B08 Att. 0033 FBGA QA_Round1.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
EAGLE Ft. Benning, GA W519TC-26-R-A041
Solicitation number
W519TC26RA041
Issued by

About this file

This is a Questions and Answers (Q&A) document from Round 1 of the Federal Acquisition Regulation (FAR) process for the EAGLE Ft. Benning, GA solicitation (W519TC-26-R-A041). The document addresses 110 questions submitted by potential offerors regarding the maintenance, supply, and transportation services contract at Fort Benning, Georgia. Key clarifications include: the Government confirmed it has updated to the most current Collective Bargaining Agreement (CBA) rates in Attachment 0008; revised the solicitation number from W519TC-26-R-0008 to W519TC-26-R-A041 with corrected versions of Attachments 0003, 0004, and 0011 to be provided with Amendment 0001; and confirmed the Period of Performance with a Notice to Proceed (NTP) of November 26, 2026, will not be shortened or re-competed under LOGCAP VI. The Government clarified that escalation factors for exempt employees should be 3.0% year-over-year per RFP Section L.5.4.2.12(a)(4), and confirmed the Average Annual Dollar Values for Maintenance, Supply, and Transportation are accurate and reflective of current operations.

The Q&A document provides extensive technical guidance on proposal submission requirements, including eCRAFT Labor Build Workbook (Attachments 0031 and 0032) submission instructions to be revised in Amendment 0001; confirmation that offerors are not required to complete Section B of the SF 33 with unit prices; and clarification that the eCRAFT submission is mandatory for reporting purposes only and will not be evaluated. Significant workload clarifications address driver support requirements (highly dependent on mission requirements encompassing bus and heavy truck drivers), shift work hours for Fleet Management and CIIP operations, and confirmation that only one Central Issue Facility (CIF) operates at the location. The Government confirmed no DD 254 security clearance requirements exist for this solicitation, no extensions to the August 12, 2026, 12:00 PM CDT proposal deadline will be granted, and Questions and Answers will be released with Amendment 0001.

View the file

Other files

File Type Posted
B08 W519TC26RA041 thru Amd 0003.pdf PDF
B08 Att 0011 Contract References Spreadsheet (17AUG2026).xlsx XLSX spreadsheet
B08 W519TC26RA041 Amd 0003 SF 30.pdf PDF
B08 Att 0002 Staffing and Labor Mix FT Benning GA 8-14-26.xlsx XLSX spreadsheet
B08 W519TC26RA041 Amd 0002 SF 30.pdf PDF
B08 W519TC26RA041 thru Amd 0002.pdf PDF
W519TC26RA041 Amd 0001 SF 30.pdf PDF
W519TC26RA041 Conformed thru 0001.pdf PDF
B08 Att 0003 Performance Questionnaire.pdf PDF
B08 Att 0005 Cost Price Matrix 28JUL2026.xlsx XLSX spreadsheet
B08 Att 0002 Staffing and Labor Mix FT Benning GA 7-16-26.xlsx XLSX spreadsheet
B08 Att 0031 - eCRAFT_Labor Build Workbook_28JUL2026.xlsx XLSX spreadsheet
B08 Att 0001 FBGA-Performance Work Statement (PWS) 7-16-26.pdf PDF
B08 Att 0004 Letter of Consent.pdf PDF
B08 Att 0011 Contract References Spreadsheet (28JUL2026).xlsx XLSX spreadsheet
B08 Att 0030 VHA Appendix (Access Control Area) 7-16-26.docx DOCX document
B08 Att 0002 Staffing and Labor Mix FBGA.xlsx XLSX spreadsheet
B08 Att 0026 FBGA-PWS Annex C Transportation PRS.docx DOCX document
B08 Att 0007 FBGA SCA WD 2015-4527 Rev 32.pdf PDF
B08 Att 0001 FBGA-Performance Work Statement (PWS).pdf PDF
B08 Att 0013 Mission Essetintial Contractor Services_Functions-FBGA.pdf PDF
B08 Att 0010 Blocked File Extensions.pdf PDF
B08 Att 0027 PWS Annex D Environmental Requirements_FBGA.docx DOCX document
W519TC26RA041 Final.pdf PDF
B08 Att 0028 PWS Annex E Definitions Acronyms and Abbreviations.docx DOCX document
B08 Att 0006 SF1408 Preaward Survey of Contractor Acc System.pdf PDF
B08 Att 0032 - eCRAFT Labor Rate Workbook_MAY2026.xlsx XLSX spreadsheet
B08 Att 0009 Purchasing Invoicing Guide (PIG).pdf PDF
B08 Att 0015 Subcontractor Cost Information Submission.pdf PDF
B08 Att 0026 FBGA-PWS Annex C Transportation PRS.docx DOCX document
B08 Att 0011 Contract References Spreadsheet (27MAY2026).xlsx XLSX spreadsheet
B08 Att 0029 PWS Annex F Publications and Forms.docx DOCX document
B08 Att 0025 FBGA-PWS Annex B - Supply PRS.docx DOCX document
B08 Att 0003 Performance Questionnaire.pdf PDF
B08 Att 0031 - eCRAFT_Labor Build Workbook_23JUN2026.xlsx XLSX spreadsheet
B08 Att 0005 Cost Price Matrix 24JUN2026.xlsx XLSX spreadsheet
B08 Att 0002 Staffing and Labor Mix FBGA.xlsx XLSX spreadsheet
B08 Att 0004 Letter of Consent.pdf PDF
B08 Att 0014 Small Business Participation Plan.docx DOCX document
B08 Att 0030 VHA_Non-ASC Requirement- Appendix.docx DOCX document
B08 Att 0024 FBGA-PWS Annex A - Maintenance PRS.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ready to be Posted

Question #Question Reference (RFP #, PWS #, etc.)QuestionAnswer
1B08 Attch 0008 FBGA CBAs 2025-2028 and B08 Att 0016 CBA-SCA Crosswalk Ft Benning GAThe labor rates contained in B08 Att 0016 CBA-SCA Crosswalk Ft Benning GA file are not consistent with labor rates in B08 Attch 0008 FBGA CBAs 2025-2028. The Appendix A Wages section of both CBAs appears to have the most recent rates.
QUESTION: Will the USG update the Crosswalk document?The USG has updated to the most current CBA.
2B08 Att 0003 Performance Questionnaire, B08 Att 0004 Letter of Consent, B08 Att 0011 Contract References Spreadsheet (27MAY2026)The Fort Benning solicitation number is W519TC-26-R-A041. However, the following attachments list incorrect solicitation numbers:

B08 Att 0003 Performance Questionnaire cites W519TC-26-R-0008.

