Att_16_DCAA_Preaward_Accounting_System_Checklist.pdf

PDF 1 MB Posted

Attached to
Consolidated Product-Line Management (CPM) Plus - Request for Proposal (RFP)
Solicitation number
W900KK-19-R-0021
Issued by

About this file

This document is a synopsis for a Request for Proposal for the Consolidated Product-Line Management Plus acquisition. The U.S. Army Contracting Command - Orlando, on behalf of the Program Executive Office for Simulation, Training, and Instrumentation's Project Manager Training Devices office, intends to issue a full and open competition RFP for an single-source Indefinite Delivery/Indefinite Quantity contract with an eight-year ordering period to continue managing and evolving the Live Training Transformation Product Line. The anticipated NAICS code is 333318 with a size standard of 1,000 employees, the maximum total ID/IQ ceiling value is $883 million, proposals are due in May 2019 with an anticipated award date of January 2020. The effort focuses on requirements, development, execution, management and synchronization of the product line and provides total life cycle support to programs utilizing the product line.

Att 16_DCAA Checklist

View the file

Other files

File Type Posted
Att_07.3_CTC-IS_Software_License_List_Amend_0001.xlsx XLSX spreadsheet
CPM_Plus_Final_RFP_QnA_Consolidated.xlsx XLSX spreadsheet
Att_06_Construct_TO_0002_Amend_0001.docx DOCX document
W900KK19R0021_RFP_Amendment_0001.pdf PDF
W900KK19R0021_RFP_Conformed.pdf PDF
Att_15_CPM_Plus_Workbook_Amend_0001.xlsx XLSX spreadsheet
Att_07_CTC-IS_DO_0003_Amend_0001.docx DOCX document
Att_11_LT2_Portal_Documents.pdf PDF
Att_03_Small_Business_Commitment_Document.xlsx XLSX spreadsheet
Att_10_LT2_Portal_Instructions.pdf PDF
Att_02_DD254_W900KK-19-R-0021_CPM_Plus.pdf PDF
Att_09_SF1408-14a.pdf PDF
Att_12_IDE_Lab_Facility_Description.pdf PDF
Att_15_CPM_Plus_Workbook.xlsx XLSX spreadsheet
Att_01_CPM_Plus_Base_SOW_SOW-2018-007.pdf PDF
Att_02.1_Item_13_Security_Guidance.pdf PDF
W900KK19R0021_RFP.pdf PDF
Att_06.3_CPM_Plus_Construct_GFP_Listing.xlsx XLSX spreadsheet
Att_06.1_Construct_PWS.docx DOCX document
Att_06.2_Construct_CDRLs.docx DOCX document
Att_07_CTC-IS_DO_0003.docx DOCX document
Att_08_Industry_Question-Comment_Form.pdf PDF
Att_13_Ordering_Procedures.pdf PDF
Att_06_Construct_TO_0002.docx DOCX document
Att_02.2_FOUO_Attachment.pdf PDF
Att_14_Traceability_Matrix.xlsx XLSX spreadsheet
Att_05.1_CTIA_PWS.docx DOCX document
Att_05.2_CTIA_CDRLs.docx DOCX document
Att_07.2_CTC-IS_CDRLs.docx DOCX document
Att_04_Data_Item_Transmittal.pdf PDF
Att_05_CTIA_TO_0001.docx DOCX document
Att_07.1_CTC-IS_SOW.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM

Name, Title, and signature of Company Principal (President/VP/Controller, etc) responsible for the design of the Accounting System.

PLEASE ANSWER THE QUESTIONS BELOW:

HAVE YOU READ THE DCAA PUBLICATION DCAAM 7641.90 - "Information for Contractors" ON For each question, check only one box. ALL questions must have explanatory narrative text entered in the boxes. Please provide sufficient detail to describe the process (Including Account Numbers/Process Flow etc.) Each Question must be complete. Do NOT refer to previous answers, (i.e. "See Question 3 Above").

