Att_05_CTIA_TO_0001.docx
DOCX document 32 KB Posted
- Solicitation number
- W900KK-19-R-0021
About this file
This task order attachment and related federal contract opportunity outline requirements for consolidated product line management support services. The task order provides cost-plus-fixed-fee terms for post-deployment software sustainment, engineering, technical data, and manpower reporting for the Common Training Instrumentation Architecture program. Options may be exercised over four additional one-year periods. Services will be delivered to and accepted by the Army Program Executive Office for Simulation, Training and Instrumentation at their Orlando location. The federal contract opportunity is an indefinite-delivery/indefinite-quantity solicitation seeking proposals for an eight-year CPM Plus contract supporting evolution and life cycle management of the Live Training Transformation product line. Proposals are due in May 2019 and award is expected in January 2020, with a maximum $883 million ceiling over the eight-year ordering period.
Att 05_CTIA TO 0001
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 05
W900KK-19-R-0021
Task Order 0001
Section B - Supplies or Services and Prices
B.1 This is a Cost-Plus-Fixed-Fee Term type task order in accordance with FAR 16.306(d)(2)
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| CTIA PDSS |
Lot
CPFF
CTIA Post Deployment Software/System Sustainment (PDSS), Quality, and CTIA Technology Insertion
3.1.1 CTIA PDSS; 3.1.3 CTIA SW/System Test Eng
3.1.2 CTIA Tech Insertion; 3.1.6 Systematic Quality
3.1.7 SW Quality; 3.2 Program Management
FOB: Destination
| COST |
| $______________ |
| FIXED FEE |
| $______________ |
| TOTAL EST COST + FEE |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0002 |
| CTIA Engineering |
Lot
CPFF
CTIA Software/Systems Engineering
3.1.3 CTIA SW/System Test Eng; 3.1.4-CTIA
SW/System Engineering; 3.2 Program Management;
3.3 Anti terrorism; 3.1.5 HW/SW integration
3.1.6 Systematic Quality; 3.1.7 Software Quality
FOB: Destination
| COST |
| $______________ |
| FIXED FEE |
| $______________ |
| TOTAL EST COST + FEE |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0003 |
| Technical Data |
| Lot |
NSP
CPFF
CTIA Technical Documentation
3.1.1 CTIA PDSS; 3.1.2 CTIA Tech insertion
3.1.3 CTIA SW/System Test Eng; 3.1.4 CTIA
SW/System Engineering; 3.1.6 Systematic Quality
3.2 Program Management
FOB: Destination
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0004 |
| Contractor Manpower Reporting |
| Lot |
FFP
CTIA CMRA
3.2 Program Management
FOB: Destination
| NET AMT |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1001 |
| CTIA PDSS |
Lot
| OPTION |
| CPFF |
CTIA Post Deployment Software/System Sustainment (PDSS), Quality, and CTIA Technology Insertion
3.1.1 CTIA PDSS; 3.1.3 CTIA SW/System Test Eng
FOB: Destination
| COST |
| $______________ |
| FIXED FEE |
| $______________ |
| TOTAL EST COST + FEE |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1002 |
| CTIA Engineering |
Lot
| OPTION |
| CPFF |
CTIA Software/Systems Engineering
3.1.3 CTIA SW/System Test Eng; 3.1.4-CTIA
FOB: Destination
| COST |
| $______________ |
| FIXED FEE |
| $______________ |
| TOTAL EST COST + FEE |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1003 |
| Technical Data |
| Lot |
NSP
| OPTION |
| CPFF |
CTIA Technical Documentation
3.1.1 CTIA PDSS; 3.1.2 CTIA Tech insertion
FOB: Destination
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1004 |
| Contractor Manpower Reporting |
| Lot |
| OPTION |
| FFP |
CTIA CMRA
3.2 Program Management
FOB: Destination
| NET AMT |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2001 |
| CTIA PDSS |
Lot
| OPTION |
| CPFF |
CTIA Post Deployment Software/System Sustainment (PDSS), Quality, and CTIA Technology Insertion
3.1.1 CTIA PDSS; 3.1.3 CTIA SW/System Test Eng
FOB: Destination
| COST |
| $______________ |
| FIXED FEE |
| $______________ |
| TOTAL EST COST + FEE |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2002 |
| CTIA Engineering |
Lot
| OPTION |
| CPFF |
CTIA Software/Systems Engineering
3.1.3 CTIA SW/System Test Eng; 3.1.4-CTIA
FOB: Destination
| COST |
| $______________ |
| FIXED FEE |
| $______________ |
| TOTAL EST COST + FEE |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2003 |
| Technical Data |
| Lot |
NSP
| OPTION |
| CPFF |
CTIA Technical Documentation
3.1.1 CTIA PDSS; 3.1.2 CTIA Tech insertion
FOB: Destination
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2004 |
| Contractor Manpower Reporting |
| Lot |
| OPTION |
| FFP |
CTIA CMRA
3.2 Program Management
FOB: Destination
| NET AMT |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3001 |
| CTIA PDSS |
Lot
| OPTION |
| CPFF |
CTIA Post Deployment Software/System Sustainment (PDSS), Quality, and CTIA Technology Insertion
3.1.1 CTIA PDSS; 3.1.3 CTIA SW/System Test Eng
FOB: Destination
| COST |
| $______________ |
| FIXED FEE |
| $______________ |
| TOTAL EST COST + FEE |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3002 |
| CTIA Engineering |
Lot
| OPTION |
| CPFF |
CTIA Software/Systems Engineering
3.1.3 CTIA SW/System Test Eng; 3.1.4-CTIA
FOB: Destination
| COST |
| $______________ |
| FIXED FEE |
| $______________ |
| TOTAL EST COST + FEE |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3003 |
| Technical Data |
| Lot |
NSP
| OPTION |
| CPFF |
CTIA Technical Documentation
3.1.1 CTIA PDSS; 3.1.2 CTIA Tech insertion
FOB: Destination
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3004 |
| Contractor Manpower Reporting |
| Lot |
| OPTION |
| FFP |
CTIA CMRA
3.2 Program Management
FOB: Destination
| NET AMT |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4001 |
