Attachment 0020 Question and Answers IFR Amendment 0004_26 February 2025.pdf
PDF 151 KB Posted
- Attached to
- Renovation of Indoor Firing Range
- Solicitation number
- W519TC25RA003
About this file
This is a Questions and Answers document for an Indoor Firing Range renovation project at KAA, containing 17 contractor questions and government responses. The document clarifies that contractors must submit conceptual drawings to support their technical proposal, which will not count against the 100-page limit. The government specifies that narratives will suffice for Safety Plan, Inspection Plan, Quality Control Plan, and Mobilization Plan, while conceptual drawings are required for Structural Plan and Site Layout Plan.
Key technical requirements include full site asphalt paving from building to existing curb, installation of a fire suppression system per Saudi Building Code 801, and compliance with UFC 4-179-02 for indoor range bulletproofing. The government confirms contractors with outside KSA past performance can participate, but bid-bond bank letters must be from a KSA bank. The original 240-day period of performance can be exceeded if contractors provide realistic justification. Government review periods for design drawings and material submittals will be 3 weeks. Proposals must be submitted under an active SAM-registered contractor, though CR and VAT registered companies can be listed as subcontractors.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Reference (i.e. document - PWS) Reference Text (i.e. paragraph #) Vendor Question/Comment Government Response:
Please confirm whether the contractor needs to submit the 35% drawings along with the proposal.
Contractor shall present conceptual drawings that support/ portray their plan
If the answer is yes, then please confirm that the 35% design drawings will be included in the 100 pages limit of the technical proposal.
The drawings will be in additional to the 100-page limit.
3 Attachment+0010+Section+ L+dated+10+February+2025
Under section #2 technical approach, Bullet point c) specifying
iii. Mobilization Plan (SOW 2.1.9)
a) Safety Plan (SOW 2.1.1)
b) Site Layout Plan (SOW 2.1.3)
c) Inspection Plan (SOW 2.1.8)
iv. Structural Plan (SOW 2.3)
v. Quality Control Plan (SOW 2.1.5)
Please confirm that contractors need to submit all discipline drawings and inspection test plans, or will a narratives satisfy this requirement?
A narrative will satisfy the following: Safety Plan, Inspection Plan, Quality Control Plan, Mobilization Plan.
Conceptual drawings are needed to portray the following:
Structural Plan, Site Layout Plan
Under section 2.2.3 Pavement Pavement Construction specifying o Entire site footprint from the drainage to the existing structure must be asphalted
Please confirm the asphalt pavement required at the perimeter of the building within the chain- link fence.
Yes, Asphalt is required for the full site footprint from the building to the existing curb o For designated areas such as parking, parade fields, and training fields, ensure that:
Please advise on the size and location where the parade fields and the training field are required within the perimeter fence of the range .
No parade or training fields are required for this project.
Please provide the previously approved material submittal or datasheet for the existing package units so we can check the ON and OFF coil temperatures and cooling capacities .
Original material specification package is attached with the most recent amendment. Any additional information about the exact unit will need to be obtained from the manufacturer.
Question Form Project Name : Indoor firing range at KAA
Attachment+0016+Question s+and+Answers+received+vi a+email+prior+to+11+Dece mber+2024
On page #8, the response # 6 specifies that that Proposal shall contain only one best value solution. Technical Proposal shall contain submittal of 35% complete structural remediation plans, 35% complete HVAC plans, 35% Fire Sprinkler Plans and 100% complete Premobilization Plan.
Attachment+0001+IFR+Sco pe+of+Work+06+February+
Attachment+0001+IFR+Sco pe+of+Work+06+February+
Under section 2.5.1 Packaged Units, Existing System Assessment:
o The original design specifies four packaged units (Zamil Air Conditioners;
Model: PTX140; Power Supply: 380/400
If the existing package units do not meet the cooling requirements, then the contractor can propose a new HVAC system with a chiller and FAHU.
Yes. Contractor is expected to propose a new AHU if after testing it is proven the existing systems are inadequate.
The scope of work specifies the installation of exhaust fans. Please confirm if the previous contractor purchased the exhaust fan available on site.
No previous exhaust fans have been found on site.
If the answer is yes, then please provide nameplate photos and the approved datasheet for the existing exhaust fan.
