Attachment F - YUMA Annex G CLS 408 Sand Removal 05JAN2024.pdf

PDF 34 KB Posted

Attached to
BASE OPERATION SUPPORT SERVICES (BASOPS) FOR YUMA PROVING GROUND (YPG)
Solicitation number
W5168W23R0004
Issued by

About this file

This document includes a Performance Work Statement (PWS) and related solicitation for base operations support services at Yuma Proving Ground in Arizona. The contractor will provide services including pavement clearance and sand removal on roads, parking areas, sidewalks, airfields and other paved surfaces when accumulations reach one inch or more. The contractor must also perform quarterly pavement sweeping using magnetic and vacuum sweepers. The contractor is responsible for coordinating vehicle removal and ensuring safety during sand and gravel removal operations. The related solicitation is a firm fixed-price contract for base operation support services at Yuma Proving Ground over a five-year period from May 2024 to May 2029. The solicitation was issued on August 23rd, 2023, with questions due by September 15th and award to be made based on lowest price technically acceptable proposal with a tradeoff of past performance and price.

View the file

Other files

File Type Posted
TE_02_Workload_History_CY21_Revised.xlsx XLSX spreadsheet
TE_02_Workload_History_CY20_Revised.xlsx XLSX spreadsheet
TE_02_Workload_History_CY22_Revised.xlsx XLSX spreadsheet
W5168W-23-R-0004-Amendment 0006.pdf PDF
Attachment J- Yuma Pricing Matrix CLIN Structure-W5168W-23-R-0004-24JAN2024.xlsx XLSX spreadsheet
25JAN2024 YPG QandA-W5168W-23-R-0004.xlsx XLSX spreadsheet
TE_02_Workload_History_CY19_Revised.xlsx XLSX spreadsheet
Attachment K - Staffing Matrix-19JAN2024-W5168W-23-R-0004-YPG.xlsx XLSX spreadsheet
Conformed W5168W-23-R-0004.pdf PDF
TE_05_Installed_Building_Equipment_and_Equipment In Place.xlsx XLSX spreadsheet
W5168W23R0004_Amendment_0005.pdf PDF
Attachment Y - CROSS REFERENCE MATRIX-W5168W-23-R-0004.xlsx XLSX spreadsheet
Attachment Z- YUMA Proving Ground Solicitation QA-W5168W-23-R-0004- 05JAN2024-Final.xlsx XLSX spreadsheet
Attachment K - Staffing Matrix-27DEC2023-W5168W-23-R-0004-YPG.xlsx XLSX spreadsheet
TE_51_Storm_Sewer_and_Drainage_Features-05JAN2024.pdf PDF
YPG Attachment List-05JAN2024.xlsx XLSX spreadsheet
TE_50_Landfill_Permit-05JAN2024.pdf PDF
Attachment E - YUMA Annex F CLS 404 Grounds 05JAN2024.pdf PDF
Attachment D - YUMA Annex E CLS 403 Waste Management 05JAN2024.pdf PDF
Attachment_O_Davis_Bacon_Building_29NOV2023.pdf PDF
TE_15_Grounds_Inventory_05JAN2024.xlsx XLSX spreadsheet
YPG Attachment List-05JAN2024.xlsx XLSX spreadsheet
Attachment_N_Davis_Bacon_Heavy_29NOV2023.pdf PDF
Attachment B - YUMA Annex B CLS 400 Facilities Maintenance Instructions-04JAN2024.pdf PDF
TE_02 _Workload_History_CY20_05JAN2024.xlsx XLSX spreadsheet
Attachment H - YUMA Annex J CLS 420 Facilities Maintenance Horizontal 05JAN2024.pdf PDF
TE_41_Recurring_OWO_05JAN2024.xlsx XLSX spreadsheet
TE_05_Installed_Building_Equipment_and_Equipment In Place-05JAN2024.xlsx XLSX spreadsheet
TE 49 ARC Equipment and Containers-05JAN2024.xlsx XLSX spreadsheet
TE_02_Workload_History_CY19_05JAN2024.xlsx XLSX spreadsheet
Attachment J- Yuma Pricing Matrix CLIN Structure-W5168W-23-R-0004-4JAN2024.xlsx XLSX spreadsheet
Attachment V-W5168W-23-R-0004-YPG-ServiceContract-WageDetermination.pdf PDF
Attachment_Q_Davis_Bacon_Residential_29NOV2023.pdf PDF
TE_0_Table_of_Contents-05JAN2024.xlsx XLSX spreadsheet
TE_38_Preventative_Maintenance_Checklist-05JAN2024.pdf PDF
Attachment A- Annex A-W5168W-23-R-0004-YPG BASOPS-04JAN2024.pdf PDF
Attachment G - YUMA Annex H CLS 411 Facilities Maintenance Vertical-04JAN2024.pdf PDF
TE_02_Workload_History_CY22_05JAN2024.xlsx XLSX spreadsheet
Attachment I - YUMA Annex M CLS 510 Pest Management 05JAN2024.pdf PDF
Attachment_P_Davis_Bacon_Highway_29NOV2023.pdf PDF
TE_01_Real_Property_Inventory-05JAN2024.xlsx XLSX spreadsheet
TE_16_Roads_and_Test_Courses_05JAN2024.xlsx XLSX spreadsheet
TE 15 Grounds Inventory-05JAN2024.xlsx XLSX spreadsheet
TE_02_Workload_History_CY21_05JAN2024.xlsx XLSX spreadsheet
YUMA Proving Ground Solicitation QA-W5168W-23-R-0004- 05JAN2024-Final.xlsx XLSX spreadsheet
Amendment 0004-YPG-W5168W-23-R-0004-5JAN2024.pdf PDF
W5168W-23-R-0004-Solicitation Closing Date Extened-Formal Amendment ForthComing-29DEC2023.pdf PDF
W5168W-23-R-0004-Amendment3.pdf PDF
W5168W-23-R-0004-Amendment0002-1NOV2023.pdf PDF
Amendment 18 OCT 2023 W5168W 23 R 0004 YPG.pdf PDF
Show 40 more