B08 Att 0004 Letter of Consent cites W519TC-26-R-0008.

B08 Att 0011 Contract References Spreadsheet (27MAY2026) cites W519TC-23-R-0022.

QUESTION: Will the USG rerelease these files with the proper solicitation number, or should bidders use these files as is (with the incorrect solicitation numbers)?The USG revised the Solicitation number from W519TC-26-R-0008 to the current W519TC-26-R-A041. Any reference to W519TC-26-R-0008 is in reference to the Ft. Benning, GA Solicitation. Revised versions of these files will be provided with Amendment 0001.
3RFP Section L.5.1.12.1, p. 96RFP Section L.5.1.12.1 states: "Offerors shall complete the eCRAFT_Labor Build Workbook, Section J attachment

0031 of the solicitation." The RFP also states: "The eCRAFT_Labor Rate Workbook, Section J - attachment 0032, is also required to create the Labor Cost Baseline, for each eCRAFT labor category proposed in support of the eCRAFT platform and its corresponding metrics." This implies that two eCRAFT documents are required with the bidder's submission. However, Section L.1.12.1(a) only provides submission instructions for a single item.

QUESTION: To allow bidders to submit both eCRAFT Attachments (Attachments 0031 and 0032), will the USG provide submission and file-naming guidance covering both eCRAFT items?Yes. Section L.5.1.12 instructions will be revised in Amendment 0001.
4Attach 0031 eCRAFT Labor Rate Workbook_23JUN2026 InstructionsThe instructions in Attach 0031, MS Excel file, Column J, Direct Cost indicates: "Each hourly direct labor rate is pulled or referenced from a separate 'Direct Labor Rate Sheet.'"
QUESTION: Based on the example provide in the Fully Loaded Labor Rate Build worksheet, should the instructions for completing Column J be changed to read, "Each hourly direct labor rate for the prime contractor and fully burdened rates, including fee for subcontractors, is pulled or referenced from a separate 'Direct Labor Rate Sheet'"?Attachment 0031 is a HQ ACC document and will not be revised at this time. The figures in Attachment 0031 are provided as an example to show Offeror's how the USG is requesting they provide a Fully Loaded Labor Rate with calculations.
5Attach 0031 eCRAFT Labor Rate Workbook_23JUN2026 Instructions and RFP Sections L.5.4.2.12 (a) (4),L.5.4.2.12 (a) (2)The Attach 0031 FLLRB Workbook includes, under worksheet "Direct Labor Rate Sheet," escalation rates in Row 1 of 1.50% (Option Year 1), 1.75% (Option Year 2), 2.00% (Option Year 3), and 1.25% (Option Year 4). These rates are inconsistent with the RFP guidance to apply 3.0% year to year for Exempt positions, as addressed under Section L.5.4.2.12 (a) (4).

QUESTION: Should bidders replace the escalation factors in the Direct Labor Rate Sheet with 3.0% applied for Exempt employees?

