CDRL A0005 Manuals.docx

DOCX document 37 KB Posted

Attached to
DC Motor Test Stand
Solicitation number
W911RQ-25-R-0002
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) for Manuals associated with Solicitation W911RQ-25-R-0002 for a DC Motor Test Stand at Red River Army Depot (RRAD). The CDRL requires the contractor (Brandon Pope) to provide three hard copies and one electronic copy of comprehensive technical documentation, including operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, and maintenance manuals for installed equipment with calibration information.

The manuals are to be submitted one time after training completion, with distribution limited to administrative and operational use. The Point of Contact (POC) for review is Brandon Pope from the Production Engineering Division, who will review the manuals and inform contracting of any necessary changes within seven working days. The document is part of a contract for a new DC Motor Testing Console for the Combat Division, Commodity Section II, located in building 421-South at RRAD, with the primary contracting agency being the Department of the Army Materiel Command Contracting Command Detroit Arsenal.

View the file

Other files

File Type Posted
Amend 1 Combo Sol DC Motor Test Stand.pdf PDF
Questions and Responses 25R0002 .pdf PDF
pin out 2.0.docx DOCX document
CDRL A0003 Final Acceptance Testing.docx DOCX document
CDRL A0004 Training.docx DOCX document
CDRL A0001 Project Schedule.docx DOCX document
CDRL A0002 Lockout Tagout.docx DOCX document
12292399.pdf PDF
SWI (BFVS) Turret DC Motors 12292401.pdf PDF
12292401.pdf PDF
12292400.pdf PDF
SWI (BFVS) Turret DC Motors 399-400.pdf PDF
12900597.pdf PDF
Combined Synop DC Motor Test Stand 3April2025.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OCONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP ____
TM _____
OTHER X
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
Brandon Pope
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

0005
Manuals
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

PD 3.5
RRAD, Contracting
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
REQUIRED
ASRE Q
SEE BLOCK 16, ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE
B
11. AS OF DATE
13. DATE IF SUBSEQUENT SUBM.
Draft
Final

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
RRAD, Contracting

Per block 5. The Contractor shall provide three (3) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. Reference PD 3.5

Per block 8. POC will review Manuals IAW with PD and will inform contracting on necessary changes to be made if any within seven (7) working days.

Per block 9. For administrative and operational use only. (See DoDI 5230.24)

Per block 10. Manuals will be required one time only after completion of Training.

Per block 11. Manuals will be required one time only after completion of Training.

Per block 12. Manuals will be required one time only after completion of Training.

Distribution addresses:

POC – Brandon Pope, Production Engineering Division Luke Leitschuck, RRAD, Contracting

Repro = electronic delivery

PED, POC
1
1
15. TOTAL ▬▬▬▬►
1
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Brandon Pope
16 Dec 2024
Andy Graves, Chief Facilitization Team
16 Dec 2024

File details come from the government source that posted it. Updated .