Latest 50 of 131 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex G (CLS 408 Sand Removal) to OPORD 18-011: IMCOM Enterprise Base Oper-ations (BASOPS) Performance Work Statement (PWS) Templates (U)

Annex G

Sand Removal

11-23-21

Table of Contents

1.0GENERAL INFORMATION

1.1Overview

1.2 Snow, Ice, and Sand Removal Plan

2.0DESCRIPTION OF SERVICES

2.1Scope

2.1.1Specialized Locations

2.1.2Sidewalks

2.2 Removal Priorities

2.3 Pre-Treatment and clearing

2.3.1De-icing Material/Sand/Salt

2.3.2Ice Control Abrasives

2.4De-icing Supplies

2.4.1On-Call De-icing Materials

2.4.2Snow Plowing and Ice Removal Standby

2.5Pavement Sweeping

2.5.1 Airfields

2.6Inoperable Vehicles

2.7Safety

1.0 General Information.

1.1 Overview. The Contractor shall provide pavement clearance services, to include street sweeping and sand removal services, on paved driving/parking areas and side roads, as annotated on Technical Exhibit (TE) #01 Real property and TE #16 Roads and Test Courses. Services shall commence when sand or asphalt gravel height ex-ceeds one (1) inch, or when requested from the Contracting Officer (KO), Contracting Officer Representative (COR) or Alternate Contracting Officer Representative (ACOR).

1.2 Snow, Ice, and Sand Removal Plan. N/A

1.2.1 Airfield Sand Removal. Contractor shall perform sand removal in accordance with (IAW) AR 420-1 (para 7-15) and Federal Aviation Administration (FAA) requirements.

The contractor shall include remove sand and gravel from the runway and the respec-tive priority to keep the Airfield operational. This service shall be completed as part of the Preventative Maintenance Plan (PMP). The Airfield Operations may supersede the priority plan in the event the airfield is closed for other reasons. This will be communi-cated to the Contractor by the Emergency Operations Center (EOC) or the COR during the events.

2.0 Description of Services.

2.1 Scope. Pavement clearance includes, but is not limited to, the following: sweeping of sand and gravel from roads, access control points (ACP), railroads, airfield pave-ments, taxiways, aprons, driveways and parking areas by pushing and piling the sand and gravel into adjacent areas and removing sand. Historical data on routine pavement clearing (street sweeping) and sand removal is provided by the Directorate of Public Works (DPW) in TE #02 Workload History. The Contractor shall begin clearing areas when accumulations have reached one (1) inch or within two (2) hours of notification by the COR/ACOR. Sand and gravel removal shall be cleared from walkways, doorways, and gates to provide full opening and safe access for personnel and equipment. Sand and gravel piles shall not be left in the plowed or swept areas. The Contractor shall per-form sand and gravel services to maintain free from hazard sidewalks, steps, handi-capped ramps, fire hydrants and access to buildings and essential facilities.