Yes.
6Attach 0031 eCRAFT Labor Rate Workbook_23JUN2026 Instructions and RFP Sections L.5.4.2.12 (a) (4),L.5.4.2.12 (a) (2)The Attach 0031 FLLRB Workbook includes, under worksheet "Direct Labor Rate Sheet," escalation rates in Row 1 of 1.50% (Option Year 1), 1.75% (Option Year 2), 2.00% (Option Year 3), and 1.25% (Option Year 4). These rates are inconsistent with the RFP guidance to apply 3.0% year to year for Exempt positions, as addressed under Section L.5.4.2.12 (a) (4).
QUESTION: Would escalation calculations for subcontractor rates be from fully burdened rates, including fee obtained from subcontractors, instead of calculated in the Direct Labor Rate table?Escalation factors are provided as an example in Attachment 0031 and should be factored in the same way that Offeror's apply it to their specific cost proposal IAW Section L of the RFP.
7Attach 0031 eCRAFT Labor Rate Workbook_23JUN2026 Instructions & RFP Sections L.5.4.2.12 (a) (4),L.5.4.2.12 (a) (2)The Attach 0031 FLLRB Workbook includes, under worksheet "Direct Labor Rate Sheet," escalation rates in Row 1 of 1.50% (Option Year 1), 1.75% (Option Year 2), 2.00% (Option Year 3), and 1.25% (Option Year 4). These rates are inconsistent with the RFP guidance to apply 3.0% year to year for Exempt positions, as addressed under Section L.5.4.2.12 (a) (4).
QUESTION: Would the USG please address how bidders are to show rates/escalation factors for non-exempt CBA/SCA positions per the guidance in SectionL.5.4.2.12 (a) (2)?Escalation factors are provided as an example in Attachment 0031 and should be factored in the same way that Offeror's apply it to their specific cost proposal IAW Section L of the RFP.
8Attach 0031 eCRAFT Labor Build Workbook 23JUN2026Under the tab labeled, "Indirect Rate Sheet," in the Attach 0031 eCRAFT Labor Build Workbook 23JUN2026, a single input is required for Fringe rates.
QUESTION: Are bidders permitted to add rows to this template if more than one Fringe rate is part of a company's bid structure, and then modify the Fully Loaded Labor Rate sheet columns/formulas to adapt to the additional Fringe burden pool?Yes, however Offerors shall ensure they have the correct Fringe % attached to the specific LCAT/Crosswalk position when calculating the Fully Loaded Labor Rate.
9Attach 0031 eCRAFT Labor Build Workbook 23JUN2027RFP Section C.5 includes the requirement for identification of proposed fee rates in two buckets: (1) # % for all work self- performed and (2) # % for subcontract work. Under the Attach 0031 eCRAFT Labor Build Workbook 23JUN2026, the tab labeled "Indirect Rate Sheet" is limited to only a single entry for "Fee Rate."
QUESTION: Will the USG update the "Indirect Rate Sheet" to allow multiple fee rates?Yes, however Offerors shall ensure they have the correct fee attached to the specific LCAT/Crosswalk position when calculating the Fully Loaded Labor Rate.
10RFP Section B- Supplies or Services and Prices or CostSection L requirements do not indicate that RFP Section B be completed with unit price and amounts for each line item. QUESTION: Are bidders to complete Section B as part of their strict compliance proposal response?Bidders are not required to complete Section B per section A.10 of the RFP.
11B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Transportation CLIN 0005QA (WHINSEC Driver/Facility Support) lists Driver Support.
Will the Government specify what type of driver support is required (Bus/Mini-Van/Heavy Truck Driver)? Additionally can the Government provide the estimated time factor to complete each mission?USG has determined depending on mission requirements it can be any of the listed (Bus or Heavy Truck Driver). Driver must be qualified to operate as required. The USG can not give a specific estimated time for each mission as there are many factors like weather, mission, and troop readiness that impact time.
12B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Transportation CLIN 0005PA (Assessions CMD/6th BDE ROTC) lists Driver Support.
Will the Government specify what type of driver support is required (Bus/Mini-Van/Heavy Truck Driver)? Additionally can the Government provide the estimated time factor to complete each mission?USG has determined depending on mission requirements it can be any of the listed (Bus or Heavy Truck Driver). Driver must be qualified to operate as required. The USG can not give a specific estimated time for each mission as there are many factors like weather, mission, and troop readiness that impact time.
13B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Transportation CLIN 0005NA (75th Ranger Driver/Facility Support) lists Driver Support.
Will the Government specify what type of driver support is required (Bus/Mini-Van/Heavy Truck Driver)? Additionally can the Government provide the estimated time factor to complete each mission?USG has determined depending on mission requirements it can be any of the listed (Bus or Heavy Truck Driver). Driver must be qualified to operate as required. The USG can not give a specific estimated time for each mission as there are many factors like weather, mission, and troop readiness that impact time.
14B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Transportation CLIN 0005MA (ARTB Driver/Facility Support) lists Driver Support (Ranger Competition).
Will the Government specify what type of driver support is required (Bus/Mini-Van/Heavy Truck Driver)? Additionally can the Government provide the estimated time factor to complete each mission?USG has determined depending on mission requirements it can be any of the listed (Bus or Heavy Truck Driver). Driver must be qualified to operate as required. The USG can not give a specific estimated time for each mission as there are many factors like weather, mission, and troop readiness that impact time.
15B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Transportation CLIN 0005LA (1st SFAB Driver /Facility Support) lists Driver Support.
