This performance work statement and related solicitation provide details for base operations support services at Yuma Proving Ground in Arizona. The U.S. Army seeks a contractor to perform services including facility maintenance, grounds maintenance, roads and pavement maintenance, utilities operations, and test support. The contract type will be firm-fixed-price, with the award going to the lowest price technically acceptable offer. The period of performance is a phase-in period followed by a one-year base period and four one-year options, for a total of five years if all options are exercised. Questions are due by September 15, 2023 and the anticipated start date is May 20, 2024.
View the file
Other files
Show 40 more
Latest 50 of 131 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex J (CLS 420 Facilities Maintenance Horizontal) to OPORD18-011: IMCOM Enter-prise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
Annex J
Facility Maintenance –
Horizontal
11-16-23
Annex J (CLS 420 Facilities Maintenance Horizontal) to OPORD18-011: IMCOM Enter-prise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
Table of Contents
1.0 General Information. 3
1.1 Overview 3
1.2 Components 3
1.2.1 Surfaced Areas 3
1.2.2 Test Support 3
1.3 Work Management and Control 3
1.3.1 Reporting Requirements 3
1.3.2 Test Coordination 3
1.3.3 Test Support 4
1.3.4 Publications and Forms 5
2.0 Description of Services. 5
2.1 Surfaced Areas 5
2.1.1 Pothole Repair 6
2.1.2 Road Pavement Marking 6
2.1.3 Range Road Maintenance 6
2.1.4 Tank Trails 6
2.1.5 Bridge Maintenance 6
2.1.6 Dam & Retention Pond Maintenance 6
2.1.7 Traffic Control Painting 6
2.1.8 Golf Courses 7
2.2 Test Support 7
2.2.1 General Requirements 7
2.2.2 Test Coordination 7
2.2.3 Test-Site Maintenance and Repair 7
2.2.4 Moving of Test Site Material 8
2.2.5 Test course maintenance 8
2.2.6 Training 8
2.3 Support Services 8
2.3.1 Blue Stake Service 8
3.0 Work Capability Levels 10
Annex J (CLS 420 Facilities Maintenance Horizontal) to OPORD18-011: IMCOM En-terprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
1.0 General Information.
1.1 Overview. The Contractor shall perform maintenance and repair of surfaced ar-eas, including asphalt and cement concrete pavements, gravel and earth surfaced ar-eas, and associated structures. The Contractor shall inspect, repair, and maintain the components associated with facilities listed in real property records. Work shall be per-formed by qualified personnel in accordance with (IAW) applicable laws and regula-tions.
1.2 Components.
1.2.1 Surfaced Areas. Surfaced areas covered under this contract include, but are not limited to, the following.
a. Paved and unpaved roadways, trails, and shoulders
b. Paved and unpaved parking areas
c. Sidewalks
d. Curbs
e. Vehicle storage and staging yards
f. Maintenance yards
g. Supply yards
1.2.2 Test Support. The Contractor shall provide heavy equipment support (Govern-ment-owned) listed in Technical Exhibit TE #32 Heavy Equipment List. This support re-quires trained heavy equipment operators and work schedule is subject to unpredicta-bility in the test mission operations. The Contractor's responsibility includes but is not limited to the following general areas:
a. Test-Site Maintenance and Repair
b. Moving of Test Site Material
c. Test course maintenance
1.3 Work Management and Control.
1.3.1 Reporting Requirements. The Contractor shall provide a weekly list of all roads and test courses maintained the previous week to the COR. The Contractor shall annu-ally update the Unpaved Roads Maintenance Schedule, at TE #16, Roads and Test Courses, and submit to the COR during the month of October. The schedule shall in-clude recommendations on increases and decreases of maintenance frequencies and additions and deletions of roads and trails.
1.3.2 Test Coordination. The Contractor shall coordinate with all divisions of the Yuma Test Center and attend the weekly test scheduling meeting. Test mission work shall be properly planned to ensure that test setups are complete, and work is accomplished to meet test objectives.
1.3.3 Test Support. The Contractor shall perform all heavy equipment support re-quired by the testing mission at YPG. This support requires trained heavy equipment operators and work schedule is subject to unpredictability in the test mission opera-tions.
1.3.3.1 Test-Site Maintenance and Repair. The Contractor shall perform maintenance and repair projects on gun positions, camera sites, impact areas, test vehicle courses, dust courses, drop zones, target areas, roads and trails IAW the test mission require-ments. Clearing and grading of impact areas is potentially hazardous work. All work tasks within range areas shall be coordinated with YPG Range Control.
1.3.3.2 Moving of Test Site Material. The Contractor shall load, unload, and transport all test-related material and equipment between different locations on the range. Test support tasks shall include, but is not limited to, the following: loading, transporting, un-loading, setting, and repositioning bomb proofs, blast shields, trail plates, gun mounts, gun tubes, shades, camera blast deflectors, armored plates, and other assorted equip-ment required for the testing mission. The Contractor shall have an approved crane safety program and shall adhere to YPG 385-1 and USACE EM 385-1-1.