| CTIA PDSS |
Lot
| OPTION |
| CPFF |
CTIA Post Deployment Software/System Sustainment (PDSS), Quality, and CTIA Technology Insertion
3.1.1 CTIA PDSS; 3.1.3 CTIA SW/System Test Eng
FOB: Destination
| COST |
| $______________ |
| FIXED FEE |
| $______________ |
| TOTAL EST COST + FEE |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4002 |
| CTIA Engineering |
Lot
| OPTION |
| CPFF |
CTIA Software/Systems Engineering
3.1.3 CTIA SW/System Test Eng; 3.1.4-CTIA
FOB: Destination
| COST |
| $______________ |
| FIXED FEE |
| $______________ |
| TOTAL EST COST + FEE |
| $______________ |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4003 |
| Technical Data |
| Lot |
NSP
| OPTION |
| CPFF |
CTIA Technical Documentation
3.1.1 CTIA PDSS; 3.1.2 CTIA Tech insertion
FOB: Destination
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4004 |
| Contractor Manpower Reporting |
| Lot |
| OPTION |
| FFP |
CTIA CMRA
3.2 Program Management
FOB: Destination
| NET AMT |
| $______________ |
Section C – Descriptions and Specifications
C.1 DESCRIPTIONS/SPECIFICATION/WORK STATEMENT
The contractor shall perform the work as identified in Section B in accordance with the Statement of Work (SOW) SOW-2018-008, entitled “Live Training Transformation (LT2) Common Training Instrumentation Architecture (CTIA),” dated 7 December 2017 (Attachment 1, Section J).
C.2 OPTION CLINs 1001 THROUGH 4004
The contractor shall perform option CLINs upon their exercise as identified in Section B in accordance with the Statement of Work listed in Section C.1.
C.3 EXERCISE OF OPTIONS
The Government reserves the right to unilaterally exercise the options as indicated in the CLIN structure during the timeframes specified below. The Government has the right to order any or none of the option periods. A Standard Form 30 shall be used to exercise the option periods that are not exercised at time of Delivery/Task Order award.
Option CLINs 1001-1004: The Government may exercise these option anytime from 6 months after award through 12 months after award.
Option CLINs 2001-2004: The Government may exercise these option anytime from 18 months after award through 24 months after award.
Option CLINs 3001-3004: The Government may exercise these option anytime from 30 months after award through 36 months after award.
Option CLINs 4001-4004: The Government may exercise these option anytime from 42 months after award through 48 months after award.
C.4 All terms and conditions of the basic contract apply to this order.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 1002 |
| Destination |
| Government |
| Destination |
| Government |
| 1003 |
| Destination |
| Government |
| Destination |
| Government |
| 1004 |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
| 2002 |
| Destination |
| Government |
| Destination |
| Government |
| 2003 |
| Destination |
| Government |
| Destination |
| Government |
| 2004 |
| Destination |
| Government |
| Destination |
| Government |
| 3001 |
| Destination |
| Government |
| Destination |
| Government |
| 3002 |
| Destination |
| Government |
| Destination |
| Government |
| 3003 |
| Destination |
| Government |
| Destination |
| Government |
| 3004 |
| Destination |
| Government |
| Destination |
| Government |
| 4001 |
| Destination |
| Government |
| Destination |
| Government |
| 4002 |
| Destination |
| Government |
| Destination |
| Government |
| 4003 |
| Destination |
| Government |
| Destination |
| Government |
| 4004 |
| Destination |
| Government |
| Destination |
| Government |
Section F – Deliveries or Performance
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| POP 12 Months After Contract Award (ACA) |
| 1 |
| U.S. ARMY PEO STRI RECEIVING |
SIMULATION, TRAINING AND INSTRUMENTATION
12350 RESEARCH PARKWAY
ORLANDO FL 32826-3276
FOB: Destination
W906ZL
| 0002 |
| POP 12 Months ACA |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 0003 |
| POP 12 Months ACA |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 0004 |
| POP 12 Months ACA |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 1001 |
| 12 Months After Exercise of |
Option (AEO)
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 1002 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 1003 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 1004 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 2001 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 2002 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 2003 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 2004 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 3001 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 3002 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 3003 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 3004 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 4001 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 4002 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 4003 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
| 4004 |
| 12 Months AEO |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
FOB: Destination
W906ZL
Section I – Contract Clauses
CLAUSES INCORPORATED BY FULL TEXT
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 60 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 60 months.
(End of Clause)
CONTRACT CLAUSES
All clauses from basic contract W900KK-XX-D-XXXX apply to this order and its cognizant contract type.
Section J – List of Documents, Exhibits and Other Attachments
| Attachment 01 | CTIA Statement of Work SOW-2018-008 |
| Attachment 02 | CTIA Contract Data Requirements List |
File details come from the government source that posted it. Updated .