Will the Government specify what type of driver support is required (Bus/Mini-Van/Heavy Truck Driver)? Additionally can the Government provide the estimated time factor to complete each mission?USG has determined depending on mission requirements it can be any of the listed (Bus or Heavy Truck Driver). Driver must be qualified to operate as required. The USG can not give a specific estimated time for each mission as there are many factors like weather, mission, and troop readiness that impact time.
16B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Transportation CLIN 0005AA (ISR 307 Fleet Management)
We understand that Fort Benning has two Transportation Motor Pools. Does the staffing in this CLIN cover the staffing required by both Motor Pools, or is this staffing one Motor Pool?The workload identified in CLIN 0005AA is staffing hrs for both motorpools
17B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Supply CLIN 0004HA (MCoE). Line states Vehicle Holding Area Guard (Parking and Lot Attendant).
Is the Government looking for Guards or Parking and Lot Attendants? Please clarify what is required.The USG does not have Guard under any EAGLE taskorders.. The requirement is for a Parking and Lot Attendant. Support for Supply CLIN 0004HA
18B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Supply CLIN 0004EA (CIIP Phase I). There is no workload provided for uniform adjustments or sewing. PWS para 5.16.1 states Contractor shall provide support (including Special Measurement Items), alterration, exchange, repair, modification.

Does Fort Benning's CIIP require tailor services? If it does, please provide workload. The USG has revised the TD-02 to identify CIIP Tailors Workload:

19 B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025 Supply Section. Outside of CIIP, do any other sections require shift work?

If shiftwork is required, will the Government please provide the percentage or workload for staffing shift work?CIIP is the only supply section requiring shift-work.
20B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Supply CLIN 004GA (Bulk Fuel). Does this section require Fuel Distribution System Operators (FDSO)?

Workload provided does specify if FDSO and/or Truck Drivers are required. Will the Government please provide clarification? Fuel Distribution Operators are required, they handle the accounting requirements.

The Truck drivers are also required; they perform refueling operations at Lawson Airfield.

21 B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025 Transporation: CLIN 0005AA (Fleet Management). Are any of the drivers on shift (2nd or 3rd)?

If so, please let bidders know how many personnel are on shift as the CBA requires shift differential.The USG does not reference FTE's, but in Hrs of required support. 2nd Shift 98,280hrs / 3rd Shift 96,460hrs
22B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025
B08 Att 0001 FBGA-Performance Work Statement (PWS)Supply: CLIN 0004AA and PWS Para 5.0. TD-02 has workload for the Hazardous Material operations, but the PWS shows paragraph 5.20 - Hazardous Material Control Point as Reserved.
Are bidders performing Hazardous material operations as part of PWS para 5.20? If so, would the Government provide PWS information for PWS 5.20?The LRC does not have a HMCP, and we do not run the HMCP. HMCP at FT Benning is manage by the Installation DPW Environment Division. This requirement is to support the LRC internal operations.
23B08 Att 0002 Staffing and Labor Mix FBGAThe Total under the PMO is labeled: Total Maintenance FTE's.
Will the Government correct the PMO title to "Total PMO FTE's".Revised Staffing and Labor Mix to reflect Total PMO FTE's
24B08 Att 0002 Staffing and Labor Mix FBGA
B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025On Attachment 0002, PMO section, CLIN0002JA, refers to Non-ASC CCEP, as does Att0005. However TD-02 Maintenance CLIN 0003KA does not refer CCEP as Non-ASC.
Is the CCEP Non-ASC? If it is, please update TD-02 to map to Att0002 and Att0005.The CCEP is NON-ASC. The Government has provided adequate information for this reference. Please refer back to the source documents and propose to the workload provided
25B08 Att 0001 FBGA-Performance Work Statement (PWS)Is there a DD254 associated with this RFP? PWS para 1.5 refers to DD254.
Could the Government provide which employees require a SECRET clearance. Please provide a DD254 if it is required with the Fort Benning bid.There is no DD254 requirement for this solicitation.
26B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Supply: CLIN 0004EA (CIIP - Night Issue).
By the CBA, is the Night Issue considered 2nd Shift, or 3rd Shift? The pay differential depending on which shift is important for Bidder's pricing.Night issue is reflected as 3rd shift -2000-0430
27W519TC-26-R-A041-Solicitation PDFThe current file is password protected. Is it possible to receive an unlocked version of the file?The solicitation is password protected based on the security settings of the new Army Contract Writing System. An unlocked version will not be provided.
28B08 Att 0020 TD-04 FBGA_Hours of Operation 14 Mar 25The Hours of Operations worksheet shows hours for Mata Weapons and Electronics, and Mizener Sustainment Maintenance Complex - Shops A,B,C.
The TD-02 for Maintenance does not display the breakout for Mata and Mizener for bidders to determine staffing to cover those area. Will the Government provide Mata and Mizener staffing?Hours of operation are identified in the TD-04 from 0800-1630 The USG will not provide specific Manning for those locations. Please refer to the historical hours provided in the TD-02. Weapons, Optics, and Communication equipment is located at MATA. All other equipment will be maintained at the Mizener complex.
29B08 Att 0020 TD-04 FBGA_Hours of Operation 14 Mar 25CIF has a note that there might be 2 by FOC date.
Does the Government anticipate the current CIF staffing to cover 2, or will the Government modify the contract to add more personnel for a second CIF?There is only one CIF the TD-02 is correctly reflected. Please propose to the workload provided.
30B08 Att 0020 TD-04 FBGA_Hours of Operation 14 Mar 25TMP mentions Main Post and San Hill TIMPs.