1.3.3.3 Test course maintenance includes but is not limited to those courses listed in TE #16, Roads and Test Courses. Test course maintenance will vary with the testing mission and shall be scheduled as required IAW guidance from the COR.
1.3.3.4 Grading. The Contractor shall maintain all un-paved roadway surfaces to a fin-ished grade. When practical, water will be utilized in conjunction with all grading activi-ties. The traveled way and shoulders shall be graded to provide a shaped and dressed surface.
1.3.3.6 Finished Roadway. The Contractor shall maintain all finished surfaces, includ-ing excavated and filled sections and adjacent transition areas, in a condition which is smooth, compacted, and free from irregular surface changes with the degree of finish ordinarily obtainable from blade-grader operations, except as otherwise specified.
Ditches and gutters shall be finished to permit adequate drainage.
1.3.3.7 Traffic Control: The Contractor shall provide traffic control and post warning signs during all OM&R activities. Most roadway and airfield paved areas will remain in operation during these activities.
1.3.3.8 Ensuring After-Hours Traffic Accommodation. Prior to the suspension of daily work, the Contractor shall take all precautions as might be necessary to leave all travel ways in a condition suitable for traffic. Windrows shall not be left on the roadway over-night.
1.3.3.9 Borrow Material. The Contractor shall have an approved YPG Dig Permit prior to creating or substantially enlarging a borrow pit. Material shall be selected to meet re-quirements and conditions of the particular fill for which it is to be used. The Contractor shall perform all clearing, grubbing, access development, and overburden removal at the borrow sites. The Contractor shall ensure the borrow pits are conditioned in such a manner as not to cause a safety or environmental hazard upon completion of the work.
1.3.3.10 Protected Plants: All plant species protected by law which are located within a construction zone shall be relocated by the Contractor IAW the Arizona Native Plant Law, http://www.azda.gov/esd/nativeplants.htm. Prior to any relocation activities, ap-proval shall be requested from the COR and the ESD.
1.3.3.11 Storm Damage: The Contractor shall respond within one hour after the storm to perform emergency repairs to paved and unpaved roads due to inclement weather during duty and non-duty hours. The Contractor shall ensure that all paved and un-paved roads are returned to code.
1.3.3.12 Paved Surface Maintenance and Repair. The Contractor shall be responsible for a limited amount of work on paved surfaces. This work shall include maintenance, and repair of paved roads shoulders, installation, and replacement of parking bumpers, repair of utility cuts, and potholes and parking lot striping and limited paved road strip-ing.
1.3.3.13 Paved Road Shoulders. The Contractor shall perform scheduled maintenance on paved roads shoulders IAW TE #16, Roads and Test Courses. The finished shoul-der surface shall be smooth, relatively flat, and free from any drop-offs between the paved road surface and the shoulder surface.
1.3.3.14 Sweeping. N/A
1.3.3.15 Airfield Clearance. The Contractor shall obtain clearance from airfield opera-tions personnel to perform maintenance work on the airfield in order to minimize dis-ruption of airfield traffic.
1.3.4 Publications and Forms. Specific publications and forms required for the accom-plishment of work described in this CLS service.
2.0 Description of Services.
2.1 Surfaced Areas. The Contractor shall perform corrective paving actions as needed to surfaced areas including but not limited to roads and trails, test courses, test sites, paved road shoulders and airfield shoulders, taxiways and other improved ground areas. These actions include adding dirt and gravel to roadways and parking areas, repairing asphalt, regrading, repainting, repairing potholes, clearing drainage ar-eas. The Contractor shall maintain and repair all paved surfaces, including flexible and rigid pavements, paved roads, paved parking areas, sidewalks, recreational areas, road shoulders, drainage systems, ramps, curbs, gutters, and erosion control areas to include any necessary form work for concrete pours. The Contractor shall comply with the maintenance instructions provided by the PMP. When operating heavy equipment, the Contractor will follow all YPG command garrison and LRC guidance. Heavy equip-ment identified in TE #32 Heavy Equipment shall be transported by trailer to the job http://www.azda.gov/esd/nativeplants.htm site. The Contractor shall perform daily vehicle Preventative Maintenance Checks and Services (PMCS) for all heavy equipment. The Contractor shall perform scheduled maintenance on paved roads shoulders IAW TE #16, Roads and Test Courses. The finished shoulder surface shall be smooth, relatively flat, and free from any drop-offs between the paved road surface and the shoulder surface.