2.1.1 Specialized Locations. Howard Cantonment Area, Walker Cantonment Area, La-guna Army Airfield (LAAF), Kofa Fire Range, Kofa Cantonment Area.

2.1.1.1 Paved Roads and Access Control Points (ACP). The Contractor shall clear roads and ACPs. The Contractor shall clear primary roads to support the safe move-ment of emergency vehicles. The Contractor shall ensure all ACPs are operational at all times, regardless of storm intensity. The Contractor shall deploy the assets neces-sary to ensure the road network is trafficable. Once removal operations commence, the Contractor shall continue these operations until sand and gravel is removed from the full width of streets, including intersections. The Contractor shall clear all primary roads

NLT 0600 hours. The COR/ACOR will inform the Contractor of the revised clearance times, should there be a delay in opening or closure.

2.1.1.2 Parking Areas. The Contractor shall clear parking areas. Sand and gravel shall be removed from the full width of the parking areas.

2.1.2 Sidewalks. The Contractor shall clear sidewalks when accumulation reaches half inch (½) or as requested by the KO/COR. Sidewalks shall receive a complete clearing at the end of each storm occurrence or when adjacent areas have been edged or de-weeded.

2.1.2.1 Snow Shoveling and Ice Removal. N/A

2.1.2.2 Catch Basins. The Contractor shall remove sand from all catch basins to allow free drainage. This applies in rare instances where the sand accumulates and prevents draining. The Contractor shall clear basins at the end of each sand, rain or monsoon storm.

2.1.2.3 Hydrants. The Contractor shall remove sand and vegetation from and around the hydrants to ensure access. The cleared area shall be, at a minimum, approximately three (3) feet in radius from the hydrant. The Contractor shall clear access to hydrants at the end of each storm. The contractor shall repair any erosion around hydrants that may occur from a storm or during hydrant flushing.

2.1.2.4 Dumpsters. The Contractor shall remove sand, vegetation and debris from and around the dumpsters to allow for pedestrian access to dispose of refuse. The Contrac-tor shall clear access to dumpsters at the end of each storm.

2.1.2.5 Heating, Ventilation and Air Conditioning (HVAC) Clearing. The Contractor shall ensure HVAC units are kept clear of sand and vegetation and all control panels are accessible from all sides.

2.1.2.6 Sand or Snow Stockpile Removal. N/A

2.2 Removal Priorities. N/A

2.3 Pre-Treatment and clearing. The Contractor shall ensure safe walking and driving conditions by immediately removing sand and gravel from accumulated areas. The Contractor shall coordinate with the COR/ACOR to pre-treat areas with sandbags or waddles for forecasted storms.

2.3.1 De-icing Material/Sand/Salt. N/A

2.3.2 Ice Control Abrasives. N/A

2.4 De-icing Supplies. N/A

2.4.1 On-Call De-icing Materials. N/A

2.4.2 Snow Plowing and Ice Removal Standby. N/A

2.5 Pavement Sweeping. The Contractor shall sweep the pavement areas specified in TE #35 Pavement Sweeping using magnetic and vacuum sweepers quarterly. Areas to be swept include, but are not limited to: paved streets, parking areas, sidewalks, run-ways, taxiways, aprons, jogging paths etc. Materials collected from pavement sweeping shall be disposed of.

2.5.1 Airfields. Airfields have special considerations to prevent hazards. LAAF requires a Foreign Object Damage (FOD) Prevention Program. The Contractor shall adjust op-erations and sweeping frequencies to meet the FOD Prevention Program requirements.

2.6 Inoperable Vehicles. The Contractor shall coordinate with the COR to have all op-erable and inoperable vehicles moved to a designated location to not interfere with sand and asphalt gravel removal. The Contractor shall assume liability for damages to vehicles caused by Contractor employee negligence.

2.7 Safety. The Contractor shall ensure sand and asphalt gravel removal equipment that is slow moving or otherwise creates an unsafe condition are clearly visible to on-coming traffic and bystanders (e.g., equipped with rotating or flashing amber lights).

File details come from the government source that posted it. Updated .