How many personnel are in each TMP? The Government manages this requirement on a performance-based basis. The overall FTE estimates provided in TD-02 are based on the historical hours of operation and mission requirements across both Transportation Motor Pool (TMP) locations.

The Government will not prescribe a specific headcount or personnel-per-shift requirement for each location. It is the responsibility of the Contractor to analyze the overall hours of support baseline, location hours of operation, and mission parameters to propose an optimized, compliant, and efficient staffing and shift-allocation model that ensures full coverage at both locations.

31 B08 Att 0020 TD-04 FBGA_Hours of Operation 14 Mar 25 TMP - Main Post Dispatching (Mon-Sun) 000-2400

TD-02 workload for fleet management dispatching does not reflect 24/7 operations. Will the Government provide bidders how many personnel are on 2nd and 3rd shift for differential pay?The USG does not reference FTE's, but in Hrs of required support. Each shift has 3 separate locations.1st shift 5,640 hrs / 2nd Shift 5,640hrs / 3rd Shift 3,640hrs.
32B08 Att 0020 TD-04 FBGA_Hours of Operation 14 Mar 25Ranger Camp Merrill, Dahlonega, GA and Ranger Camp Rudder, Eglin AFB, FL are shown.
TD-02 did not show workload for the Ranger Camps. Is staffing required at both locations? If yes, please provide workload.Workload is part of the Transportation requirement under CLIN0005AA
33B08 Att 0020 TD-04 FBGA_Hours of Operation 14 Mar 25ASP Vehicle Holding Area (Monday thru Sunday) - 000-2400
TD-02 did not show workload for the ASP Vehicle Holding Area. Are bidders expected to provide guards for the Vehicle Holding Area? If yes, please provide workload.The USG does not have Guard under any EAGLE taskorders.. The requirement is for a Parking and Lot Attendant. Support for Supply CLIN 0004HA
34SolicitationWould the Government extend the proposal submission date once Answers are provided to allow bidders sufficient time to react?The Proposal submission due date will not be extended at this time.
35Attachment 0018; Maintenance CLIN 3KA CCEPThis workload has manhours that total approximately 120 C&E and Armorer Full-Time Equivalents (FTEs). Will the Government please confirm the Column E manhours?The USG confirms the information provided in the TD-02 is what the offerors need to propose to.
36Attachment 0018; Maintenance Indirect TabThe 113,316 number at the bottom of Column D doesn't seem to represent anything in particular. Will the Government please clarify what this number represents and/or provide an update to it if/as required?It represents a total for all CLINS combined Indirect Maintenance labor
37Attachment 0018; Maintenance Indirect TabAll Maintenance Indirect Tab CLINs list "tool toom transactions" and all except CLIN 3AA also list "(1 tool room)" afterward. Does CLIN 3AA have a tool room and which CLINs listing a tool room are the same tool room?The USG confirms there is only 1 tool room located at the Mizner complex. There is not a tool room at the CCEP or the MATA. All required tool at CCEP and the MATA are maintained at individual workstations.
38Attachment 0008

Attachment 0018

Attachment 0020There are 2nd and 3rd shift hours in the TD-04 and Collective Bargaining Agreement (CBA); however, the TD-02 workload data nor anywhere else in the solicitation provide any shift-specific workload requirement data (except for the CIIP 3rd shift) making it impossible to provide an accurate by-shift technical or cost staffing solution. Will the Government please provide the TD-02 workload data breakout by shift requirements in all workcenters where shift work is required?There are no 2nd shifts listed in the TD-04 the USG identifies shift work in the CIIP 1st and 3rd shifts with associated hours. The CBA does not identify any workload or requirements on this solicitation. Workload is provided on the TD-02 Only. Attachment 0018, TD-02 The Government has provided adequate information for this reference. Please refer back to the source document and propose to the workload provided
39Attachment 0001; Page 60; Paragraph 5.29.4
Attachment 0018PWS Paragraph 5.29.4 states the contractor shall provide driver support to transport personnel, cargo, and/or correspondence and will use the minimum size vehicle suitable for a particular mission. The TD-02 Fleet Management CLIN 5AA nor anywhere else in the solicitation, however, provides any specific individual workload breakdown in terms of personnel, cargo, and/or correspondence driver support, making it impossible to provide an accurate number of driver labor category types. Will the Government please provide the TD-02 workload data requirement breakout by driver or vehicle type?The Government has determined that required driver support is highly dependent on varying mission requirements. Consequently, the required labor category may encompass any of the driver types listed in the Service Contract Act (SCA) directory / labor categories, to include Bus Driver or Heavy Truck Driver.

The Contractor is responsible for providing personnel who are fully qualified, licensed, and certified to operate the minimum size vehicle suitable for each specific mission as it arises. Offerors should propose a flexible staffing approach capable of meeting these diverse operational transport needs.