2.1.1 Pothole Repair. Contractor shall repair Potholes according to IAW established approved plans, technical manuals, Unified Facilities Criteria (UFC), and Army Regula-tions at location identified in TE#01 Real Property and TE #16, Roads and Test Courses. The Contractor shall perform repairs using the same material as the adjacent areas and shall obtain approval from the COR.
2.1.2 Road Pavement Marking. The Contractor shall mark pavement in dry weather when the temperature exceeds forty (40) degrees Fahrenheit. The Contractor shall be responsible for putting up and removing any necessary safety barriers (e.g., cones and signs).
2.1.2.1 Crosswalk Painting. When directed by the KO/COR, the Contractor shall paint crosswalks and maintain crosswalks and signs.
2.1.3 Range Road Maintenance. The Contractor shall perform annual preventative maintenance, grading, and graveling of range roads identified in TE #16. Replacement gravel shall match the existing surface, unless otherwise directed by the COR.
2.1.4 Tank Trails. The Contractor shall perform maintenance, grading, and graveling of tank roads identified in TE #16, Roads and Test Courses. Replacement gravel shall match the existing surface, unless otherwise directed by the COR.
2.1.5 Bridge Maintenance. N/A
2.1.6 Dam & Retention Pond Maintenance. N/A
2.1.6.1 Pop-Up Barricades. The Contractor shall perform recurring maintenance on the Pop-up Barricades and correct all deficiencies required during maintenance. The Contractor shall prepare and maintain a log of all maintenance performed and provide a copy of log to DPW within five (5) working days of completion. The Contractor shall request a work document for all repairs found that are above the recurring mainte-nance requirements. The locations of the Pop-Up Barricades are as follows.
Walker Cantonment Area (WCA) Howard Cantonment Area (HCA) Laguna Canton-ment Area (LCA) Kofa Firing Range (KFR)
2.1.7 Traffic Control Painting. When directed by the KO/COR, the Contractor shall stripe and paint paved roads, streets, parking areas, airfield runways, taxi areas, curbs, barricades, and all other traffic control markings to include but not limited to ar-eas within TE #01 Real property and TE #16 Roads and Test Courses. All road and parking area painting over two hundred square feet (200 sq ft) will be accomplished via a PWO. The Contractor shall stripe all new overlay, new paved roads, and streets IAW the following:
• Manual of Uniform Traffic Control Devices
• U.S. Department of Transportation Federal Highways Administration
2.1.7.1 Parking Areas. When directed by the KO/COR, the Contractor shall paint parking area stripes four to six inches (4" to 6") in width with white traffic paint and en-sure that all specifications, prints, and drawings comply with required specifications.
The Contractor shall coordinate parking area striping when parking areas require re-striping or new layouts with DPW to minimize disruption of traffic flow and parking. The Contractor shall use traffic cones and barricades, for traffic control in parking areas be-ing striped. The Contractor shall stripe heavy traffic flow areas during the early morning (5:30 a.m.), and late evening (7:00 p.m.) hours. The Contractor shall seal off painted areas with traffic cones and barricades when painting until painted area is dry. The Contractor shall paint striping and traffic control markings on designated parking areas.
Handicap parking spaces will be done on Recurring Maintenance to include signs.
2.1.7.2 Streets, Roads, and Highways. When directed by the KO/COR, the Contrac-tor shall stripe any portion of approximately 98 miles of roads and streets on the In-stallation. The Contractor shall stripe center lines, pavement edge lines, traffic con-trol makings, stop bars, guard rails, and any other traffic control markings and de-vices. The Contractor shall provide the DPW a work request describing deficient traf-fic control markings within five (5) working days of discovery. The Contractor shall use traffic paint and reflective beads that meet or exceed all Federal Specifications.
2.1.7.3 Crosswalks. When directed by the KO/COR, the Contractor shall paint and maintain crosswalks, stop bars and pavement markings related to school pedestrian and vehicle traffic control during the first (1st) week of August, and the first week of January, weather permitting on Recurring Maintenance.
2.1.8 Golf Courses. N/A
2.2 Test Support.
2.2.1 General Requirements. The Contractor shall perform all heavy equipment sup-port required by the testing mission at YPG. This support requires trained heavy equip-ment operators and work schedule is subject to unpredictability in the test mission op-erations.
2.2.2 Test Coordination. The Contractor shall coordinate with all divisions of the Yuma Test Center and attend the weekly test scheduling meeting. Test mission work shall be properly planned to ensure that test setups are complete, and work is accom-plished to meet test objectives.
2.2.3 Test-Site Maintenance and Repair. The Contractor shall perform maintenance and repair projects on gun positions, camera sites, impact areas, test vehicle courses, dust courses, drop zones, target areas, roads, and trails IAW the test mission require-ments. Clearing and grading of impact areas is potentially hazardous work. All work tasks within range areas shall be coordinated with YPG Range Control.
