YPG Attachment List-05JAN2024.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
BASE OPERATION SUPPORT SERVICES (BASOPS) FOR YUMA PROVING GROUND (YPG)
Solicitation number
W5168W23R0004
Issued by

About this file

This document provides details for a federal contract solicitation for base operations support services at Yuma Proving Ground in Arizona. The solicitation seeks proposals for a firm fixed price contract to provide non-personal services such as facilities maintenance, waste management, grounds keeping, and pest control. The period of performance is a 60-day phase-in followed by a base year and four option years, for a total performance period from May 2024 to May 2029. Proposals are due by September 15, 2023 and will be evaluated using lowest price technically acceptable criteria with a tradeoff of past performance and price. The solicitation was issued by the Mission and Installation Contracting Command on behalf of the Army and Yuma Proving Ground.

View the file

Other files

File Type Posted
TE_02_Workload_History_CY21_Revised.xlsx XLSX spreadsheet
TE_02_Workload_History_CY20_Revised.xlsx XLSX spreadsheet
TE_02_Workload_History_CY22_Revised.xlsx XLSX spreadsheet
W5168W-23-R-0004-Amendment 0006.pdf PDF
Attachment J- Yuma Pricing Matrix CLIN Structure-W5168W-23-R-0004-24JAN2024.xlsx XLSX spreadsheet
25JAN2024 YPG QandA-W5168W-23-R-0004.xlsx XLSX spreadsheet
TE_02_Workload_History_CY19_Revised.xlsx XLSX spreadsheet
Attachment K - Staffing Matrix-19JAN2024-W5168W-23-R-0004-YPG.xlsx XLSX spreadsheet
Conformed W5168W-23-R-0004.pdf PDF
TE_05_Installed_Building_Equipment_and_Equipment In Place.xlsx XLSX spreadsheet
W5168W23R0004_Amendment_0005.pdf PDF
Attachment Y - CROSS REFERENCE MATRIX-W5168W-23-R-0004.xlsx XLSX spreadsheet
Attachment Z- YUMA Proving Ground Solicitation QA-W5168W-23-R-0004- 05JAN2024-Final.xlsx XLSX spreadsheet
Attachment K - Staffing Matrix-27DEC2023-W5168W-23-R-0004-YPG.xlsx XLSX spreadsheet
TE_51_Storm_Sewer_and_Drainage_Features-05JAN2024.pdf PDF
TE_50_Landfill_Permit-05JAN2024.pdf PDF
Attachment E - YUMA Annex F CLS 404 Grounds 05JAN2024.pdf PDF
Attachment F - YUMA Annex G CLS 408 Sand Removal 05JAN2024.pdf PDF
Attachment D - YUMA Annex E CLS 403 Waste Management 05JAN2024.pdf PDF
Attachment_O_Davis_Bacon_Building_29NOV2023.pdf PDF
TE_15_Grounds_Inventory_05JAN2024.xlsx XLSX spreadsheet
YPG Attachment List-05JAN2024.xlsx XLSX spreadsheet
Attachment_N_Davis_Bacon_Heavy_29NOV2023.pdf PDF
Attachment B - YUMA Annex B CLS 400 Facilities Maintenance Instructions-04JAN2024.pdf PDF
TE_02 _Workload_History_CY20_05JAN2024.xlsx XLSX spreadsheet
Attachment H - YUMA Annex J CLS 420 Facilities Maintenance Horizontal 05JAN2024.pdf PDF
TE_41_Recurring_OWO_05JAN2024.xlsx XLSX spreadsheet
TE_05_Installed_Building_Equipment_and_Equipment In Place-05JAN2024.xlsx XLSX spreadsheet
TE 49 ARC Equipment and Containers-05JAN2024.xlsx XLSX spreadsheet
TE_02_Workload_History_CY19_05JAN2024.xlsx XLSX spreadsheet
Attachment J- Yuma Pricing Matrix CLIN Structure-W5168W-23-R-0004-4JAN2024.xlsx XLSX spreadsheet
Attachment V-W5168W-23-R-0004-YPG-ServiceContract-WageDetermination.pdf PDF
Attachment_Q_Davis_Bacon_Residential_29NOV2023.pdf PDF
TE_0_Table_of_Contents-05JAN2024.xlsx XLSX spreadsheet
TE_38_Preventative_Maintenance_Checklist-05JAN2024.pdf PDF
Attachment A- Annex A-W5168W-23-R-0004-YPG BASOPS-04JAN2024.pdf PDF
Attachment G - YUMA Annex H CLS 411 Facilities Maintenance Vertical-04JAN2024.pdf PDF
TE_02_Workload_History_CY22_05JAN2024.xlsx XLSX spreadsheet
Attachment I - YUMA Annex M CLS 510 Pest Management 05JAN2024.pdf PDF
Attachment_P_Davis_Bacon_Highway_29NOV2023.pdf PDF
TE_01_Real_Property_Inventory-05JAN2024.xlsx XLSX spreadsheet
TE_16_Roads_and_Test_Courses_05JAN2024.xlsx XLSX spreadsheet
TE 15 Grounds Inventory-05JAN2024.xlsx XLSX spreadsheet
TE_02_Workload_History_CY21_05JAN2024.xlsx XLSX spreadsheet
YUMA Proving Ground Solicitation QA-W5168W-23-R-0004- 05JAN2024-Final.xlsx XLSX spreadsheet
Amendment 0004-YPG-W5168W-23-R-0004-5JAN2024.pdf PDF
W5168W-23-R-0004-Solicitation Closing Date Extened-Formal Amendment ForthComing-29DEC2023.pdf PDF
W5168W-23-R-0004-Amendment3.pdf PDF
W5168W-23-R-0004-Amendment0002-1NOV2023.pdf PDF
Amendment 18 OCT 2023 W5168W 23 R 0004 YPG.pdf PDF
Show 40 more

