CDRL A0001 Project Schedule.docx
DOCX document 41 KB Posted
- Attached to
- DC Motor Test Stand
- Solicitation number
- W911RQ-25-R-0002
About this file
This is a Contract Data Requirements List (CDRL) for a DC Motor Test Stand project issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal. The solicitation (W911RQ-25-R-0002) requires the contractor to develop and install a DC Motor Testing Console for the Combat Division at Red River Army Depot (RRAD) within 12 months of contract award.
Key requirements include submission of a detailed project schedule electronically within two weeks of award, coordination with RRAD Point of Contact, and adherence to a four-day, ten-hour work week schedule (Monday-Thursday, 0630-1700). The project schedule must show comprehensive milestones for machine installation and will be subject to Contracting Officer approval. The final schedule must be submitted in PDF format electronically, with distribution to specified contacts including Brandon Pope from Production Engineering Division and Luke Leitschuck from RRAD Contracting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Responses 25R0002 .pdf | ||
| Amend 1 Combo Sol DC Motor Test Stand.pdf | ||
| pin out 2.0.docx | DOCX document | |
| CDRL A0004 Training.docx | DOCX document | |
| CDRL A0002 Lockout Tagout.docx | DOCX document | |
| CDRL A0005 Manuals.docx | DOCX document | |
| CDRL A0003 Final Acceptance Testing.docx | DOCX document | |
| 12292399.pdf | ||
| 12292401.pdf | ||
| 12900597.pdf | ||
| SWI (BFVS) Turret DC Motors 12292401.pdf | ||
| SWI (BFVS) Turret DC Motors 399-400.pdf | ||
| 12292400.pdf | ||
| Combined Synop DC Motor Test Stand 3April2025.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| DC Motor Test Stand |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 0001 |
| Project Schedule |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| PD 3.0 |
| RRAD, Contracting |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASREQ |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| Reg |
| Repro |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. The machine shall be installed and operational within 12 months from contract award. The contractor shall submit a detailed project schedule electronically that shows milestones for a completed machine installation within the 12 months. Any modifications or extensions shall be requested through the Contracting Officer for this contract. The contractor shall coordinate the proposed project schedule with RRAD POC within fourteen (14) days prior to delivery of the system after receipt of order. The project schedule shall be subject to approval. Approval of the project schedule shall not relieve the contractor of any responsibility for performance. RRAD works a four day, ten hour workweek, Mon-Thurs, 0630-1700. Working Friday is not guaranteed, but will be taken into consideration. Contractor may request to work Friday with 48 hours prior notice to RRAD POC. PD 3.0
Per block 8. Contracting Officer will review Project Schedule IAW with PD and will inform contracting on necessary changes to be made if any within seven (7) working days.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. Project Schedule shall be required one time only unless revisions are required.
Per block 12. Project Schedule shall be submitted no later than two (2) weeks after receipt of award.
Format; PDF submitted electronically.
Distribution addresses:
POC – Brandon Pope, Production Engineering Division Luke Leitschuck, RRAD, Contracting
Repro = electronic delivery
| PED, POC |
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Brandon Pope |
| 16 Dec 2024 |
| Andy Graves, Chief Facilitization Team |
| 16 Dec 2024 |
File details come from the government source that posted it. Updated .