This document is a Contract Data Requirements List (CDRL) for a DC Motor Test Stand, associated with Solicitation Number W911RQ-25-R-0002 issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal. The CDRL specifies requirements for final acceptance testing of the test stand, which must demonstrate the system's ability to perform testing procedures without failures on specific motor variations: Traverse A3 Motor, 12900597, 12292399, 12292400, and 12292401.

The final acceptance test will be conducted once the machine is installed and operational, with testing to be observed by a Point of Contact (POC) who will immediately inform contracting of the results. The document is prepared by Brandon Pope from Production Engineering Division and approved by Andy Graves, Chief Facilitization Team, with a preparation and approval date of 16 Dec 2024. Distribution addresses include Brandon Pope, Luke Leitschuck from RRAD Contracting, and is marked for administrative and operational use only.

View the file

Other files

File Type Posted
Amend 1 Combo Sol DC Motor Test Stand.pdf PDF
Questions and Responses 25R0002 .pdf PDF
pin out 2.0.docx DOCX document
CDRL A0002 Lockout Tagout.docx DOCX document
CDRL A0005 Manuals.docx DOCX document
CDRL A0004 Training.docx DOCX document
CDRL A0001 Project Schedule.docx DOCX document
12292399.pdf PDF
12292401.pdf PDF
12900597.pdf PDF
SWI (BFVS) Turret DC Motors 12292401.pdf PDF
SWI (BFVS) Turret DC Motors 399-400.pdf PDF
12292400.pdf PDF
Combined Synop DC Motor Test Stand 3April2025.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OCONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP ____
TM _____
OTHER X
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
DC Motor Test Stand
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

0003
Final Acceptance Testing
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

PD 3.3
RRAD, Contracting
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
REQUIRED
ASRE Q
SEE BLOCK 16, ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE
B
11. AS OF DATE
13. DATE IF SUBSEQUENT SUBM.
Draft
Final

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
RRAD, Contracting

Per block 5. A final acceptance test shall be performed. The test shall demonstrate the system’s ability to perform all required testing procedures without failures, on one each of the different variations of motors we currently repair, Traverse A3 Motor, 12900597, 12292399, 12292400, and 12292401 Reference PD 3.3

Per block 8. POC will observe the final acceptance test IAW with PD and will inform contracting on results immediate after testing is completed.

Per block 9. For administrative and operational use only. (See DoDI 5230.24)

Per block 10. Final Acceptance Test will be required one time for 1 successful test on each of motors cited above only once machine has been installed and made operational.

Per block 11. Final Acceptance Test will be required one time for 1 successful test on each of motors cited above only once machine has been installed and made operational.

Per block 12. . Final Acceptance Test will be required one time for 1 successful test on each of motors cited above only once machine has been installed and made operational.

Distribution addresses:

POC – Brandon Pope, Production Engineering Division Luke Leitschuck, RRAD, Contracting

Repro = electronic delivery

PED, POC
1
1
15. TOTAL ▬▬▬▬►
1
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Brandon Pope
16 Dec 2024
Andy Graves, Chief Facilitization Team
16 Dec 2024