2.2.4 Moving of Test Site Material. The Contractor shall load, unload, and transport all test-related material and equipment between different locations on the range. Test support tasks shall include, but is not limited to, the following. loading, transporting, un-loading, setting, and repositioning bomb proofs, blast shields, trail plates, gun mounts, gun tubes, shades, camera blast deflectors, armored plates, and other assorted equip-ment required for the testing mission. The Contractor shall have an approved crane safety program and shall adhere to YPG 385-1 and USACE EM 385-1-1.
2.2.5 Test course maintenance includes but is not limited to those courses listed in TE #16, Roads and Test Courses. Test course maintenance will vary with the testing mission and shall be scheduled as required IAW guidance from the COR.
2.2.6 Training. Standard twenty-four (24) hour OSHA training is required for landfill operators and supervisors receive an additional eight (8) hours of training. Water truck shall be used to minimize fugitive dust emissions from landfill operations. Certification shall be provided to the COR.
2.3 Support Services.
2.3.1 Blue Stake Service. The Contractor shall perform and provide blue stake ser-vice for all requests processed by the Operations and Management Branch. Blue stake service shall be performed on “all utility lines” no matter the presumed depth upon receipt of a valid work document per AZ-811 Underground Facilities Law/Blue Stake Law-ARS Chapter 2 Article 6.3 sections 40-360.21 through 40-360.32. There is an average of 167 requests for utility clearance per year that varies in size of area covered in each request.
2.3.1.1 The Contractor shall mark the locations of underground or otherwise detected water, fuel, sewer, and electric lines by staking, painting, or other means, as site con-ditions warrant. The blue stake markings are valid for fifteen (15) working days ex-cluding weekends and holidays, except in the event of weather-related re-markings where markings have been washed away then the Contractor shall remark, and blue stake will be valid for fifteen (15) working days excluding weekend and holidays from the date of the re-mark.
2.3.1.2 The Contractor shall when providing clearances in a congested area with different underground utilities present, shall pothole the area until all the under-ground water, gas and sewer lines have been identified.
2.3.1.3 The Contractor shall when utilities cannot be identified from the "As built" drawings or from any other reference, shall pothole the suspected utility until found and it is properly identified.
2.3.1.4 The Contractor shall, in the course of providing an underground clearance, the Contractor discovers any changes in direction, size, or type of utilities in compari-son to the "As-built" drawings, the Contractor shall make corrections on the "As-built" drawings and furnish a copy to the COR, or designated representative, to update "As- built" drawings or maps.
2.3.1.5 The Contractor shall complete the underground clearance request within two
(2) working days after the issue date of the work document or IAW the priority of the work document, whichever is sooner. All Blue Staking shall be performed on an existing Demand Maintenance Order or work order that’s been issued for a particular job. An ad-ditional Demand Maintenance Order will not be created for Blue Stake Services. In the event the utility cannot be found within the Demand Maintenance Order limit, the work is to be completed under an Operational Work Order.
2.3.1.6 The Contractor shall in areas where blue staking is questionable to be per-formed such as grading of parking lots, road shoulders, clean up with back hoes etc.
The Contractor shall get written approval from the Roads & Grounds QAE prior to such work.
Annex J (CLS 420 Facilities Maintenance Horizontal) to OPORD18-011: IMCOM Enterprise Base Op-erations (BASOPS) Performance Work Statement (PWS) Templates (U)
3.0 Work Capability Levels.
TASK/SERVICE CAPABILITY 1 CAPABILITY 2 CAPABILITY 3
Routine Task/Service No. DMO/PMO for FY 20XX
Estimated
Labor Hours
Included level of service
Included level of service
Included level of service
DMO - Facility Maintenance Priority 1 "Interior & Exterior
Plumbing Shop"
DMO - Priority 1 "Sign Shop" · · · DMO - Priority 1 "Exterior Electrical Shop" · · · DMO - Priority 1 "Roads & Grounds" · · · PMO - Facility Maintenance Preventative Maintenance "Interior &
Exterior Plumbing Shop"
PMO - Facility Maintenance Preventative "Exterior Electrical
Shop"
DMO - Facility Maintenance Priority 2 "Interior & Exterior
Plumbing Shop"
DMO - Priority 2 "Sign Shop" · · · DMO - Priority 2 "Exterior Electrical Shop" · · · DMO - Priority 2 "Roads & Grounds" · · · DMO - Priority 3 "Roads & Grounds" · · PMO - Facility Maintenance Preventative "Roads & Groands" · · DMO - Facility Maintenance Priority 3 "Interior & Exterior
Plumbing Shop"
DMO - Priority 3 "Sign Shop" · DMO - Priority 3 "Exterior Electrical Shop" · PMO - Facility Maintenance Preventative "Sign Shop" ·
Total for
Capability 1
Total for
Capability 2
Total for
Capability 3
DPW Provided Info
Total