid for under KDOT Std. Spec. 802.4.

1.3 VERIFICATION OF EXISTING UTILITIES

1.3.1 The Contractor shall obtain services to verify the location and elevation of all privately, publicly or cooperatively owned lines, facilities and systems for producing, transmitting or distributing communications, power, electricity, light, heat, gas, oil, crude products, water, steam, waste, storm water, and other similar commodities, including fire and police signal systems and street lighting systems which directly or indirectly serve the public within the limits of the excavation site. The costs associated with this requirement shall be subsidiary to other bid items.

1.4 DAMAGE TO EXISTING UTILITIES:

1.4.1 The Contractor shall immediately notify the Contracting Officer's Representative and applicable utility company of any damage to existing utilities. If the damage was due to the Contractor's negligence, repairs to damaged utilities shall be made according to the applicable owner's requirements at the Contractor's expense and at no additional cost to the owner or the Government.

1.4.2 The Contractor is not considered negligent in damaging Government owned utilities if the Contractor followed the above procedure and the utility was more than three (3) feet on either side of the location shown and/or if the utility was not shown.

1.4.3 It is the Contractor's responsibility to settle any claims for damage to any non-government owned utility systems.

1.5 EXCAVATION AND UTILITY CLEARANCE COORDINATION:

1.5.1 To assist the Contractor, available as-built drawings of the existing utility systems may be obtained by the Contractor from the Public Works, Engineering Division, Project Management Branch, Building 408, Fort Riley, Kansas between the hours of 7:30 A.M. and 4:00 P.M., Monday through Friday, Federal holidays excluded.

1.5.2 The exact locations of the various underground utility systems are tentative and may be incorrect. Therefore, the Contractor shall be responsible for verifying (see paragraph 1.3 above) the exact locations of these various utility systems within 3 feet of where they have been located. The Contractor shall be held responsible for any property damage to these underground utility systems, and any resulting injury or death, if the underground utility systems are damaged or ruptured because of their actions.

1.5.3 The Contractor shall be responsible for performing excavation work without interruption of existing underground utility systems, unless otherwise indicated in the task order and specifications.

1.6 WORK REQUIREMENTS:

1.6.1 Military mission requirements, unique to a military installation and not found in the public sector, which may be unknown during development and before award of this contract; and which may arise subsequent to award of this contract, may affect the accomplishment of work during a normal 40-hour work week. Should a mission requirement occur, the Contracting Officer will adjust the rate of performance to compensate for any time lost.

1.6.2 Approval of work other than during the work hours established will be based upon technical or safety factors, and not at the convenience of the Contractor. This is not intended to restrict the Contractor if the part of the project engaged in on a certain day requires continuous work until completed because of the technical nature of it, or in the interest of safety, or to prevent damage to the project or other property. The Contractor shall give prior notice of such a requirement to the Contracting Officer’s Representative. If Saturday, Sunday or holiday work is required, the Contractor shall make their request in writing to the Contracting Officer not less than forty-eight (48) hours in advance so that arrangements may be made to provide inspection of the work if it is approved by the Government.

1.7 AIRFIELD SAFETY PRECAUTIONS:

1.7.1 The operation of all ground equipment (mobile or stationary), the placement of all materials, and the performance of all work, upon and near all airfields, shall be done according to section 1.6. Requirements of this section are in addition to any other safety requirements of this contract. Point of contact is Airfield Base Operations, 239-2530, located in Bldg. 743.

1.7.2 Contractor personnel shall be required to take a onetime 15 min class on airfield safety. Airfield Base Operations may issue a radio for usage on the Airfield. Contractor shall be held responsible for replacing any damaged or lost radios at no expense to the government.

1.7.3 For the purpose of section 1.6, the following definitions shall apply:

1.7.3.1 Landing areas means the following:

1.7.3.1.1 The “primary surfaces” comprise the surface of the runways, the runway shoulders, and the lateral safety zones. The length of the primary surface is 1,000 feet (500 feet on each side of the runway centerline); and

1.7.3.1.2 The "clear zones" beyond the ends of each runway, i.e., the extension of the "primary surface" for a distance of 200 feet beyond each end of each runway; and

1.7.3.1.3 All taxiways plus the lateral clearance zones along each side for the length of the taxiways (the outer edge of each lateral clearance zone is laterally 250 feet from the far or opposite edge of the taxiway, i.e., a 75 foot wide taxiway would have a combined width of taxiway and lateral clearance zones of 425 feet); and

1.7.3.1.4 All aircraft parking aprons, plus the area 125 feet in width extending beyond each edge all around the aprons.

1.7.4 Safety precaution area means those portions of approach-departure clearance zones and transitional zones where placement of objects incident to contract performance might result in vertical projections at or above the approach-departure clearance surface or the transitional surface.

