Att_04_Data_Item_Transmittal.pdf
PDF 566 KB Posted
- Solicitation number
- W900KK-19-R-0021
About this file
This document provides details for the Consolidated Product-Line Management (CPM) Plus acquisition. The U.S. Army Contracting Command in Orlando, on behalf of the Program Executive Office for Simulation, Training, and Instrumentation's Project Manager Training Devices office, is seeking proposals for an Indefinite Delivery/Indefinite Quantity single award contract with an 8-year ordering period and a maximum total ceiling value of $883 million. The contract will provide for the requirements, development, execution, management, and synchronization of the Live Training Transformation Product Line, including continuing development and evolution of products/systems, core assets, frameworks, and the product line construct. The contractor must provide mature processes and have a minimum Capability Maturity Model Integration Level 3 rating. The solicitation number is W900KK-19-R-0021 and proposals are due in May 2019, with an anticipated award date of January 2020. The applicable North American Industry Classification System code is 333318.
Att 04_Data Item Transmittal
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM TRANSMITTAL/ACCEPTANCE/REJECTION FORM
Contract W900KK-___________
CLIN/ELIN: ______/_______ TITLE: ___________________________________________________ Block 14 Distribution: ________________ Other: CDRL Number
Doc. Ref. No.:______________________________ Date:_______________________ From:
To: U.S. Army Contracting Command - Orlando 12211 Science Drive, Orlando, FL 32826-3224
ATTN: _____________________________________
The above detailed CDRL item is forwarded for review and acceptance/ rejection. This item is due __________, Government review period is days.
Signature:
Typed Name/Title: ______________________________
FIRST ENDORSEMENT: Date Received:
( ) Accepted.
( ) Accepted. Attached comments must be incorporated into the next scheduled submission. (This block is for use with periodically submitted items only.)
( ) Rejected, comments attached. Change pages ( ) are ( ) not sufficient for correction. Contractor is allowed ( ) 30 days or ( ) days to resubmit.
Signature:
Typed Name/Title: ________________________________________ Date: _________________
VIA: Date:
VIA: PD Date:
SECOND ENDORSEMENT:
( ) Accepted.
( ) Accepted conditionally. Attached comments must be incorporated in the next scheduled submission.
( ) Rejected, comments attached. Resubmit no later than __________________
Signature:
Typed Name/Title: ____________________________ Date: ________________ Contracting Officer
CC w/Encl.:
CC w/o Encl.:
matthew.fehl Typewritten Text matthew.fehl Typewritten Text matthew.fehl Typewritten Text
| CLINELIN: |
| undefined_2: |
| TITLE: |
| Block 14 Distribution: |
| Doc Ref No: |
| The above detailed CDRL item is forwarded for review and acceptance rejection This item is due: |
| ATTN: |
| Date_2: |
| VIA Date: |
| VIA PD Date: |
| Rejected comments attached Resubmit no later than: |
| Date_3: |
| CC wEncl: |
| CC wo Encl: |
| Group2: Off |
| MM/DD/YYYY: |
| Check Box5: Off |
| Text6: |
| Text7: |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Group1: Off |
| Text13: |
| Text15: |
| Text17: |
| Text1: |
| Text2: |
| Text3: |
| Text4: |
File details come from the government source that posted it. Updated .