YPG Attachment List-05JAN2024.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- W5168W23R0004
- Issued by
-
Department of the Army
About this file
This document provides details for a federal contract solicitation for base operations support services at Yuma Proving Ground in Arizona. The solicitation seeks proposals for a firm fixed price contract to provide non-personal services such as facilities maintenance, waste management, grounds keeping, and pest control. The period of performance is a 60-day phase-in followed by a base year and four option years, for a total performance period from May 2024 to May 2029. Proposals are due by September 15, 2023 and will be evaluated using lowest price technically acceptable criteria with a tradeoff of past performance and price. The solicitation was issued by the Mission and Installation Contracting Command on behalf of the Army and Yuma Proving Ground.
View the file
Other files
Show 40 more
Latest 50 of 131 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| LIST OF ATTACHMENT AND TECHNICAL EXHIBITS | |
| ATTACHMENTS | |
| Attachment # | Description |
| Attachment A - | Annex A BASOPS-Overarching PWS |
| Attachment B - | Annex B CLS 400 Facilities Maintenance Instructions |
| Attachment C - | Annex C CLS 200 Unaccompanied Personnel Housing Management |
| Attachment D - | Annex E CLS 403 Waste Management |
| Attachment E - | Annex F CLS 404 Grounds |
| Attachment F - | Annex G CLS 408 Sand Removal |
| Attachment G - | Annex H CLS 411 Facilities Maintenance Vertical |
| Attachment H - | Annex J CLS 420 Facilities Maintenance Horizontal |
| Attachment I - | Annex M CLS 510 Pest Management |
| Attachment J - | Pricing Matrix CLIN Structure |
| Attachment K - | Staffing Matrix |
| Attachment L - | Reserved |
| Attachment M - | Collective Bargaining Agreement |
| Attachment N - | Davis-Bacon Heavy |
| Attachment O - | Davis-Bacon Building |
| Attachment P - | Davis-Bacon Highway |
| Attachment Q - | Davis-Bacon Residential |
| Attachment R - | Reserved |
| Attachment S - | Reserved |
| Attachment T - | Past Performance Questionnaire |
| Attachment T-2 | Consent Form for Release of Past Performance Information |
| Attachment T-3 | Specific Relevant Contracts Reference Sheet |
| Attachment U | PIEE CCM Vendor Training |
| Attachment V | Service Contract Wage Determination |
| Attachment W | YPG Site Visit Question and Answer |
| Attachment X | Specific Relevant Contracts Reference Sheet |
| Attachment Y | Cross Reference Matrix |
| Attachment Z | Solicitation Question and Answer |
| TECHNICAL EXHIBIT - Table of Contents | |
| TE # | Description |
| TE# 1 | Real Property |
| TE# 2 | Work Load History |
| TE# 3 | Performance Requirement Summary |
| TE# 4 | Contractor Occupied Facilities |
| TE# 5 | Installed Building Equipment and Equipment In Place |
| TE# 6 | Deliverables |
| TE# 7 | Electrical Substations |
| TE# 8 | ICE PM Checklist |
| TE# 9 | ICE Monthly Visible Emission Checklist |
| TE# 10 | Boiler-Heater Visible Emission Inspection Checklist |
| TE# 10.1 | Boiler Tune Up Form |
| TE# 11 | Boiler Size |
| TE# 12 | Water Storage Tank |
| TE# 13 | Booster Stations |
| TE# 14 | Ground Water Wells |
| TE# 15 | Grounds Inventory |
| TE# 16 | Roads and Test Courses |
| TE# 17 | Petroleum, Oil, Lubricant Facitly Locations and Equipment |
| TE# 18 | Petroleum, Oil, Lubricant Facility BI-Monthly Checklist |
| TE# 19 | Cathodic Protection System Locations |
| TE# 20 | CPS Preventive Maintenance Checklist |
| TE# 21 | Reserved |
| TE# 22 | Labor Category per Functional Area |
| TE# 23 | WaterLess Urinals |
| TE# 24 | Septic Tanks and Locations |
| TE# 25 | GFEBS Field Requirements |
| TE# 26 | ArMA Field Requirements |
| TE# 27 | YPG Installation Guide |
| TE# 28 | Spill Prevention Control and Countermeasures |
| TE# 29 | Stormwater Pollution and Prevention Plan |
| TE# 30 | Wash Racks |
| TE #31 | Disposal of Hazardous Material |
| TE #32 | Heavy Equipment List |
| TE #33 | Uninterrupted Power Supply. |
| TE #34 | Control Devices and Meters |
| TE #35 | Pavement Sweeping Area |
| TE #36 | Excavation Permit Form |
| TE #37 | PWO/IJO History |
| TE #38 | Preventative Maintenance Checklist |
| TE #39 | PWO Format |
| TE #40 | GFEBS Transaction Codes |
| TE #41 | Recurring OWO |
| TE #42 | Governement Furnished Equipment |
| TE #43 | Builder Inventory Guide |
| TE #44 | Builder Condition Manual for Components |
| TE #45 | Builder Inventory and Assessment |
| TE #46 | Builder Component Catalog |
| TE #47 | ATEC Mission Non-Real Property |
| TE #48 | ATEC Mission Non-Real Property Work Load History |
| TE #49 | ARC Equipment and Container |
| TE #50 | Landfill Permit |
| TE #51 | Storm Sewer & Drainage Features |
File details come from the government source that posted it. Updated .