40Attachment 0001; Page 60; Paragraph 5.29.4
Attachment 0018PWS Paragraph 5.29.4 states the contractor shall provide driver support to transport personnel, cargo, and/or correspondence and will use the minimum size vehicle suitable for a particular mission. The TD-02 CLINs 5LA, 5MA, 5NA, 5PA, and 5QA only state a requirement for "driver support," but nowhere else in the RFP is there any specific type of driver support identified, making it impossible to provide an accurate number of driver labor category types. Will the Government please provide the TD-02 workload data requirement breakout by driver or vehicle type mission for these requirements?The Government has determined that required driver support is highly dependent on varying mission requirements. Consequently, the required labor category may encompass any of the driver types listed in the Service Contract Act (SCA) directory / labor categories, to include Bus Driver or Heavy Truck Driver.

The Contractor is responsible for providing personnel who are fully qualified, licensed, and certified to operate the minimum size vehicle suitable for each specific mission as it arises. Offerors should propose a flexible staffing approach capable of meeting these diverse operational transport needs.

41Attachment 0001; Page 53; Paragraph 5.21PWS Paragraph 5.21 references TD-11; however, there is no TD-11 provided in the solicitation. Will the Government please provide the TD-11?USG Reserved PWS 5.21.2 TD-11 requirement reference.
42Attachment 0001; Page 57; Paragraph 5.27PWS Paragraph 5.27 states: "100% of Army Branch of Service shipments must be inspected either physically or virtually to ensure HHG industry compliance, with a minimum of 75% of Army Personal Property Shipments inspected in-person. This includes Soldier and Department of the Army Civilian (DAC) shipments. A minimum of 50% of other Branch of Service (non-Army) Personal Property Shipments must be inspected in-person, IAW the DTR." Since the normal standard is 50% shipment inspection with telephonic allowed, will the Government please confirm that the "in-person" requirement is 75% of Army shipments and 50% of non-Army shipments?The USG has Revised PWS updating 5.27.8 to reflect updated requirement.
43Attachment 0018; CLIN 5AAThe Troop Lift Support requirement has 115 PAX Lift capability at 77% utilization = 88.55 operational PAX Lift. Each vehicle requirement is 2,880 hours per year. Using a maximum of 1,820 productive hours (2,080 - 104 Holiday - 56 Sick - 100 Vacation Average), this comes to 140 FTE alone which is more than the total estimated annual hours for the entire Fleet Management workload data, and doesn't account for the other six (6) rows of workload requirements. Will the Government please review CLIN 5AA's workload and provide updated data accordingly?USG has provided the hrs of required support in the TD-02 productive hrs of lift support at 232,960
44Attachment 0001; Page 53; Paragraph 5.21Is there any fuel requirement at Camp Rudder, and if so, will the Government please define this requirement?There is no fuel requirement at this location
45Attachment 0001; Page 48; Paragraph 5.16Is there any sewing requireing in the CIIP, and if so, which shifts?Tailors preform alterations and sewing- regular hours 0800-1630
46Attachment 0026 - Transportation PRSIt appears the Transportation PRS is missing and is listed as a deleted attachment. Would the Government please provide this attachment or clarify the purpose of the deletion?Attachment 0026 - Transportation PRS is attached to the Contract Opportunity in SAM.gov
47B08 Att 0008 FBGA CBAs 2025-2028
Will the Government confirm that no amendments, MOUs, or other more current CBA documents are in the possession of the incumbent contractor or the Union that should be included as part of this solicitation to ensure all offerors are using the most current CBA rates?The USG has updated to the most current CBA. There are no amendments or MOUs.
48RFP and AttachmentsThere appears to be a conflict in the solicitation number. W519TC-26-R-A041 is listed on page 1 of the SF33 and elsewhere in the RFP and on Attachments 0001 & 0009, but W519TC-26-R-0008 is also listed in the RFP, and W519TC-26-R-0008 is noted on Attachments 0003 & 0004. W519TC-23-R-0022 is noted on Attachment 0011. Would the Government please review the RFP and all attachments to ensure the appropriate solicitation number is uniformly annotated?The USG revised the Solicitation number from W519TC-26-R-0008 to the current W519TC-26-R-A041. Any reference to W519TC-26-R-0008 is in reference to the Ft. Benning, GA Solicitation. Revised versions of these files will be provided with Amendment 0001.
49B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025Would the Government please confirm that the workload data provided in this RFP reflects the current operational status?Attachment 0018, TD-02 The Government has provided adequate information for this reference. Please refer back to the source document and propose to the workload provided
50RFP, M.5.2.8(c)(2)The Average Annual Dollar Values (AADV) listed in M.5.2.8.c appear to be higher than the annual spend profiles. Please confirm that the amounts listed for Maintenance, Supply, and Transportation are accurate and reflect current operations?The USG confirms that the Average Annual Dollar Value amounts listed in M.5.2.8.c for Maintenance, Supply, and Transportation are accurate and reflect current operations
51RFP, M.5.2.8(c)(2)The AADVs listed in M.5.2.8.c appear to be higher than the annual spend profiles. Will the Government please consider adjusting the AADVs to reflect $9M for Maintenance, $7M for Supply and $5M for Transportation to increase competition and ensure the Government is receiving competitive fair and reasonable pricing IAW the actual annual spend profiles?The Average Annual Dollar Value amounts listed for Maintenance, Supply, and Transportation are accurate and reflect current operations
52RFP, L.5.4; M.5.3Will the Government please provide the lengths of service for the incumbent workforce at Ft. Benning so all Offerors can properly estimate Vacation costs in their fringe costs?This information is not available to be shared with Offerors at this time.
53RFP, L.5.4; M.5.3Will the Government please provide the H&W demographics for the incumbent workforce at Ft. Benning so all Offerors can properly estimate benefit plan costs in their fringe costs?This information is not available to be shared with Offerors at this time.
54RFP, A.4; L.2.8Would the Government please confirm that the Period of Performance stated in the RFP, with a NTP of 26 November 2026, will be executed and not shortened and re-competed under LOGCAP VI?.Confirm.
55Attachment 0002, Line 35Line 35 states Total Maintenance FTEs; however, this should be Total PMO FTEs. Would the Government please correct Attachment 0002?Revised Staffing and Labor Mix to reflect Total PMO FTE's
56RFP, L.5.1.2(a)Would the Government please confirm that offerors only need to submit one copy of each SF30 issued for this RFP?Confirm.
57RFP, L.5.1.12L.5.1.12 requires an eCRAFT submission. However, in the recent EAGLE Bragg solicitation, all eCRAFT references, instructions, and proposal submission requirements related to eCRAFT were removed from Section L in its entirety. It was also clarified that eCRAFT requirements would be required at the time of award. The awardee would be required to a completed eCRAFT Labor Rate Workbook with the appropriate eCRAFT labor categories, and provide fully loaded labor rates for all contractor labor categories correlated to the appropriate eCRAFT labor categories, consistent with the fully loaded rates awarded by the
Government. Would the Government please remove the e-CRAFT requirement from this solicitation?Per RFP Section A.28, "The Army Contracting Command (ACC) is in the process of deploying the Electronic Cost Reporting and Financial Tracking (eCRAFT) Enterprise tool (E2) to all ACC organizations. E2 is a tool designed to enhance cost reporting and financial tracking utilizing standardized labor categories, authoritative data, and automated reports. E2 is expected to be deployed in Fiscal Year 2026 and its utilization is required for service contracts/orders that contain Cost type Contract Line Item Numbers (CLINs). Offeror(s) are required to provide the information listed within Section L of this solicitation."
58B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025The Supply workload for CLIN4BA, ASP, notes Line for all workload data. Would the Government please confirm that is the appropriate unit of measure for all workload data for the ASP?Attachment 0018, TD-02 The Government has provided adequate information for this reference. Please refer back to the source document and propose to the workload provided . The Unit of measure is accurate.
59B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025The Transportation workload, CLINs 5LA - 5QA simply notes driver support. PWS 5.29.4 only notes to "use the minimum size vehicle suitable for a particular mission IAW AR 58-1." Without more detail than "driver support," offerors have no reference to determine the minimum size vehicle (light, medium, heavy) required for support. Would the Government please clarify this driver support requirement so offerors other than the incumbent can adequately propose staffing?The Government has determined that required driver support is highly dependent on varying mission requirements. Consequently, the required labor category may encompass any of the driver types listed in the Service Contract Act (SCA) directory / labor categories, to include Bus Driver or Heavy Truck Driver.