Latest 50 of 131 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

LIST OF ATTACHMENT AND TECHNICAL EXHIBITS
ATTACHMENTS
Attachment #Description
Attachment A -Annex A BASOPS-Overarching PWS
Attachment B -Annex B CLS 400 Facilities Maintenance Instructions
Attachment C -Annex C CLS 200 Unaccompanied Personnel Housing Management
Attachment D -Annex E CLS 403 Waste Management
Attachment E -Annex F CLS 404 Grounds
Attachment F -Annex G CLS 408 Sand Removal
Attachment G -Annex H CLS 411 Facilities Maintenance Vertical
Attachment H -Annex J CLS 420 Facilities Maintenance Horizontal
Attachment I -Annex M CLS 510 Pest Management
Attachment J -Pricing Matrix CLIN Structure
Attachment K -Staffing Matrix
Attachment L -Reserved
Attachment M -Collective Bargaining Agreement
Attachment N -Davis-Bacon Heavy
Attachment O -Davis-Bacon Building
Attachment P -Davis-Bacon Highway
Attachment Q -Davis-Bacon Residential
Attachment R -Reserved
Attachment S -Reserved
Attachment T -Past Performance Questionnaire
Attachment T-2Consent Form for Release of Past Performance Information
Attachment T-3Specific Relevant Contracts Reference Sheet
Attachment UPIEE CCM Vendor Training
Attachment VService Contract Wage Determination
Attachment WYPG Site Visit Question and Answer
Attachment XSpecific Relevant Contracts Reference Sheet
Attachment YCross Reference Matrix
Attachment ZSolicitation Question and Answer
TECHNICAL EXHIBIT - Table of Contents
TE #Description
TE# 1Real Property
TE# 2Work Load History
TE# 3Performance Requirement Summary
TE# 4Contractor Occupied Facilities
TE# 5Installed Building Equipment and Equipment In Place
TE# 6Deliverables
TE# 7Electrical Substations
TE# 8ICE PM Checklist
TE# 9ICE Monthly Visible Emission Checklist
TE# 10Boiler-Heater Visible Emission Inspection Checklist
TE# 10.1Boiler Tune Up Form
TE# 11Boiler Size
TE# 12Water Storage Tank
TE# 13Booster Stations
TE# 14Ground Water Wells
TE# 15Grounds Inventory
TE# 16Roads and Test Courses
TE# 17Petroleum, Oil, Lubricant Facitly Locations and Equipment
TE# 18Petroleum, Oil, Lubricant Facility BI-Monthly Checklist
TE# 19Cathodic Protection System Locations
TE# 20CPS Preventive Maintenance Checklist
TE# 21Reserved
TE# 22Labor Category per Functional Area
TE# 23WaterLess Urinals
TE# 24Septic Tanks and Locations
TE# 25GFEBS Field Requirements
TE# 26ArMA Field Requirements
TE# 27YPG Installation Guide
TE# 28Spill Prevention Control and Countermeasures
TE# 29Stormwater Pollution and Prevention Plan
TE# 30Wash Racks
TE #31Disposal of Hazardous Material
TE #32Heavy Equipment List
TE #33Uninterrupted Power Supply.
TE #34Control Devices and Meters
TE #35Pavement Sweeping Area
TE #36Excavation Permit Form
TE #37PWO/IJO History
TE #38Preventative Maintenance Checklist
TE #39PWO Format
TE #40GFEBS Transaction Codes
TE #41Recurring OWO
TE #42Governement Furnished Equipment
TE #43Builder Inventory Guide
TE #44Builder Condition Manual for Components
TE #45Builder Inventory and Assessment
TE #46Builder Component Catalog
TE #47ATEC Mission Non-Real Property
TE #48ATEC Mission Non-Real Property Work Load History
TE #49ARC Equipment and Container
TE #50Landfill Permit
TE #51Storm Sewer & Drainage Features

File details come from the government source that posted it. Updated .