Pre-award Survey of Prospective Contractor Accounting System Checklist

1. Has your organization's Accounting System ever been audited by DCAA?

the DCAA Report number or DCAA POC info.

1.A. If the answer is "Yes" to Question 1 above, when was the audit performed?

1.B. If the answer is "Yes" to Question 1 above, did DCAA determine the Accounting System acceptable for award of prospective contracts?

1.C. If the answer is "Yes" to Question 1 above, have there been any changes to the Accounting System since the DCAA audit?

2.B. Has your organization been notified by DCAA that it is (or may be in) non-compliance with its disclosure statement or CAS?

Pre-award Survey of Prospective Contractor Accounting System Checklist

2. Is your organization subject to CAS (48 CFR Chapter 99)?

(If YES (FULL or MODIFIED), the Offeror MUST attach a copy of their most recent audit reports/documentation regarding all CAS compliance or non-compliance issues to this Modified Pre-Award Survey) 2.A. Has your organization submitted a CASB disclosure statement (CASB DS-1) to DCAA and has it been determined adequate?

2.c. Is any aspect of this proposal inconsistent with your orgnaization's disclosed practices or applicable CAS?

Instruction: If the Contractor is planning on bidding on Cost Type Contracts, the contractor MUST provide explanatory narrative for all of the following questions:

3. Has your organization's Accounting System been audited by an outside Certified Public Accountant/Consultant or other Cognizant Federal Agency other than DCAA?

4. Is your organization's Accounting System currently in full operation?

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

6. Is your organization's Accounting System ready for a DCAA audit?

7. Are the loaded hourly labor rates proposed consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles? (Answer this Questions "N/A" if you do not have an active proposal)

5. Is your organization's Accounting System in accord with Generally Accepted Accounting Principles (GAAP) Applicable in the Circumstances?

8. Does the Accounting System provide for the proper segregation of Direct Costs from Indirect Costs?

9. Does the Accounting System provide for the identification and accumulation of Direct Costs by contract?

10. Does the Accounting System provide for a logical and consistent method for the allocation of Indirect Costs to intermediate and final cost objectives? (A contract is a final cost objective.)

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

11. Does the Accounting System Provide for the accumulation of costs under general ledger control?

12. Does the Accounting System provide for a timekeeping system that identifies employees' labor by intermediate or final cost objectives?

13. Does the Accounting System provide for a labor distribution system that charges Direct and Indirect labor to the appropriate cost objectives?

14. Does the Accounting System provide for an interim (at least monthly) determination of costs charged to a contract through routine posting of books of account?

15. Does the Accounting System provide for an exclusion of costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions?

16. Does the Accounting System provide for the identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract?

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

17. Does the Accounting System provide for the segregation of preproduction costs from production costs?

18. Does the Accounting System provide financial information required by contract clauses concerning limitation of cost (FAR 52.232.20) or limitation on payments (FAR 52.216-16)?

19. Does the Accounting System provide financial information required to support requests for Progress Payments?

Pre-award Survey of Prospective Contractor Accounting System Checklist

22. Is your organization currently performing on Cost-Type (FAR 16.3) contracts/task orders?

21. Is your organization planning on submitting proposals on Cost-Type (FAR 16.3) contracts/task orders?

20. Is the Accounting System designed, and are the records maintained, in such manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

Pre-award Survey of Prospective Contractor Accounting System Checklist 11.0.0.20130303.1.892433.887364 7142287093 1/06/2016 DCAA/Policy and Plans DCAA Preaward survey of Prospective Contractor Accounting System Checklist Naomi Vaughn Draft Preaward survey of Prospective Contractor Accounting System Checklist

Enter Date as MONTH/DAY/YEAR XX/XX/XXXX:
TextField1:
TextField2:
TextField3:
DateField2:
TextField4:
TextField5:
CheckBox1:
CheckBox2:
CheckBox3:
TextField6:
CheckBox4:
CheckBox5:
TextField7:
CheckBox6:

File details come from the government source that posted it. Updated .