60B08 Att 0018 FBGA-TD-02 Workload Data and Density List - Dec 1 2025The Transportation workload for CLIN 5KA, Line 90, notes 1-5 busses per transaction. Does the bus driver requirement apply to this whole CLIN?Yes, This CLIN is a Non-ASC driver support requirement
61B08 Att 0020 TD-04 FBGA_Hours of Operation 14 Mar 25Attachment 0020, TD-04, notes "Central Issue Facilities (Note: There might be 2 by FOC date)." Would the Government clarify this statement and confirm the TD-02 reflect the appropriate workload?The USG is only operating one CIF propose to the workload identified in the TD-02. The TD-02 workload is correctly reflected. TD-04 revised to remove note
62B08 Att 0001 FBGA-Performance Work Statement (PWS)With the exception of the cover page, each page of the PWS contains the header, "INSERT INSTALLATION NAME AND STATE," suggesting that the document is a standardized EAGLE base PWS. As a result, certain PWS requirements may not directly align with the installation-specific workload reflected in TD-02. Please clarify whether offerors should base their staffing primarily on the TD-02 workload data, on all PWS requirements regardless of whether associated workload is reflected in TD-02, or on a combination of both. If the latter, please identify how offerors should account for PWS-required activities that are not represented in the workload data.The USG has Revised PWS updating to reflect updated page header.
63Attch 0002Should the text that reads "Total Maintenance FTEs" read "Total PMO FTEs"?Revised Staffing and Labor Mix to reflect Total PMO FTE's
64Attch 0001Pages 43 thru 63 are blank, please address.Pages 43 through 63 of the PWS contain text in the version downloaded from SAM.gov. Please contact the Contract Specialist directly if any document access issues exist on your end.
65Attch 0018FBGA-TD02 Workload Data and Density List is locked, please address.Confirm that this document is not locked. Please contact the Contract Specialist directly if any document access issues exist on your end.
66W519TC26RA041 Final, Section M.5.2.8The AADV for Transportation is identified as $12 million annually. Our experience with comparable programs indicates that transportation services are typically funded at lower levels, and we are not aware of similar prime contractor programs with annual transportation requirements approaching this magnitude. Will the Government please consider reviewing and, if appropriate, revising the Transportation AADV downward if the current estimate is determined to exceed the anticipated recurring transportation requirements?The Average Annual Dollar Value amounts listed for Transportation are accurate and reflect current operations
67W519TC26RA041 FinalWill the Government please consider extending the proposal submission due date and due date for industry questions commensurate with the delay in providing Offerors with the updated PWS and TD-02 attachments?The Proposal submission due date will not be extended at this time.
68N/AThe last month / year of the applicable CBA wage rates is January 2028; however, the period of performance of the Program extends beyond this. Are Offerors to revert to using the AWD in January 2029, or should Offerors continue to use the January 2028 wage rates for the remainder of the PoP?Per Section L.5.4.2.12(a)(2), Offerors will continue to use the last applicable rate(s) in force (without escalating) for the remainder of the period of performance.
69N/AWill the Government please require all bidders to bid using applicable CBA rates only. This will ensure a discrete and fair, realistic technical solution using the incumbent CBA labor categories and not leave ambiguity in performance and mitigates risk of unreasonably low prices if vendors bid SCA where there is ambiguity between CBA and SCA positions?Offerors are required to defer to SCA rates when the applicable CBA does not cover a specific non-exempt labor category.
70Copy of B08 Att 0031 - eCRAFT_Labor Build Workbook_23JUN2026Column D is not Government or Contractor site, it is a duplicate drop down of Column C. Will the Government please adjust?Attachment 0031 will be updated with Amendment 0001.
71Attachment 0005NOTE: CLIN 0002 (second tab labled "Allocation" does not match the CLIN structure in the RFP starting on page 7. Please provide explanation which is correct and how pricing should be formatted since the spreadsheet states "PMO allocation to be applied at award by the Government", but the CLIN structure in the RFP has each of the CLINs to be populated with pricing. Are offerors not to populate this in the CLIN structure?Offerors are not requested to provide prices in the SF 33. Propose as solicited in the Section L instructions.
72RFP Page 7-19For the above mentioned CLIN structure in the RFP, CLINs are not separated by POP year. shall offerors fill in the total across the whole period of performance for each of the CLINs, or just Base Year since that matches the CLIN numbers of Base Year in the CLIN structure?Offerors are not requested to provide prices in the SF 33. Propose as solicited in the Section L instructions.
73RFP Page 19CLIN 0010 is listed as 'NSP' within the "Allocation" tab of B08 Att 005 spreadsheet. Please confirm it should be labled as the same in the RFP CLIN structure.CLIN 0010 in the SF33 is administrative at this time to allow for the attachment of all exhibits.
74Section L.5.1.12 Electronic Cost Reporting & Financial Tracking (eCRAFT)L.5.1.12.1 states that "Offerors shall complete the eCRAFT_Labor Build Workbook, Section J attachment 0031 of the solicitation." Further down in the section is states that "The eCRAFT_Labor Rate Workbook, Section J - attachment 0032, is also required to create the Labor Cost Baseline, for each eCRAFT labor category proposed in support of the eCRAFT platform and its corresponding metrics. The Government provided submittal instructions and only one naming convention. Will the Government provide a second naming convention or clarify how the Attachments should be submitted?Yes. Section L.5.1.12 instructions will be revised in Amendment 0001.
75Paragraph L.5.1.12.1; eCRAFTAre offerors required to use eCRAFT for non-Exempt (SCA) positions?All labor categories under cost-reimbursement type CLINs shall be reported.
76Paragraph L.5.1.12.1; eCRAFTAre offerors required to use eCRAFT for Exempt positions?All labor categories under cost-reimbursement type CLINs shall be reported.
77Paragraph L.5.1.12.1; eCRAFTThe Government states that offerors shall propose Standard eCRAFT Labor Categories; however, it also states: "Offerors may propose an SCA labor category listed in the SCA Directory of Occupations." When proposing SCA labor categories for non-Exempt positions, does the offeror need to also list them, or the closest match to them, from eCRAFT?SCA Codes are applicable to be listed in the eCRAFT submissions. For positions not covered under the SCA, the eCRAFT_Labor Build Workbook provides a crosswalk of all offeror proposed labor categories to corresponding Government Standard eCRAFT Labor Categories and must be completed by the offeror. For labor categories that provide for various skill levels (I, II, III, IV), the Offeror shall select the skill level that best matches (best fit) the proposed individual and company-specific labor category.
78Paragraph L.5.1.12.1; eCRAFTAre the requirements to use eCRAFT exclusively for Exempt company-specific labor category positions the offeror proposes, or if not, will the Government please clarify which proposed positions must be listed from eCRAFT and on the eCRAFT proposal documents?All labor categories under cost-reimbursement type CLINs shall be reported.
79Paragraph L.5.1.12.1; eCRAFTShould the Government require the use of eCRAFT and its corresponding salary wage data with significantly higher wages (Exempt and SCA), will the Government enforce a pricing adjustment on all offerors who do not use it?There are no salary wage data requirements attached to eCRAFT labor categories. Offerors are to input their proposed costs IAW Section L requirements and the instructions in the eCRAFT attachments.
80Paragraph L.5.1.12.1; eCRAFTIs the eCRAFT-related submission requirement mandatory, and if so, for what minimum type labor categories, and would the Government please provide corresponding and specific Section M evaluation criteria definition of it as that seems to be absent?The eCRAFT submission is mandatory with proposal submission. The data provided with these attachments is for reporting purposes only and will not be evaluated.
81Section L.5.4.2.6; page 112Issue: The Government states the CLINs for ODCs are Government provided surrogate numbers, which are inclusive for any Offeror's applicable indirect rate adders. Therefore, the Offeror shall not apply indirect rate adders within its cost/price proposal.
Question: Will the Government please confirm that the provided plug numbers are representative of the current ODC costs incurred by the incumbent?The USG provided those numbers to all offerors as anticipated ODC cost for purposes of solicitation
82Section L.5.4.2.6; page 112Will the Government please confirm that Offeror’s are allowed to utilize the ODC plug number to account for required insurances (Insurance liability to third persons, General Liability, etc.) required by the RFP?
Other Direct Cost CLINs do not allow for the billing of required insurance costs.
83Section L.5.4.2.12(a)(1)-(2); page 114Issue: The Government references Collective Bargaining Agreements (CBAs) and SCA Wage Determinations.