1.7.4.1 The "approach-departure clearance surface" is an extension of the primary surface and the clear zone at each end of each runway, for a distance of 50,000 feet, first along an inclined plane (glide angle) and then along a horizontal plane, both flaring symmetrically about the runway centerline extended. The inclined plane (glide angle) begins in the clear zone 200 feet past the end of the runway (and primary surface) at the same elevation as the end of the runway, and continues upward at a slope of 50:1 (one foot vertically for each 50 feet horizontally) to an elevation of 200 feet above the established airfield elevation; continuing at a slope of 40:1 to a point 50,000 feet longitudinally from the beginning of the inclined plane (glide angle) and ending there. The width of the surface at the beginning of the inclined plane (glide angle) is the same as the width of the clear zone; thence it flares uniformly, reaching a maximum width of 16,000 feet at the end.

1.7.4.2 The "approach-departure clearance zone" is the ground area under the approach-departure clearance surface.

1.7.4.3 The "transitional surface" is a sideways extension of all primary surfaces, clear zones, and approach-departure clearance surfaces along inclined planes. The inclined plane in each case begins at the edge of the surface. Slope of the inclined plane is 7:1 (one foot vertically for each 7 feet horizontally), and it continues to the point of intersection with the inner horizontal surface (which is the horizontal plane 150 feet above the established airfield elevation) or the outer horizontal surface (which is the horizontal plane 500 feet above the established airfield elevation), whichever is applicable.

1.7.4.4 The "transitional zone" is the ground area under the transitional surface. It adjoins the primary surface, clear zone and approach-departure clearance zone.

1.7.5 The Contractor shall report to the Contracting Officer’s Representative before initiating any work and shall notify him of proposed changes of locations and operations.

1.7.6 Neither equipment nor personnel shall use any runway for purposes other than aircraft operation without permission of the Airfield Duty Officer unless the runway is closed by order of the Airfield Duty Officer and marked as provided in paragraph 1.7.7.1 below.

1.7.7 The Contractor shall place nothing upon the landing areas without authorization of the Contracting Officer’s Representative and Airfield Duty Officer.

1.7.7.1 Unless otherwise authorized by the Contracting Officer’s Representative and Airfield Duty Officer, the Contractor shall outline those landing areas hazardous to aircraft, with red flags by day, and with electric, battery-operated, low-intensity red flasher lights by night.

1.7.7.2 Before entering any landing area at an airfield where flying is controlled, additional permission shall be obtained every time from the control tower operator via radio, unless the landing area is marked as hazardous to aircraft according to paragraph 1.6.5.1 above.

1.7.7.3 All vehicles that the Contractor operates in landing areas shall be identified by means of a flag on a staff attached to and flying above the vehicle. The flag shall be three feet square and shall consist of a checkered pattern of international orange and white squares of one foot on each side (the flag may vary up to 10 percent from each of these dimensions).

1.7.7.4 Unless otherwise authorized by the Contracting Officer’s Representative (COR), all other equipment and materials in the landing areas shall be marked with red flags by day and with electric, battery-operated, low-intensity red flasher lights by night.

1.7.7.5 Work in progress shall be managed so as to leave that portion of the landing area that is available to aircraft free from hazards, holes, piles of material, and projecting shoulders that might damage an airplane tire.

1.7.8 The Contractor shall place nothing upon the safety precaution areas without authorization of the COR and the Airfield Duty Officer.

1.7.8.1 Unless otherwise authorized by the Contracting Officer’s Representative and Airfield Duty Officer, all equipment and materials in safety precaution areas shall be marked with red flags by day, and with electric, battery-operated, low-intensity red flasher lights by night.

1.7.8.2 All objects placed in safety precaution areas, which project above the approach- departure clearance surface or above the transitional surface, must be provided at night with a red light or red lantern.

1.7.9 The Contractor shall keep all paved surfaces such as runways, taxiways, and hardstands, clean and free from foreign objects of debris that might damage aircraft propellers or jet aircraft engines.

1.7.10 While work is being performed on the airfield by the Contractor, the operation of mobile equipment shall be governed by the safety provisions above. At all other times all mobile equipment shall be removed to locations approved by the Contracting Officer’s Representative at a distance of at least 750 feet from the runway centerline plus any additional distance necessary to assure compliance with other provisions of this clause.

1.7.11 Only those trenches may be opened for which material is on hand and ready for placing therein. When practicable after material has been placed, and work approved, trenches shall be backfilled and compacted as required by the contract. Meanwhile, all hazardous conditions shall be marked and lighted in accordance with the other provisions of this clause.

1.8 Existing Signs

1.8.1 Prior to beginning work on an individual task order, the Contractor shall identify all existing signs that need to be removed for construction. The Contractor shall be responsible for removing and re-installing these signs to their original location, or to a location identified by the COR. All costs for removing and re-installing signs will be considered subsidiary to other bid items. During construction, the Contractor is responsible for securing these signs and protecting them from damage. Locations of new signs shall be provided to the COR within 30 business days.

Part 2 PRODUCTS (not used)

Part 3 EXECUTION (not used)

File details come from the government source that posted it.