W911KB-17-R-0011_JBE041_AM_13.pdf
PDF 91 KB Posted
- Attached to
- JBE041 Add/Alter Hangar JBER, Alaska
- Solicitation number
- W911KB-17-R-0011
About this file
This document provides details for a two-phase solicitation for design-build services to upgrade aircraft sheltering and maintenance hangar space at Joint Base Elmendorf-Richardson in Alaska. The Army Corps of Engineers seeks to add and alter an AWACS alert hangar to accommodate the facility mission and meet alert requirements by housing aircraft, maintenance, squadron operations, and air crew quarters in the same facility. Phase one proposals are due by October 20, 2016 and phase two by May 3, 2017. The project has an anticipated contract cost limitation of $25 million and period of performance of 575 calendar days. The acquisition will evaluate offerors on factors including specialized experience, past performance, organization, technical approach, design, small business participation, and price. The solicitation will be available through FedBizOpps and notifications will only be posted online. The contracting office is located at JBER, Alaska.
W911KB-17-R-0011 JBE041 AM#13 Note: FBO will so as Amendment 14
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: JBE041 ADD/ALTER AWACS Alert Hangar, JBER, Alaska
PROPOSAL DUE DATE: Phase 2 proposal due date has not been extended. Proposal due date remains May 3, 2017, 2:00PM Alaska Time.
Proposals shall be submitted in accordance w ith Section 00 21 00, Para 1.9, Proposal Submittals.
This amendment provides changes to the solicitation as indicated on the continuation page of this document.
YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THIS STANDARD FOR 1442.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Apr-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-17-R-0011
X 9B. DATED (SEE ITEM 11)
20-Oct-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Apr-2017
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - STANDARD FORM (SF) 1442
The required response date/time has not been extended.
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded drawings.
NONE
b. The following revised documents are substituted for the superseded documents. The identifier “AM#13” appears before and after new and/or revised material, except as noted below.
• SECTION 00 22 20, Phase 2, 5.3.1 General Preferable Items:
NOTE: Revisions within the following documents do not contain the above referenced identifiers.
c. The following clause has been added:
N/A
d. The following clauses have been updated:
N/A
e. The following section is deleted.
f. The following documents are added.
g. The following revisions are incorporated.
h. Other:
Section 00 22 20
Section 00 22 20 W911KB-17-R-0011-0013
JBE041
• Are the proposed colors and material finishes conducive to the working environment of the facility?
• Has the proposal addressed/provided for natural and artificial light in working spaces and is the arrangement of fenestration and lighting fixtures in the spaces conducive to space usage?
• Has “support item” placement been considered and addressed in the proposal to enhance the environment? For example: placement of supply/exhaust devices, placement of electrical panels, and placement of exhaust fans, etc.
• Does the proposal provide for acoustic control of noise in the hangar?
5.2.2.3. Minimum Space and Facility Size: The proposal must include all the mandatory spaces in response to the requirements set forth in Section 01 10 00, Statement of Work. For this element, proposals will be evaluated on compliance with these requirements. Individual areas may slightly exceed the requirements, so long as building function is not compromised elsewhere and as long as the overall square footage is not greater than that as described in Section 01 10 00, as authorized by Congress.
5.3. VOLUME 1- TAB B – SUBFACTOR 2 - QUALITY OF BUILDING SYSTEMS AND MATERIALS
5.3.1. General. As part of this Subfactor, the Government has identified certain items as desirable features or preferable items. Desirable features are identified below in the evaluation criteria. Preferable items are listed in order of priority.
These items, along with any Offeror-identified betterment, will be given additional consideration during the evaluation process, provided that they are included in the proposed base price and are within the contract cost limitation (CCL) identified in the Solicitation.
Preferable Items:
1. Day lighting via insulated translucent wall systems located on all four sides of hangar bay. System shall consist of translucent wall panels with minimum light transmission of 17% and U-factor of 0.05 thermally broken.
2. Sound absorption panels/baffles in ceiling and/or on walls to reduce noise in the Hangar bay area. Baffle face area will ideally total at least half of the total combined wall and ceiling area of the hangar bay (less doors). Sound baffle core should be inert, mildew resistance and meet fire rating ASTM E- 84 class I.
Baffles will ideally have noise reduction capability of 25 STC or 0.80 NRC, minimum.
3. AM #13… Laminate solar panels mounted to vertical building surfaces. …AM#13
5.3.2. Submission Requirements:
5.3.2.1. Presentation Drawings
There are no specific drawings requirements for this Subfactor. However, the Offeror has the option of providing concept level drawing information for specific materials and/or systems which the Offeror feels are necessary to describe the proposed systems or materials in the drawings provided under Tab A.
5.3.2.2. Technical Approach Narrative:
Provide technical approach narrative, both qualitative and quantitative, defining the elements of the proposal. It is the responsibility of the proposer to ensure that all aspects identified in the evaluation criteria below are addressed.
Maximum total length for the narrative shall be ten (10) typewritten pages.
(a) Architectural Finishes: Describe how the materials selected provide for a suitable environment for the
| 00 22 20_Repl Pg_remove solar panels.pdf |
| 5.3.2. Submission Requirements: |
| 5.3.2.2. Technical Approach Narrative: |
File details come from the government source that posted it. Updated .