Question: Will the Government please confirm Offeror's are to use Attachment 0008 for estimating wages and benefits for non-exempt, non-CBA positions? "

Attachment 0008 - CBA is not used for estimating wages and benefits for non-exempt, non-CBA positions.
84Section L.5.4.2.12(a); page 114Will the Government please confirm Offerors are required to use the wages and benefits contained in the CBA for estimating purposes through its duration even though a new incumbent would negotiate a new CBA prior to transition?
Per Section L.5.4.2.12(a)(2), Offerors will continue to use the last applicable rate(s) in force (without escalating) for the remainder of the period of performance.
85Section JSection J lists Exhibit M – EC-01 DID eCRAFT DI-SESS-82518_April 2026, but the package provided to offerors does not appear to include it. Please provide Exhibit M or confirm that Exhibit L and Attachments 0031/0032 fully replace Exhibit M.Exhibit M will be provided with Amendment 0001.
86Attachment 0011Section J lists Attachment 0011 – Contract References Spreadsheet dated 23 January 2024, while the file provided is titled '(27MAY2026)'. Please confirm the current Attachment 0011 version and whether offerors must use the provided 27MAY2026 workbook.Confirm. A revised Attachment 0011 will be provided with Amendment 0001.
87Attachment 0002For Attachment 0002 and M.5.1.2(c)(1)(i), please clarify whether FLC1 hours must equal or exceed Attachment 0018 estimated hours by each worksheet, each CLIN, each PWS paragraph, each functional area (Maintenance/Supply/Transportation), or the total task order level.Please propose to the documents provided. The TD-02 hours are estimates provide by the USG as a reference. The RFP explains if the contractor wants to propose less what is required.The USG does not provide minimum hrs.
88Attachment 0018Attachment 0018 contains many workload rows with transaction quantities but blank estimated productive-hour cells. For FLC1 comparison, should offerors include only rows with Government-provided estimated hours, derive hours for blank rows, or provide rationale for transaction-based staffing?For Maint Indirect, Supply and Transportation Tabs the Estimated Productive labor Hrs shown in Col D are representative for the entire CLIN they are shown under.
89Attachment 0018Please clarify whether Attachment 0018 'Estimated Productive Hours' are intended to be direct productive labor hours only, or whether they include paid time such as leave, holidays, training, meetings, safety stand-downs, tool accountability, and administrative time.The TD-02 Att 0018 represents productive hours only.
90Attachment 0026Pending provision of Attachment 0026, please confirm the transportation performance standards, AQLs, surveillance methods, and fee/corrective-action consequences that apply to personal property, fleet management, passenger movement, A/DACG, container yard, rail, and driver support.The USG can confirm Attachment 0026, Identifies the performance standards for transportation requirements identified in the PWS.
91B08 Att 0008 FBGA CBAs 2025-2028Please confirm the Government’s position on successor-contractor obligations for the provided CBAs, including whether all covered work remains subject to the CBAs for the base period/options and how offerors should treat CBA expiration on 31 December 2028 for proposal pricing.For proposal purposes, continue to use the applicable CBA rates.
92Attachment 0018Please explain how the Government will conduct cost realism when proposed FLC1 hours meet Attachment 0018 estimates but indirect/supervisory/PMO hours vary materially among offerors.Cost Realism evaluations will be conducted IAW RFP Section M.
93B08 Att 0014 Small Business Participation PlanPlease confirm that the 39% small-business participation goal and socioeconomic goals are calculated against 'Subtotal Proposed Labor/Fee' in Attachment 0005 Tab 1 cell I23, and whether ODCs, fee, transition, PMO, and cost-no-fee CLINs are excluded or included.Subtotal-Proposed Labor/Fee on Cost Price Matrix Tab 1a IS INCLUSIVE OF Transition, PMO labor, and all other labor and fee values entered on Allocation_Tab_1b. ODC values are excluded.
94RFP Solicitation NumberThree different solicitation numbers appear across the package: W519TC-26-R-A041 (PWS cover), W519TC-26-R-0008 (Attachment 0003 Performance Questionnaire), and W519TC-23-R-0022 (Attachment 0011 Contract References, Line 5). Please confirm W519TC-26-R-A041 governs and either amend Attachments 0003 and 0011 or confirm offerors should insert the correct solicitation number on those attachments.The USG revised the Solicitation number from W519TC-26-R-0008 to the current W519TC-26-R-A041. Any reference to W519TC-26-R-0008 is in reference to the Ft. Benning, GA Solicitation. Revised versions of these files will be provided with Amendment 0001.
95PRS Annex A, Allied Trades headerPlease confirm Allied Trades (PWS 5.4: welding, machining, paint, body, carpentry, load testing) remains within scope.All workload provided in this solicitation is within scope
96Att 0030 VHA Appendix vs PWS/PRS 5.22The VHA appendix cites 'PWS para 5.22 Vehicle Holding Area (VHA),' but PWS/PRS paragraph 5.22 is Ammunition Supply Services; the appendix PRS row is also numbered 5.22.1, duplicating existing ASP PRS rows. Please provide the correct PWS paragraph number for VHA, and confirm which CLIN captures VHA labor (e.g., 0004HA Non-ASC MCoE Supply). Please confirm the 24/7 requirement is a single continuous post capped at 168 hours per week and whether it is a covered post requiring relief coverage during breaks.VHA Gate Guard (Parking and Lot Attendant): This function requires 24/7 coverage, capped at 168 hours per week. It is funded by MCoE (Non-ASC CLIN 0004HA). The workload is accurately captured on the TD-02 as 8,736 hours to reflect the continuous 24/7 requirement.

Regarding site coordination and continuous coverage: Because ammunition is stored on vehicles at the VHA, MCoE provides an armed guard on-site via BMM.

To ensure the post is never unmanned, the VHA attendant coordinates directly with the on-site BMM for coverage during area checks or latrine breaks after hours. (A latrine is available in the adjacent building, and there are typically two CMEs at the location). During standard duty hours, the VHA Guard coordinates directly with their supervisor before leaving the post.

97PWS TOC; PWS 5.15; CLIN 0004DAPWS 5.15.1 contains fragmented sentences indicating volumes 'do not support maintaining a full CIF operation,' yet CLIN 0004DA is titled 'ASC CENTRAL ISSUE FACILITY (CIF)' without the Storefront qualifier. Please confirm the requirement is CIF Storefront operations only (issue via RLSC model) rather than a full CIF.USG identifies the Requirement as a CIF StoreFront
98Section L.1.8.1To what degree will the Government assess for any mistakes the Government's AI model makes during proposal evaluation?The USG reviews all output from Government AI systems, and any evaluations are supplemental to evaluations done by USG personnel.
99N/AHow will the Government reconcile the discrepancies between eCRAFT labor descriptions and wage data with the Service Contract Labor Standards, which applies to this workforce?Per section L.5.1.12.1, "For labor categories that provide for various skill levels (I, II, III, IV), the Offeror shall select the skill level that best matches the proposed individual and company-specific labor category. For Service Contract Act (SCA) labor categories (if applicable), Offerors may propose an SCA labor category listed in the SCA Directory of Occupations at:

http://www.dol.gov/whd/govcontracts/sca.htm"

100N/A1.Will the Government conduct a pre-proposal conference, industry briefing, site visit, or organized question-and-answer session?Q&A will be released with Amendment 0001, no other conferences, site visits, or briefings are planned at this time.
101N/A1. If so, what are the date, time, location or virtual-access instructions, and registration requirements?N/A
102N/A3.What is the deadline and approved method for submitting solicitation questions?Email, suspense for submitting questions in response to the RFP was 09 July 2026.
103N/A4.Will all Government responses be issued through a formal amendment or posted Q&A document?Q&A will be released with Amendment 0001
104N/A5.Are there any planned amendments, updated attachments, or proposal instructions that have not yet been posted?Other than Amendment 0001, there are no further plans to amend the RFP at this time.
105N/A1. Is the current proposal deadline still August 12, 2026, at 12:00 PM CDT?Yes.
106SolicitationWill the Government please provide the DD-254 to enable Offerors to determine which positions require a Security Clearance?There is no DD254 requirement for this solicitation.