No previous exhaust fans have been found on site.
10 Attachment+0008+QASP+I
FR+11-13-2024
Under AQL# 6 Bullet Proofing All bulletproof padding must meet the required ballistic resistance standards (UFC 4-179-02 and UFC 4-010-06).
Padding should be installed without gaps or weaknesses in coverage, and all doors/windows requiring ballistic protection must be reinforced.
Please advise which particular section or criteria of UFC 4-010-06 needs to comply with this indoor range bulletproofing.
UFC 4-179-02 required for compliance for Indoor Range Bulletproofing. UFC 4-010-06 will not provide any information about this compliance.
Attachment+0001+IFR+Sco pe+of+Work+06+February+
2.9.2 Fire Suppression System
Installation,
• No fire suppression sprinkler system is currently installed within the building.
• A comprehensive fire suppression system is required to cover all areas of the building, including the installation of a fire pump, risers, and a water study to ensure adequate water pressure
As per UFC 4-179-02 4-6 FIRE PROTECTION. The training area and trap area do not require a sprinkler system.
Coordinate with the DFPE early in the design process for detailed requirements for the rest of the building. Provide 2-hour fire rated construction separating the training and direct support areas from indirect support areas. Please confirm whether a fire suppression system is necessary for the firing area of the building
Per Saudi Building Code 801 Fire suppression system is required to be installed in this building. The building must adhere to this standard.
Attachment+0001+IFR+Sco pe+of+Work+06+February+
Under section 2.5.3 Exhaust Fans:
o Install exhaust fans to maintain proper ventilation and negative pressure, ensuring that exhaust systems deliver 7–10% more air than is supplied and maintain a minimum negative pressure of
0.03 inches H₂O.
Model: PTX140; Power Supply: 380/400 V) on the roof, each delivering 100% fresh air at 25,700 CFM. Current site conditions show only three units.
12 Attachment+0010+Section+ L+dated+10+February+2025
Under section # 3. Proposal Volume 3 – Past Performance Factor:
a) The Past Performance Volume shall consist of Previous Historical Contracts that Offeror performed that are Construction and operating in the Kingdom of Saudi Arabia.
Please confirm that a contractor with outside KSA past performance can participate in this solicitation.
Confirm, a contractor with outside KSA past performance can participate in this solicitation.
13 Attachment+0010+Section+ L+dated+10+February+2026
Under section # 2. Proposal Volume 2- Technical Approach under Bullet point # C specifies ii. Schedule of Events
Please confirm a detailed project schedule Gantt chart required or WBS schedule, which includes high-level events or a timeline .
A Schedule is required that lists all the main tasks and provides timelines, and the critical path.
Attachment+0001+IFR+Sco pe+of+Work+06+February+
All work (design and construction) must be completed, and the facility ready for occupancy, no later than two h`undred and fourth days (240) calendar days after the Notice to Proceed (NTP) is issued.
The condition of the project after the award requires a detailed assessment with third parties, labs, and manufacturers. Then, the design of the HVAC system and special items, such as the bullet trap and target holder, needs to be completed, and all these critical items have a very long lead time.
Therefore, we believe that 240 calendar days for this project will not be a realistic timeframe; thus, we request to change the POP to 300 days.
Submit project duration that contractor finds most realistic. This can exceed 240 days.
Review period for design drawing and material submittals
Please confirm how many days the review duration will be for the government to review the contractor's design drawings and material submittals
3 weeks per review.
We would like to add a query about the bid bond/Letter of Guarantee for our submission. Our company is SAM-registered and based in the State of Qatar. Would it be acceptable to issue the bid bond/Letter of Guarantee from a Qatari bank?
For reference, we have successfully followed this approach for our ongoing awarded projects with PSAB, under the 378th ECONS.
Bid-bond bank letter must be from a KSA bank.
Additionally, Prime (Contractor) is registered in KSA, with both a CR and VAT, though its SAM registration is still in progress. Therefore, we will be submitting our bid under Prime (Contractor). Is this acceptable?
Proposal should be submitted under the active SAM registered Contractor. Awards can not be made to SAM-unregistered companies. CR and VAT registered contractors can be listed as sub-contractor with their certificates.