CDRL A0004 Training.docx
DOCX document 38 KB Posted
- Attached to
- DC Motor Test Stand
- Solicitation number
- W911RQ-25-R-0002
About this file
This document is a Contract Data Requirements List (CDRL) for a DC Motor Test Stand training requirement. The CDRL specifies detailed training provisions for the contract, requiring the contractor to provide qualified representatives to train facility personnel on equipment installation, calibration, maintenance, and operation. The training will consist of a minimum of ten hours for both system operation personnel (10 people) and maintenance personnel (10 people), including verbal instruction and hands-on operations.
The training is associated with Solicitation Number W911RQ-25-R-0002 for a DC Motor Testing Console, issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal. The training will be conducted one time each for production and maintenance personnel following a successful Acceptance Test. All training materials will be provided in English at no additional cost to the government. The CDRL was prepared by Brandon Pope on 16 December 2024 and approved by Andy Graves, Chief of the Facilitization Team on the same date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 1 Combo Sol DC Motor Test Stand.pdf | ||
| Questions and Responses 25R0002 .pdf | ||
| pin out 2.0.docx | DOCX document | |
| CDRL A0001 Project Schedule.docx | DOCX document | |
| CDRL A0003 Final Acceptance Testing.docx | DOCX document | |
| CDRL A0002 Lockout Tagout.docx | DOCX document | |
| CDRL A0005 Manuals.docx | DOCX document | |
| SWI (BFVS) Turret DC Motors 12292401.pdf | ||
| SWI (BFVS) Turret DC Motors 399-400.pdf | ||
| 12292400.pdf | ||
| 12292399.pdf | ||
| 12292401.pdf | ||
| 12900597.pdf | ||
| Combined Synop DC Motor Test Stand 3April2025.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| DC Motor Test Stand |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 0004 |
| Training Requirements |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| PD 3.4 |
| RRAD, Contracting |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASRE Q |
| SEE BLOCK 16, ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. The contractor shall provide one or more qualified representatives who are thoroughly familiar with all aspects of equipment, installation, calibration, maintenance, and operation, for the purpose of training facility personnel. All printed training aids shall be supplied at no additional cost to the Government and shall be in English language. Training consist of a minimum of ten hours for system operation personnel (10 people) and ten hours for maintenance personnel (10 people). It shall consist of verbal instruction and hands-on operations by contractor representative. Reference PD 3.4
Per block 8. POC verify all training requirements IAW with PD and will inform contracting immediately on necessary changes to be made.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. Training will be required one time for production personnel and one time for Maintenance personnel after successful Acceptance Test.
Per block 11. Training will be required one time for production personnel and one time for Maintenance personnel after successful Acceptance Test.
Per block 12. Training will be required one time for production personnel and one time for Maintenance personnel after successful Acceptance Test.
Distribution addresses:
POC – Brandon Pope, Production Engineering Division Luke Leitschuck, RRAD, Contracting
Repro = electronic delivery
| PED, POC |
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Brandon Pope |
| 16 Dec 2024 |
| Andy Graves, Chief Facilitization Team |
| 16 Dec 2024 |
File details come from the government source that posted it. Updated .