This document is a Contract Data Requirements List (CDRL) for Manuals associated with Solicitation W911RQ-25-R-0002 for a DC Motor Test Stand at Red River Army Depot (RRAD). The CDRL requires the contractor (Brandon Pope) to provide three hard copies and one electronic copy of comprehensive technical documentation, including operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, and maintenance manuals for installed equipment with calibration information.
The manuals are to be submitted one time after training completion, with distribution limited to administrative and operational use. The Point of Contact (POC) for review is Brandon Pope from the Production Engineering Division, who will review the manuals and inform contracting of any necessary changes within seven working days. The document is part of a contract for a new DC Motor Testing Console for the Combat Division, Commodity Section II, located in building 421-South at RRAD, with the primary contracting agency being the Department of the Army Materiel Command Contracting Command Detroit Arsenal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 1 Combo Sol DC Motor Test Stand.pdf | ||
| Questions and Responses 25R0002 .pdf | ||
| pin out 2.0.docx | DOCX document | |
| CDRL A0003 Final Acceptance Testing.docx | DOCX document | |
| CDRL A0004 Training.docx | DOCX document | |
| CDRL A0001 Project Schedule.docx | DOCX document | |
| CDRL A0002 Lockout Tagout.docx | DOCX document | |
| 12292399.pdf | ||
| SWI (BFVS) Turret DC Motors 12292401.pdf | ||
| 12292401.pdf | ||
| 12292400.pdf | ||
| SWI (BFVS) Turret DC Motors 399-400.pdf | ||
| 12900597.pdf | ||
| Combined Synop DC Motor Test Stand 3April2025.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Brandon Pope |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 0005 |
| Manuals |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| PD 3.5 |
| RRAD, Contracting |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASRE Q |
| SEE BLOCK 16, ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. The Contractor shall provide three (3) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. Reference PD 3.5
Per block 8. POC will review Manuals IAW with PD and will inform contracting on necessary changes to be made if any within seven (7) working days.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. Manuals will be required one time only after completion of Training.
Per block 11. Manuals will be required one time only after completion of Training.
Per block 12. Manuals will be required one time only after completion of Training.
Distribution addresses:
POC – Brandon Pope, Production Engineering Division Luke Leitschuck, RRAD, Contracting
Repro = electronic delivery
| PED, POC |
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Brandon Pope |
| 16 Dec 2024 |
| Andy Graves, Chief Facilitization Team |
| 16 Dec 2024 |
File details come from the government source that posted it. Updated .