W911KB-17-R-0011-AM_27.pdf
PDF 481 KB Posted
- Attached to
- JBE041 Add/Alter Hangar JBER, Alaska
- Solicitation number
- W911KB-17-R-0011
About this file
This amendment modifies a solicitation for design-build services to upgrade aircraft facilities at Joint Base Elmendorf-Richardson in Alaska. The services include designing and constructing an addition to an alert hangar, renovating an existing building for squadron operations, adding alert crew quarters, and performing related site work. The amendment changes the proposal due date from August 13, 2018 to August 23, 2018 at 2:00PM Alaska Standard Time. Pricing is to be provided using unit prices for defined line items. Evaluation will consider technical design approach, past performance, price, and participation of small businesses.
W911KB-17-R-0011_AM#27 Ph2 JBE041
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: JBE041 ADD/ALTER AWACS ALERT HANGAR, JBER Alaska
PROPOSAL DUE DATE: The proposal due date has been changed from 13 August 2018 to 23 August 2018, 2:00PM Alaska Standard Time.
YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE SF1442
See Page 2 Continuation Sheet for details
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-17-R-0011
X 9B. DATED (SEE ITEM 11)
20-Oct-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jul-2018
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
a. The following drawings are substituted for the superseded drawings.
NONE
b. The following revised documents are substituted for the superseded documents. The identifier “AM#27” appears before and after new and/or revised material, except as noted below.
SECTION 00 11 01, Proposal Schedule, replaced in its entirety.
NOTE: Revisions within the following documents do not contain the above referenced identifiers.
Proposal due date changed from August 13, 2018 to August 23, 2018 at 2:00PM Alaska
Standard Time.
c. The following clause has been added:
d. The following clauses have been updated:
e. The following section is deleted.
f. The following documents are added.
g. The following revisions are incorporated.
h. Other:
W911KB-17-R-0011
PS-1
AM#27 PROPOSAL SCHEDULE
ADD/ALTER AWACS ALERT HANGAR
JBER-ELMENDORF, ALASKA
BASE ITEMS
Item No.
Description Estimated Quantity
Unit Unit Price Amount
0001 Design AWACS Alert hangar, Complete
1 Job $_________ $_________
0002 Renovation of bldg 14410, Complete 1 Job $_________ $_________
0003 Construct additional AWACS Alert Crew and Squadron Operation areas within the 5-foot line, Complete
1 Job $_________ $_________
0004 Construct Sitework beyond the building 5-foot line, Complete 1 Job $_________ $_________
0005 Design Structural Upgrades to Risk Category 3, Complete 1 Job $_________ $_________
0006 Construct Structural Upgrades to Risk Category 3, Complete 1 Job $_________ $_________
0007 Remove, Sample stockpile 10 Cubic Yards of POL Contaminated Soil including Construction of Holding Cells, Complete*
10 CY $_________ $_________
0008 Sample suspect materials for asbestos 1 EA $_________ $_________
0009 Remove asbestos containing building materials, complete 10 LF $_________ $_________
0010 Remove asbestos containing building materials, complete 100 SF $_________ $_________
0011 Dispose of asbestos containing building materials 1 CY $_________ $_________
0012 Design and construct Fall Protection System (Single Rail), Complete
1 Job $_________ $_________
Total of Base Items 0001 thru 0012 $_________
OPTION ITEMS
Item No.
Description Estimated Quantity
Unit Unit Price Amount
0013 Construct Hangar Catwalk System and associated structural 1 Job $_________ $_________
PS-2
upgrades, Complete
0014 Design and construct Fall Protection System (Two Rail), Complete
1 Job $_________ $_________
Total of Option Item 0014 $_________
Total of Base and Optional Items 0001 thru 0014 $_________
Proposed Contract Duration: ____________________
* Work on CLIN 0007 shall be the cost for work identified in Specs 02 61 13 “Excavation and Handling of Contaminated Material” and Section 01 57 20.01 29 “Environmental Protection” that is additional to the requirements of the normal project excavation and the field screening identified in Section 31 09 20.00 29 “Field Screen Testing of Soils for POL Contamination”. For CLIN 0007, the Contractor shall keep a record of the amount of contaminated soil being excavated and disposed of. If the amount of contaminated soil being excavated & disposed of is above 115% or below 85% of the estimated quantity, the equitable adjustment will be in accordance with FAR CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY.
*** For CLIN 0009 – CLIN 0011, the Contractor shall keep a record of the amount of the asbestos containing building materials removed and disposed of. If the amount of asbestos containing building materials being removed & disposed of is above 115% or below 85% of the estimated quantity, the equitable adjustment will be in accordance with FAR CLAUSE 52.211-
18, VARIATION IN ESTIMATED QUANTITY.
EVALUATION OF OFFERS.
1. AWARD: Award will be made in accordance with Section 00 22 10 - EVALUATION
FACTORS FOR AWARD.
2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.
3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
4. SPECIAL CONDITION: If a modification to an offer based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the proposal schedule.
END OF PROPOSAL SCHEDULE AM#27
File details come from the government source that posted it. Updated .